6-K 1 d33857d6k.htm FORM 6-K Form 6-K

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER

Pursuant to Rule 13a-16 or 15d-16

under the Securities Exchange Act of 1934

For the Month of September 2026

Commission File Number 001-13372

KOREA ELECTRIC POWER CORPORATION

(Translation of registrant’s name into English)

55 Jeollyeok-ro, Naju-si, Jeonnam-Gwangju, 58322, Korea

(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ☒   Form 40-F ☐


QUARTERLY BUSINESS REPORT

(For the period from January 1, 2026 to June 30, 2026)

THIS IS A SUMMARY IN ENGLISH OF THE QUARTERLY BUSINESS REPORT ORIGINALLY PREPARED IN KOREAN AND IS IN SUCH FORM AS REQUIRED BY THE FINANCIAL SERVICES COMMISSION OF KOREA.

IN THE TRANSLATION PROCESS, SOME PARTS OF THE REPORT WERE REFORMATTED, REARRANGED OR SUMMARIZED FOR THE CONVENIENCE OF READERS. NON-MATERIAL OR PREVIOUSLY DISCLOSED INFORMATION IS OMITTED OR ABRIDGED.

UNLESS EXPRESSLY STATED OTHERWISE, ALL INFORMATION CONTAINED HEREIN IS PRESENTED ON A CONSOLIDATED BASIS IN ACCORDANCE WITH INTERNATIONAL FINANCIAL REPORTING STANDARDS ADOPTED FOR USE IN KOREA, OR K-IFRS, WHICH DIFFER IN CERTAIN RESPECTS FROM GENERALLY ACCEPTED ACCOUNTING PRINCIPLES IN CERTAIN OTHER COUNTRIES, INCLUDING THE UNITED STATES. WE HAVE MADE NO ATTEMPT TO IDENTIFY OR QUANTIFY THE IMPACT OF THESE DIFFERENCES.


I.

Company Overview

1.

Name of the company: Korea Electric Power Corporation (“KEPCO”)

2.

Information of the company

(Address) 55 Jeollyeok-ro, Naju-si, Jeonnam-Gwangju, 58322, Korea

(Phone number) 82-61-345-4218

(Website) http://www.kepco.co.kr

3.

Major businesses

KEPCO, as the parent company, is engaged in the following activities:

•

development of electric power resources;

•

generation, transmission, transformation and distribution of electricity and other related activities;

•

research and development of technology related to the businesses mentioned above;

•

overseas business related to the businesses mentioned above;

•

investment or contributions related to the businesses mentioned above;

•

development and operation of certain real estate holdings; and

•

other businesses entrusted by the government.

Businesses operated by KEPCO’s major subsidiaries are as follows: nuclear power generation by Korea Hydro & Nuclear Power (KHNP), thermal power generation by Korea South-East Power (KOSEP), Korea Midland Power (KOMIPO), Korea Western Power (KOWEPO), Korea Southern Power (KOSPO) and Korea East-West Power (EWP), other businesses including engineering service by KEPCO Engineering & Construction (KEPCO E&C), maintenance and repair of power plants by KEPCO Plant Service & Engineering (KEPCO KPS), ICT service by KEPCO KDN, nuclear fuel processing by KEPCO Nuclear Fuel (KEPCO NF), other overseas businesses and investments related to the businesses mentioned above.

4.

Consolidated subsidiaries

(As of June 30, 2026)

 Listed 

Unlisted

Total

2

167 169

5.

Major changes in management

A.

On April 27, 2026, Mr. Kim, Jae-Koon was appointed as a standing director for a term of two years in replacement of Mr. Seo, Chul-Soo whose term of office expired.

B.

On May 8, 2026, Mr. Lee, Kyung-Sup, was appointed as a independent director for a term of two years in replacement of Mr. Kim, Sung-Eun whose term of office expired.

C.

On May 8, 2026, Mr. Moon, Jae-Do was appointed as a independent director for a term of two years in replacement of Mr. Lee, Sung-Ho whose term of office expired.

D.

On May 8, 2026, Ms. Hwang, Jeong-Hwa was appointed as a independent director for a term of two years in replacement of Mr. Han, Jin-Hyun whose term of office expired.

E.

On May 8, 2026, Mr. Kim, Jong-Wook was appointed as a independent director for a term of two years in replacement of Mr. Kim, Jong-Woon whose term of office expired.

F.

On May 8, 2026, Mr. Jung, Do-Jin was appointed as a independent director for a term of two years in replacement of Mr. Kim, Jun-Ki whose term of office expired.

G.

On May 8, 2026, Mr. Song, Jae-Do was appointed as a independent director for a term of two years in replacement of Mr. Cho, Seong-Jin whose term of office expired.

H.

On May 27, 2026, Mr. Kim, Tae-Ok was appointed as a Comptroller & Auditor General and member of the Audit Committee for a term of two years in replacement of Mr. Jun, Young-Sang whose term of office expired.

I.

On June 17, 2026, Mr. Baek, Woo-Ki was appointed as a standing director for a term of two years in replacement of Mr. Oh, Heung-Bok whose term of office expired.

J.

On June 17, 2026, Mr. Chun, Chan-Hyuk was appointed as a standing director for a term of two years.

K.

On June 17, 2026, Mr. Jung, Do-Jin was appointed as a independent member of the Audit Committee for a term of two years in replacement of Mr. Lee, Sung-Ho whose term of office expired.

L.

On June 17, 2026, Ms. Hwang, Jeong-Hwa was appointed as a independent member of the Audit Committee for a term of two years in replacement of Mr. Kim, Sung-Eun whose term of office expired.

6.

Changes in major shareholders

There is no change in major shareholders in the last 5 years.

7.

Information regarding KEPCO shares

A.

Issued share capital: 3.2 trillion Won (Authorized capital: 6 trillion Won)

B.

Total number of issued shares: 641,964,077

(Total number of authorized shares for issuance: 1,200,000,000)


C.

Dividends: Dividend payments for fiscal year 2025 was Won 1,542 per share and Won 989.9billion as a total.

II.

Business Overview

1.

Consolidated financial results by segment for a six-month period ended June 30, 2025 and 2026

(In billions of Won)

January to June 2025 January to June 2026
Sales Operating
profit
Sales Operating
profit

Electricity sales

45,462 2,857 44,996 2,123

Nuclear generation

8,206 2,396 8,152 3,089

Thermal generation

13,052 565 13,479 -246

Plant maintenance & engineering service

1,518 121 1,604 142

Others(1)

1,085 40 1,123 43

Subtotal

69,323 5,979 69,354 5,151

Adjustment for related-party transactions

-23,149 -90 -23,037 -239

Total

46,174 5,889 46,317 4,913
*

Figures are presented in billions of Korean won and may contain rounding differences.

Note:

(1)

Others relate to business areas including overseas businesses, etc.

2.

Changes in unit prices of major products for a six-month period ended June 30, 2025 and 2026

(In Won per kWh)

Business sector

Company January to
June 2025
January to
June 2026

Electricity sold

Residential KEPCO 155.22 156.69
Commercial 169.93 169.55
Educational 139.70 139.57
Industrial 179.23 179.01
Agricultural 87.92 90.42
Street lighting 160.76 159.42
Overnight usage 107.74 108.24

Electricity from nuclear generation

Nuclear Generation KHNP 82.87 96.47

Electricity from thermal generation

Thermal generation KOSEP 139.48 128.37
KOMIPO 161.40 142.99
KOWEPO 160.30 139.93
KOSPO 175.84 149.65
EWP 161.63 141.29
3.

Power purchase from generation subsidiaries for a six-month period ended June 30, 2026

Company

Volume
(GWh)
Expense
(In billions of Won)

KHNP

79,577 7,681

KOSEP

17,885 2,293

KOMIPO

17,449 2,491

KOWEPO

18,037 2,518

KOSPO

16,655 2,486

EWP

17,536 2,413

Others

107,483 14,742

Closing adjustment

—  3,128

Total

274,623 37,750
*

Figures are presented in GWh and billions of Korean won, figures may contain rounding differences.

4.

Intellectual property as of June 30, 2026

Patents Utility models Designs Trademarks Total

KEPCO

6,376 35 136 57 6,604

Generation subsidiaries

4,644 30 93 260 5,027

Total

11,020 65 229 317 11,631

III.

Financial Information

1.

Condensed consolidated financial results as of and for a six-month period ended June 30, 2025 and 2026

(In billions of Won)

Consolidated statements of

comprehensive income

Consolidated statements of

financial position

January to
June 2025
January to
June 2026
Change December 31,
2025
June 30,
2026
Change

Sales

46,174 46,317 143 Total assets 254,927 262,561 7,634

Operating profit (loss)

5,889 4,913 -976 Total liabilities 205,605 210,716 5,111

Net income (loss)

3,538 2,797 -741 Total equity 49,323 51,845 2,522
*

Figures are presented in billions of Korean won and may contain rounding differences.

2.

Condensed separate financial results as of and for a six-month period ended June 30, 2025 and 2026

(In billions of Won)

Separate statements of

comprehensive income

Separate statements of

financial position

January to
June 2025
January to
June 2026
Change December 31,
2025
June 30,
2026
Change

Sales

45,461 44,996 -465 Total assets 144,616 146,742 2,126

Operating profit (loss)

2,857 2,123 -734 Total liabilities 118,046 118,295 249

Net income (loss)

3,085 2,877 -208 Total equity 26,571 28,447 1,876
*

Figures are presented in billions of Korean won and may contain rounding differences.


IV. Board of Directors (KEPCO on a separate basis)

1. The board of directors is required to consist of not more than 15 directors including the president. Under our Articles of Incorporation, there may not be more than seven standing directors including the president, and more than eight independent(non-standing) directors. The number of independent (non-standing) directors must exceed the number of standing directors, including our president.

*

Subcommittees under the board of directors: The Audit Committee consists of one standing director and two independent (non-standing) directors. All such members of the audit committee are independent within the meaning of the Korea Exchange listing standards, the regulations promulgated under the Korean Commercial Act and the New York Stock Exchange listing standards. The ESG Committee consists of three independent (non-standing) directors and one standing director. The Power System Committee consists of three independent(non-standing) directors and one standing director.

2. Board meetings and agenda for a six-month period ended June 30, 2026

Number of meetings

Number of agendas

Classification

Resolutions

Reports

Confidential

12

38 32 5 1
*

The audit committee held 8 meetings with 27 agenda (of which, 15 were approved as proposed and 12 were accepted as reported).

3. Major activities of the Board of Directors for a six-month period ended June 30, 2026

Date

Agenda

Results Type
January 23, 2026 Approval of amendment to the Rules on Employment Approved as
proposed
Resolution
January 29, 2026 Approval of the establishment of and contribution to foreign subsidiary for the Dawadmi Wind Power Project in Saudi Arabia Deferred Resolution
January 30, 2026 Approval of the establishment of and contribution to foreign subsidiary for the Dawadmi Wind Power Project in Saudi Arabia Approved as
proposed
Resolution
February 26, 2026 Approval of the maximum aggregate amount of remuneration for directors in 2026 Approved as
proposed
Resolution
Approval of amendment to the Articles of Incorporation Approved as
proposed
Resolution

Approval to call for the annual general meeting of shareholders for the fiscal year 2025 Approved as
proposed
Resolution
Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders Approved as
proposed
Resolution
Approval of consolidated and separate financial statements for the fiscal year 2025 Approved as
proposed
Resolution
Approval of amendment to the construction of a new integrated office building for the Gangwon Regional Headquarters Approved as
proposed
Resolution
Approval of amendment to the Management Performance Agreement Approved as
proposed
Resolution
Report on internal control over financial reporting for the fiscal year 2025 Accepted as
reported
Report
Report on the evaluation of internal control over financial reporting for the fiscal year 2025 Accepted as
reported
Report
Report on audit results for 2025 Accepted as
reported
Report
March 12, 2026  Approval of amendment to the Terms and Conditions for Electricity Supply and Rules for Operation Approved as
proposed
Resolution
March 27, 2026 Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders Approved as
proposed
Resolution
Approval of amendments to Operational Regulations of ESG Committee Approved as
proposed
Resolution
Approval of contribution to Korea Institute of Energy Technology in 2026 Approved as
amended
Resolution
Report on Matters Related to the Ministry of Trade, Industry and Resources’ Recommendations for the UAE Nuclear Power Plant Project Accepted as
reported
Report
April 10, 2026 Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026 Approved as
proposed
Resolution

April 17, 2026   Approval of amendments to the Regulation for Employee Remuneration and Welfare Approved as
proposed
Resolution
Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders Approved as
proposed
Resolution
May 6, 2026 Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026 Approved as
proposed
Resolution
May 22, 2026 Approval of amendment to the Regulation of the Board of Directors Approved as
proposed
Resolution
Approval of forming Director Nomination Committee and evaluation standards for the candidates of a non-standing director Approved as
proposed
Resolution
Approval of amendment to the Terms and Condition for Electricity Supply Approved as
proposed
Resolution
Approval of amendment to the Regulations on the Use of Transmission and Distribution Facilities Approved as
proposed
Resolution

Confidential

(Article 9 (1) 7 of the Official Information Disclosure Act)

Confidential Confidential
Approval of nomination of the candidate of a member of Audit Committee Approved as
proposed
Resolution
Approval of establishment of and contribution to KEPCO Technology Holding Company to promote new energy technologies and new businesses Approved as
proposed
Resolution
Approval of amendment to the Master Investment Agreement for the New Energy Business Fund Approved as
proposed
Resolution
Approval of amendment to the Shareholders’ Agreement for Energy Infra Asset Management Co., Ltd. Accepted as
reported
Report
June 2, 2026 Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026 Approved as
proposed
Resolution
June 19, 2026   Approval of personnel increase Approved as
proposed
Resolution

         Approval of establishment and operation plan for the AI Committee Approved as
proposed
Resolution
Approval of appointment of a member of Power System Committee Approved as
proposed
Resolution
Approval of appointment of a member of ESG Committee Approved as
proposed
Resolution
Approval of the mid-to-long term financial management plan(2026-2030) Approved as
proposed
Resolution
Approval of forming Director Nomination Committee and evaluation standards for candidates Approved as
proposed
Resolution

4. Attendance Status of independent (non-standing) directors and Voting Results by Agenda Items for a six-month period ended June 30, 2026

Date

Agenda

Han,
Jin-Hyun

Kim,
Jong-
Woon

Kim,
Jun-Ki

Kim,
Sung-Eun

Lee,
Sung-Ho

Cho,
Seong-Jin

Kang,
Hoon

Lee,
Heung-
Ryul

Lee,
Kyung-Sup

Moon,
Jae-Do

Hwang,
Jeong-Hwa

Kim, Jong-
Wook

Jung,
Do-Jin

Song, Jae-Do
January 23, 2026

Approval of amendment to the Rules on Employment

For For For For For For For For Before Appointment Before Appointment Before Appointment Before Appointment Before Appointment Before
Appointment
January 29, 2026

Approval of the establishment of and contribution to foreign subsidiary for the Dawadmi Wind Power Project in Saudi Arabia

Deferred Absent Deferred Absent Deferred Deferred Deferred Deferred
January 30, 2026

Approval of the establishment of and contribution to foreign subsidiary for the Dawadmi Wind Power Project in Saudi Arabia

For For For Absent For For For For

February 26, 2026

Approval of the maximum aggregate amount of remuneration for directors in 2026

For For For For For For For For

Approval of amendment to the Articles of Incorporation

For For For For For For For For
Approval to call for the annual general meeting of shareholders for the fiscal year 2025 For For For For For For For For

Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders

For For For For For For For For

Approval of consolidated and separate financial statements for the fiscal year 2025

For For For For Absent For For For

Approval of amendment to the construction of a new integrated office building for the Gangwon Regional Headquarters

For For For For For For For For

Approval of amendment to the Management Performance Agreement

For For For For For For For For

Report on internal control over financial reporting for the fiscal year 2025

Agenda for Report

Report on the evaluation of internal control over financial reporting for the fiscal year 2025

Agenda for Report
Report on audit results for 2025 Agenda for Report

March 12, 2026

Approval of amendment to the Terms and Conditions for Electricity Supply and Rules for Operation

For For For For For For For For
March 27, 2026

Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders

For For For Absent Absent For For For

Approval of amendments to Operational Regulations of ESG Committee

For For For Absent Absent For For For

Approval of contribution to Korea Institute of Energy Technology in 2026

For For For Absent Absent For For For

Report on Matters Related to the Ministry of Trade, Industry and Resources’ Recommendations for the UAE Nuclear Power Plant Project

Agenda for Report
April 10, 2026

Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026

For For For For Absent For For For
April 17, 2026

Approval of amendments to the Regulation for Employee Remuneration and Welfare

For For For For Absent For For For

Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders

For For For For Absent For For For
May 6, 2026

Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026

For For For For Absent For For For

May 22, 2026

Approval of amendment to the Regulation of the Board of Directors

Retired Retired Retired Retired Retired Retired For For For For For For Absent For

Approval of forming Director Nomination Committee and evaluation standards for the candidates of a non-standing director

For For For For For For Absent For

Approval of amendment to the Terms and Condition for Electricity Supply

For Against For For Against For Absent Against

Approval of amendment to the Regulations on the Use of Transmission and Distribution Facilities

For For For For For For Absent For

Confidential (Article 9 (1) 7 of the Official Information Disclosure Act)

— — — — — — Absent —

Approval of nomination of the candidate of a member of Audit Committee

For For For For For For Absent For

Approval of establishment of and contribution to KEPCO Technology Holding Company to promote new energy technologies and new businesses

For For For For For For Absent For

Approval of amendment to the Master Investment Agreement for the New Energy Business Fund

For For For For For For Absent For

Approval of amendment to the Shareholders’ Agreement for Energy Infra Asset Management Co., Ltd.

For For For For For For Absent For

June 2, 2026

Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026

For For For For For For For For
June 19, 2026 Approval of personnel increase For For For For For For For For
Approval of establishment and operation plan for the AI Committee For For For For For For For For
Approval of appointment of a member of Power System Committee For For For For For For For For
Approval of appointment of a member of ESG Committee For For For For For For For For
Approval of the mid-to-long term financial management plan(2026-2030) For For For For For For For For
Approval of forming Director Nomination Committee and evaluation standards for candidates For For For For For For For For

Attendance Rate

100% 89% 100% 67% 56% 100% 100% 100% 100% 100% 100% 100% 67% 100%

5. Attendance Status of Standing directors for a six-month period ended June 30, 2026

Date

Agenda

Kim, Dong-
Cheol
Jun, Young-
Sang
Oh, Heung-Bok Jung, Chi-Gyo Ahn, Jung-Eun Seo, Chul-Soo Kim, Jae-Koon Kim, Tae-Ok Baek, Woo-Ki Chun,
Chan-Hyuk
January 23, 2026

Approval of amendment to the Rules on Employment

For For For For Absent For Before
Appointment
Before
Appointment
Before
Appointment
Before
Appointment
January 29, 2026

Approval of the establishment of and contribution to foreign subsidiary for the Dawadmi Wind Power Project in Saudi Arabia

Deferred Deferred Deferred Deferred Deferred Deferred
January 30, 2026

Approval of the establishment of and contribution to foreign subsidiary for the Dawadmi Wind Power Project in Saudi Arabia

For Against For For For For

February 26, 2026

Approval of the maximum aggregate amount of remuneration for directors in 2026

For For For For For For

Approval of amendment to the Articles of Incorporation

For For For For For For

Approval to call for the annual general meeting of shareholders for the fiscal year 2025

For For For For For For

Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders

For For For For For For

Approval of consolidated and separate financial statements for the fiscal year 2025

For For For For For For

Approval of amendment to the construction of a new integrated office building for the Gangwon Regional Headquarters

For For For For For For

Approval of amendment to the Management Performance Agreement

For For For For For For

Report on internal control over financial reporting for the fiscal year 2025

Agenda for Report

Report on the evaluation of internal control over financial reporting for the fiscal year 2025

Agenda for Report
Report on audit results for 2025 Agenda for Report
March 12, 2026

Approval of amendment to the Terms and Conditions for Electricity Supply and Rules for Operation

For For For For For For

March 27, 2026

Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders

For For For For For For

Approval of amendments to Operational Regulations of ESG Committee

For For For For For For

Approval of contribution to Korea Institute of Energy Technology in 2026

Abstent For For For For For

Report on Matters Related to the Ministry of Trade, Industry and Resources’ Recommendations for the UAE Nuclear Power Plant Project

Agenda for Report
April 10, 2026

Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026

For For For For For For
April 17, 2026

Approval of amendments to the Regulation for Employee Remuneration and Welfare

For For For For Absent For

Approval to close the shareholders’ registry for the extraordinary general meeting of shareholders

For For For For Absent For
May 6, 2026

Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026

For Against For For For For

May 22, 2026

Approval of amendment to the Regulation of the Board of Directors

For For For For For For

Approval of forming Director Nomination Committee and evaluation standards for the candidates of a non-standing director

For For For For For For

Approval of amendment to the Terms and Condition for Electricity Supply

For For For For For For

Approval of amendment to the Regulations on the Use of Transmission and Distribution Facilities

For For For For For For

Confidential (Article 9 (1) 7 of the Official Information Disclosure Act)

— — — — — —

Approval of nomination of the candidate of a member of Audit Committee

For For For For For For

Approval of establishment of and contribution to KEPCO Technology Holding Company to promote new energy technologies and new businesses

For For For For For For

Approval of amendment to the Master Investment Agreement for the New Energy Business Fund

For For For For For For

Approval of amendment to the Shareholders’ Agreement for Energy Infra Asset Management Co., Ltd.

Agenda for Report Agenda
for
Report

June 2, 2026

Approval to call for the extraordinary general meeting of shareholders for the fiscal year 2026

For Retired For For For For For
June 19, 2026

Approval of personnel increase

For Retired For For For For For For

Approval of establishment and operation plan for the AI Committee

For For For For For For For

Approval of appointment of a member of Power System Committee

For For For For For For For

Approval of appointment of a member of ESG Committee

For For For For For For For

Approval of the mid-to-long term financial management plan(2026-2030)

For For For For For For For

Approval of forming Director Nomination Committee and evaluation standards for candidates

For For For For For For For
Attendance Rate 100% 100% 100% 100% 83% 100% 100% 100% 100% 100%

6. Major activities of the Audit Committee for a six-month period ended June 30, 2026

Date

Agenda

Results

Type

January 22, 2026

Approval of appointment of independent auditors of subsidiaries

Approved as proposed Resolution

Approval of annual audit plans for 2026

Approved as proposed Resolution

Approval of amendments to guidelines of internal audit regulations

Approved as proposed Resolution

Approval of amendments to guidelines for demanding disciplinary measures

Approved as proposed Resolution

Amendments to the standards for voluntary reporting of drunk driving and audit processing

Approved as proposed Resolution

Report on independence of independent auditors

Accepted as reported Report

Report on audit education plans in 2026

Accepted as reported Report

Report on audit results for December of 2025

Accepted as reported Report
February 25, 2026

Approval of the consolidated and separate financial statements and business report for the fiscal year 2025

Approved as proposed Resolution

Report on internal control over financial reporting for the fiscal year 2025

Accepted as reported Report

Report on the evaluation on internal control over financial reporting for the fiscal year 2025

Accepted as reported Report

Report on the progress of the year-end financial statement audit by the independent auditor for the fiscal year 2025

Accepted as reported Report
Report on audit results for 2025 Accepted as reported Report
March 13, 2026

Approval of amendments to guideline for parctice for KEPCO executives and staff members

Approved as proposed Resolution

Approval of auditor’s report for the annual general meeting of shareholders

Approved as proposed Resolution

Report on audit results by the independent auditor for the fiscal year 2025

Accepted as reported Report

Report on audit results for January and February of 2026

Accepted as reported Report

April 17, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

Approved as proposed Resolution

Prior approval for non-audit service for subsidiaries by the independent auditor

Approved as proposed Resolution

Approval of appointment of independent auditors of subsidiaries

Approved as proposed Resolution

Report on the Form 20-F for the fiscal year 2025 to be filed with the U.S. Securities and Exchange

Accepted as reported Report

Report on audit progress by independent auditor on the Form 20-F for the fiscal year 2025 to be filed with the U.S. Securities and Exchange

Accepted as reported Report
May 8, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

Accepted as amended Resolution
May 22, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

Approved as proposed Resolution
June 5, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

Approved as proposed Resolution
June 19, 2026

Approval to appoint the chairman of the Audit Committee

Approved as proposed Resolution

Report on auditor’s review for the first quarter of fiscal year 2025

Accepted as reported Report
*

The audit department, organized under the supervision of the Audit Committee, conducts internal audit over the entire company and takes administrative measures as appropriate in accordance with relevant internal regulations.


7. Attendance Status of the Audit Committee for a six-month period ended June 30, 2026

Date

Agenda

Kim,
Sung-Eun
Lee,
Sung-Ho
Jun,
Young-Sang
Jung, Do-Jin Hwang,
Jeong-Hwa
Kim, Tae-Ok
January 22, 2026

Approval of appointment of independent auditors of subsidiaries

—  Attended Attended Before
Appointment
Before
Appointment
Before
Appointment

Approval of annual audit plans for 2026

Approval of amendments to guidelines of internal audit regulations

Approval of amendments to guidelines for demanding disciplinary measures

Amendments to the standards for voluntary reporting of drunk driving and audit processing

Report on independence of independent auditors

Report on audit education plans in 2026

Report on audit results for December of 2025

February 25, 2026

Approval of the consolidated and separate financial statements and business report for the fiscal year 2025

—  Attended Attended

Report on internal control over financial reporting for the fiscal year 2025

Report on the evaluation on internal control over financial reporting for the fiscal year 2025

Report on the progress of the year-end financial statement audit by the independent auditor for the fiscal year 2025

Report on audit results for 2025

March 13, 2026

Approval of amendments to guideline for parctice for KEPCO executives and staff members

—  Attended Attended

Approval of auditor’s report for the annual general meeting of shareholders

Report on audit results by the independent auditor for the fiscal year 2025

Report on audit results for January and February of 2026

April 17, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

—  Attended Attended

Prior approval for non-audit service for subsidiaries by the independent auditor

Approval of appointment of independent auditors of subsidiaries

Report on the Form 20-F for the fiscal year 2025 to be filed with the U.S. Securities and Exchange

Report on audit progress by independent auditor on the Form 20-F for the fiscal year 2025 to be filed with the U.S. Securities and Exchange

May 8, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

—  Attended Attended
May 22, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

—  Attended Attended
June 5, 2026

Approval of investigation result on the agenda for the extraordinary general meeting of shareholders

—  Attended Retired Attended
June 19, 2026

Approval to appoint the chairman of the Audit Committee

Retired Retired Attended Attended Attended

Report on auditor’s review for the first quarter of fiscal year 2025

Attendance Rate

0% 100% 100% 100% 100% 100%

V. Shareholder’s Meetings

1. Summary of shareholder’s meetings for a six-month period ended June 30, 2026

Type

Agenda

Results

Annual General Meeting held on March 25, 2026 Approval of the consolidated and separate financial statements for the fiscal year 2025 Approved as proposed
Approval of the maximum aggregate amount of remuneration for directors in 2026 Approved as proposed
Approval of amendment to the Articles of Incorporation Approved as proposed
Extraordinary General Meeting held on April 27, 2026 Election of a Standing Director Approved as proposed
Extraordinary General Meeting held on May 21, 2026 Election of Standing Director as a Member of the Audit Committee Approved as proposed

Extraordinary General Meeting held on June 17, 2026 Election of two Standing Directors Approved as proposed
Election of two Non-Standing Directors as a Member of the Audit Committee Approved as proposed

VI. Shareholders

1. List of shareholders as of June 30, 2026

Number of
shareholders
Shares owned Percentage of
total (%)

Government of the Republic of Korea

1 116,841,794 18.20

Korea Development Bank

1 211,235,264 32.90

Subtotal

2 328,077,058 51.10

National Pension Service

1 44,346,355 6.91
Public

(Non-Koreans)

Common Shares 2,091 114,767,796 17.88
American depositary shares (ADS) 1 16,454,393 2.56

Public (Koreans)

915,025 138,318,475 21.55

Total

917,120 641,964,077 100.00
•

Percentages are based on issued shares of common stock.

•

All of our shareholder have equal voting rights.

•

Citibank, N.A. is our depositary bank and each ADS represents one-half of one share of our common stock.


VII. Directors and employees as of and for a six-month period ended June 30, 2026

(KEPCO on a separate basis)

1. Directors

(In thousands of Won)

Type

Number of
directors
Total
remuneration
Average
remuneration

per person

Remarks

Standing director

6 504,256 84,042 Excluding members of the Audit Committee

Independent (Non-standing) director

6 90,000 15,000

Member of Audit Committee

Standing director 1 111,019 111,019 — 
Independent (Non-standing director) 2 30,000 15,000 — 

Total

15 735,276 49,018 — 

* Figures are presented in thousands of Korean won and may contain rounding differences.

2. Employees

(In thousands of Won)

Type

Number of employees Average
continuous
service year
Total
salaries
Average
salaries

per person
Regular Non-regular Total

Male

17,446 93 17,539 14.9 816,597,043 47,070

Female

5,318 92 5,410 14.4 220,628,179 41,223

Total

22,764 185 22,949 14.8 1,037,225,222 45,691

* Figures are presented in thousands of Korean won and may contain rounding differences.

VIII. Other Information Necessary for the Protection of Investors

1. Pending legal proceedings as of June 30, 2026

(In billions of Won)

Type

Number of
lawsuits
Amount
claimed

Lawsuits where KEPCO and its subsidiaries are engaged as the defendants

716 842

Lawsuits where KEPCO and its subsidiaries are engaged as the plaintiffs

267 522

2. Sanctions as of June 30, 2026(Korea Hydro & Nuclear Power CO, Ltd.)

Sanctions by Law Enforcement and Judicial Authorities

Prosecution Date

Subject

Sanctions

Relevant

laws (charges)

Proceedings

Position

Tenure
June 30, 2021 CEO(Former) 4yrs Prosecution with detention The Act on the Aggravated Punishment, etc. of specific economic crimes(Occupational breach of trust), The Criminal Act In the progress in the district court
April 9, 2024 The head of a power plant(Former) 29yrs Prosecution with detention Occupational embezzlement, The Criminal Act In the progress in the high court
January 3, 2025 KHNP Prosecution with detention Nuclear Safety Act(Vicarious Liability Provision) In the progress in the district court
September 18, 2025 KHNP

Administrative Fine

(4 million Won)

The Act on the Protection and Investigation of Buried Cultural Heritage (Vicarious Liability Provision) Fine Payment

Sanctions by Administrative Authorities

Date

Subject

Sanctions

Grounds and Applicable Laws

Proceedings

January 15, 2025

KHNP

HANBIT Nuclear Power Site

Administrative Fine

(10 million Won)

Act of Physical Protection and Radiological Emergency Preparedness for Nuclear Facilities, etc. Article 14 (Book and Records) Fine Payment
January 15, 2025

KHNP

HANUL Nuclear Power Site

Administrative Fine

(8 million Won)

Act of Physical Protection and Radiological Emergency Preparedness for Nuclear Facilities, etc. Article 14 (Book and Records) Fine Payment
March 6, 2025 KHNP Corrective Action Act on the Fairness of Subcontract Transactions Article 3-4 Paragraph(1) Prohibition of unfair contractual terms Implementation of Corrective Actions to prevent recurrence
June 16, 2025

KHNP

HANUL Nuclear Power Site

Administrative Fine

(0.25 million Won)

Groundwater Act Article 9

Failure to conduct a geotechnical investigation

Fine Payment
June 26, 2025 KHNP

Administrative Fine

(144 million Won)

Nuclear Safety Act

Article 70 and 119

The Enforcement Decree of Nuclear Safety ACT Article 107 and 178

Fine Payment

July 10, 2025

KHNP

HANUL Nuclear Power Site

Administrative Fine

(8 million Won)

Act of Physical Protection and Radiological Emergency Preparedness for Nuclear Facilities, etc. Article 14 (Book and Records) Fine Payment
December 16, 2025

KHNP

HANUL Nuclear Power Site

Administrative Fine

(12 million Won)

Nuclear Safety Act

Article 25

Fine Payment
January 2, 2026 KHNP

Penalty Surcharge

(10.5 billion Won)

Nuclear Safety Act

Article 20, 21 and 26

Surcharge Payment
May 14, 2026 KHNP

Penalty Surcharge

(5 million Won)

Electric Utility Act Article 61 Surcharge Payment
May 15, 2026

KHNP

HANBIT

Nuclear Power Site

Administrative Fine

(12 million Won)

Nuclear Safety Act

Article 15-2

Fine Payment
May 15, 2026

KHNP

HANUL Nuclear Power Site

Administrative Fine

(6 million Won)

Nuclear Safety Act

Article 15-2

Fine Payment

3. Sanctions as of September 30, 2025(KEPCO KDN)

Date

Sanction Authorities

Resolution Number

Case Name

Proceedings

Febrary 20, 2025 Korea Fair Trade Commission Resolution2025-029 Case concerning unlawful collussion between KEPCO KDN and Exem CO,. Ltd. in the procurement bid for additional storage materials for unstructured data at KEPCO Corrective Actions and fine(39 million Won)

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

By: /s/ Joo, Hwa-sik
Name: Joo, Hwa-sik
Title: Vice President

Date: Sep 15, 2026


KOREA ELECTRIC POWER CORPORATION

AND ITS SUBSIDIARIES

Condensed consolidated interim financial statements

June 30, 2026 and 2025

(Unaudited)

with the independent auditors’ review report



Independent Auditors’ Review Report

(English translation of a report originally issued in Korean)

To the Board of Directors and Shareholders of

Korea Electric Power Corporation

Reviewed Financial Statements

We have reviewed the accompanying condensed consolidated interim financial statements of Korea Electric Power Corporation and its subsidiaries (the “Group”), which comprise the condensed consolidated interim statement of financial position as of June 30, 2026, the condensed consolidated interim statements of comprehensive income for the three-month and six-month periods ended June 30, 2026 and 2025, the condensed consolidated interim statements of changes in equity and cash flows for the six-month periods ended June 30, 2026 and 2025 and notes, including material accounting policy information and other explanatory information.

Management’s Responsibility

Management is responsible for the preparation and fair presentation of these condensed consolidated interim financial statements in accordance with Korean International Financial Reporting Standards (“K-IFRS”) No. 1034, ‘Interim Financial Reporting’ and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.

Auditors’ Review Responsibility

Our responsibility is to issue a report on these condensed consolidated interim financial statements based on our reviews.

We conducted our reviews in accordance with the Review Standards for Quarterly and Semiannual Financial Statements established by the Securities and Futures Commission of the Republic of Korea. A review of interim financial statements consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with Korean Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Conclusion

Based on our reviews, nothing has come to our attention that causes us to believe that the accompanying condensed consolidated interim financial statements referred to above do not present fairly, in all material respects, in accordance with K-IFRS No. 1034, ‘Interim Financial Reporting’.

Other Matters

The procedures and practices utilized in the Republic of Korea to review such condensed consolidated interim financial statements may differ from those generally accepted and applied in other countries.

The consolidated statement of financial position as of December 31, 2025, and the related consolidated statements of comprehensive

income, changes in equity and cash flows for the year then ended, which are not accompanying this report, were audited by us in

accordance with Korean Standards on Auditing and our report thereon, dated March 10, 2026, expressed an unqualified opinion. The

accompanying consolidated statement of financial position as of December 31, 2025, presented for comparative purposes, is not

different from that audited by us from which it was derived in all material respects.

LOGO

Seoul, Korea

August 14, 2026

This report is effective as of August 14, 2026, the review report date. Certain subsequent events or circumstances, which may occur between the review report date and the time of reading this report, could have a material impact on the accompanying condensed consolidated interim financial statements and notes thereto. Accordingly, the readers of the review report should understand that the above review report has not been updated to reflect the impact of such subsequent events or circumstances, if any.

1


KOREA ELECTRIC POWER CORPORATION

AND ITS SUBSIDIARIES

Condensed consolidated interim financial statements

For each of the six-month periods ended June 30, 2026 and 2025

“The accompanying condensed consolidated interim financial statements, including all footnotes and disclosures,

have been prepared by, and are the responsibility of, the Group.”

Dong-Cheol Kim

Chief Executive Officer

Korea Electric Power Corporation

2


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of financial position

As of June 30, 2026 and December 31, 2025 (Unaudited)

In millions of won Note June 30, 2026 December 31, 2025

Assets

Current assets

Cash and cash equivalents

5,6,7,44 W 2,622,064 2,240,811

Current financial assets, net

5,6,9,11,12,13,44,45,46 4,567,211 4,250,164

Trade and other receivables, net

5,8,20,24,44,45,46 12,144,289 12,618,480

Inventories, net

14 11,139,739 10,152,724

Current income tax assets

77,340 91,579

Current non-financial assets

15 1,789,485 1,361,630

Total current assets

32,340,128 30,715,388

Non-current assets

Non-current financial assets, net

5,6,9,10,11,12,13,44,46 4,976,872 4,565,561

Non-current trade and other receivables, net

5,8,20,44,45,46 3,209,795 3,124,185

Property, plant and equipment, net

18,24,27,48 192,398,264 187,751,538

Investment properties, net

19,27 185,596 238,772

Goodwill, net

16 99,393 99,303

Intangible assets other than goodwill, net

21,27 1,041,364 1,001,295

Investments in associates

4,17 7,192,084 6,851,456

Investments in joint ventures

4,17 7,018,364 6,512,332

Defined benefit assets, net

25 179,051 104,344

Deferred tax assets

12,895,235 12,950,032

Non-current non-financial assets

15 1,025,218 1,013,251

Total non-current assets

230,221,236 224,212,069

Total assets

4 W 262,561,364 254,927,457

(Continued)

3


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of financial position, Continued

As of June 30, 2026 and December 31, 2025 (Unaudited)

In millions of won Note June 30, 2026 December 31, 2025

Liabilities

Current liabilities

Trade and other payables

5,22,24,44,46 W 10,066,126 8,621,671

Current financial liabilities

5,12,23,44,46 50,707,759 45,939,089

Current income tax liabilities

1,193,655 1,571,143

Current non-financial liabilities

20,28,29 6,745,611 6,805,171

Current provisions

26,44 4,276,428 4,170,243

Total current liabilities

72,989,579 67,107,317

Non-current liabilities

Non-current trade and other payables

5,22,24,44,46 4,057,453 4,028,808

Non-current financial liabilities

5,12,23,44,46 82,735,285 83,995,702

Non-current non-financial liabilities

28,29 14,241,426 13,726,159

Employee benefits liabilities, net

25,44 1,026,156 1,381,852

Deferred tax liabilities

6,516,435 6,500,975

Non-current provisions

26,44 29,149,823 28,863,700

Total non-current liabilities

137,726,578 138,497,196

Total liabilities

4 W 210,716,157 205,604,513

Equity

Contributed capital

1,30,44

Share capital

W 3,209,820 3,209,820

Share premium

843,758 843,758
4,053,578 4,053,578

Retained earnings

31

Legal reserves

1,604,910 1,604,910

Voluntary reserves

6,807,034 567,469

Unappropriated retained earnings

22,000,850 26,328,205
30,412,794 28,500,584

Other components of equity

33

Other capital surplus

1,568,699 1,566,635

Accumulated other comprehensive income

1,932,167 1,340,560

Other equity

12,708,585 12,708,585
16,209,451 15,615,780

Equity attributable to owners of the controlling company

50,675,823 48,169,942

Non-controlling interests

16,32 1,169,384 1,153,002

Total equity

W 51,845,207 49,322,944

Total liabilities and equity

W 262,561,364 254,927,457

The accompanying notes are an integral part of the condensed consolidated interim financial statements.

4


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of comprehensive income

For each of the three-month and six-month periods ended June 30, 2026 and 2025 (Unaudited)

In millions of Won, except per share information June 30, 2026 June 30, 2025
Note Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Sales

4,34,44,46

Sale of goods

2 W 21,268,065 45,042,990 21,392,996 45,202,445

Sales of services

180,711 353,174 156,882 303,574

Sales of construction services

20 244,740 470,018 181,271 237,468

Revenue related to transfer of assets from customers

28 225,336 451,157 218,989 430,635
21,918,852 46,317,339 21,950,138 46,174,122

Cost of sales

14,25,42,46

Cost of sale of goods

(19,597,437 ) (39,080,586 ) (18,588,673 ) (37,783,716 )

Cost of sales of services

(251,649 ) (375,462 ) (144,919 ) (286,024 )

Cost of sales of construction services

(157,407 ) (448,716 ) (285,950 ) (706,746 )
(20,006,493 ) (39,904,764 ) (19,019,542 ) (38,776,486 )

Gross profit

1,912,359 6,412,575 2,930,596 7,397,636

Selling and administrative expenses

25,35,42,46 (783,807 ) (1,499,854 ) (794,724 ) (1,508,157 )

Operating profit

4 1,128,552 4,912,721 2,135,872 5,889,479

Other income

36 60,403 217,038 93,373 186,180

Other expenses

36 (90,394 ) (168,434 ) (75,220 ) (95,098 )

Other gains, net

37 56,731 68,435 20,611 119,183

Finance income

5,12,38 513,166 1,810,245 1,785,966 2,150,192

Finance expenses

5,12,39 (1,442,732 ) (3,521,217 ) (2,463,698 ) (3,646,278 )

Profit (loss) related to associates, joint ventures and subsidiaries

4,16,17

Share of profit of associates and joint ventures

258,201 637,767 166,283 484,739

Gain on disposal of investments in associates and joint ventures

3,368 3,391 3,838 3,879

Share of loss of associates and joint ventures

(50,874 ) (127,416 ) (1,846 ) (195,223 )

Loss on impairment of investments in associates and joint ventures

(10,304 ) (11,381 ) —  — 
W 200,391 502,361 168,275 293,395

(Continued)

5


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of comprehensive income, Continued

For each of the three-month and six-month periods ended June 30, 2026 and 2025 (Unaudited)

In millions of Won, except per share information June 30, 2026 June 30, 2025
Note Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Profit before income tax

W 426,117 3,821,149 1,665,179 4,897,053

Income tax expense

40 (148,580) (1,024,605 ) (488,822 ) (1,358,988 )

Profit for the period

277,537 2,796,544 1,176,357 3,538,065

Other comprehensive income (loss), net of tax

5,12,25,31,33

Items that will not be reclassified subsequently to profit or loss:

13,342 156,404 84,494 (55,645 )

Remeasurements of defined benefit plans

25,31 50,433 121,423 2,037 (98,100 )

Share of other comprehensive income of associates and joint ventures

31 14,890 25,390 258 10

Net change in fair value of financial assets at fair value through other comprehensive income

33 (51,981) 9,591 82,199 42,445

Items that may be reclassified subsequently to profit or loss:

149,766 627,783 (703,252 ) (720,651 )

Net change in the unrealized fair value of derivatives using cash flow hedge accounting

5,12,33 5,180 14,230 (994 ) 9,469

Foreign currency translation of foreign operations

33 (4,546) 79,504 (174,393 ) (149,836 )

Share of other comprehensive income (loss) of associates and joint ventures

33 149,132 534,049 (527,865 ) (580,284 )

Other comprehensive income (loss) for the period

163,108 784,187 (618,758 ) (776,296 )

Total comprehensive income for the period

W 440,645 3,580,731 557,599 2,761,769

Profit attributable to:

Owners of the controlling company

43 W 267,306 2,760,052 1,136,712 3,464,958

Non-controlling interests

10,231 36,492 39,645 73,107
W 277,537 2,796,544 1,176,357 3,538,065

Total comprehensive income (loss)

attributable to:

Owners of the controlling company

W 413,635 3,493,726 560,245 2,738,012

Non-controlling interests

27,010 87,005 (2,646 ) 23,757
W 440,645 3,580,731 557,599 2,761,769

Earnings per share (in won)

43

Basic earnings per share

W 416 4,299 1,771 5,397

Diluted earnings per share

416 4,299 1,771 5,397

The accompanying notes are an integral part of the condensed consolidated interim financial statements.

6


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of changes in equity

For the six-month periods ended June 30, 2026 and 2025 (Unaudited)

In millions of won Equity attributable to owners of the controlling company Non-
controlling
interests
Contributed
capital
Retained
earnings
Other
components
of equity
Subtotal Total
equity

Balance as of January 1, 2025

W 4,053,578 20,128,247 15,733,411 39,915,236 1,447,597 41,362,833

Total comprehensive income (loss) for the period

Profit for the period

—  3,464,958 —  3,464,958 73,107 3,538,065

Items that will not be reclassified subsequently to profit or loss:

Remeasurement of defined benefit plans, net of tax

—  (88,189 ) —  (88,189 ) (9,911 ) (98,100 )

Share of other comprehensive income of associates and joint ventures, net of tax

—  10 —  10 —  10

Net change in fair value of financial assets at fair value through other comprehensive income, net of tax

—  —  42,447 42,447 (2 ) 42,445

Items that may be reclassified subsequently to profit or loss:

Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax

—  —  10,295 10,295 (826 ) 9,469

Foreign currency translation of foreign operations, net of tax

—  —  (111,225 ) (111,225 ) (38,611 ) (149,836 )

Share of other comprehensive income of associates and joint ventures, net of tax

—  —  (580,284 ) (580,284 ) —  (580,284 )

Transactions with owners of the Group, recognized directly in equity

Dividends paid

—  (136,738 ) —  (136,738 ) (74,714 ) (211,452 )

Additional paid-in capital and others

—  —  127 127 (6,826 ) (6,699 )

Equity transaction within the consolidated entity

—  —  5,187 5,187 (12,171 ) (6,984 )

Dividends paid for hybrid bonds

—  —  —  —  (2,128 ) (2,128 )

Repayment of hybrid bond

—  —  —  —  (230,000 ) (230,000 )

Balance as of June 30, 2025

W 4,053,578 23,368,288 15,099,958 42,521,824 1,145,515 43,667,339

(Continued)

7


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of changes in equity, Continued

For the six-month periods ended June 30, 2026 and 2025 (Unaudited)

In millions of won Equity attributable to owners of the controlling company Non-
controlling
interests
Contributed
capital
Retained
earnings
Other
components
of equity
Subtotal Total
equity

Balance as of January 1, 2026

W 4,053,578 28,500,584 15,615,780 48,169,942 1,153,002 49,322,944

Total comprehensive income (loss) for the period

Profit for the period

—  2,760,052 —  2,760,052 36,492 2,796,544

Items that will not be reclassified subsequently to profit or loss:

Remeasurement of defined benefit plans, net of tax

—  116,677 —  116,677 4,746 121,423

Share of other comprehensive income of associates and joint ventures, net of tax

—  25,390 —  25,390 —  25,390

Net change in fair value of financial assets at fair value through other comprehensive income, net of tax

—  —  9,590 9,590 1 9,591

Items that may be reclassified subsequently to profit or loss:

Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax

—  —  13,848 13,848 382 14,230

Foreign currency translation of foreign operations, net of tax

—  —  34,120 34,120 45,384 79,504

Share of other comprehensive income of associates and joint ventures, net of tax

—  —  534,049 534,049 —  534,049

Transactions with owners of the Group, recognized directly in equity

Dividends paid

—  (989,909 ) —  (989,909 ) (62,946 ) (1,052,855 )

Additional paid-in capital and others

—  —  (64 ) (64 ) 55 (9 )

Equity transaction within the consolidated entity

—  —  2,128 2,128 (7,732 ) (5,604 )

Balance as of June 30, 2026

W 4,053,578 30,412,794 16,209,451 50,675,823 1,169,384 51,845,207

The accompanying notes are an integral part of the condensed consolidated interim financial statements.

8


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of cash flows

For the six-month periods ended June 30, 2026 and 2025 (Unaudited)

In millions of won June 30, 2026 June 30, 2025

Cash flows from operating activities

Profit for the period

W 2,796,544 3,538,065

Adjustments to reconcile profit for the period to net cash provided by operating activities:

Income tax expense

1,024,605 1,358,988

Depreciation

6,763,349 6,911,418

Amortization

74,319 82,466

Retirement benefit expenses

218,861 227,929

Bad debt expense

92,107 25,803

Interest expense

2,079,121 2,211,256

Loss on disposal of financial assets

1,211 2,683

Loss on disposal of property, plant and equipment

39,202 50,140

Loss on abandonment of property, plant and equipment

64,776 70,001

Loss on impairment of property, plant and equipment

825 — 

Loss on impairment of intangible assets

1,115 30

Loss on disposal of intangible assets

1 13

Increase in provisions, net

720,507 1,009,317

Loss (gain) on foreign currency translation, net

1,134,458 (1,263,030 )

Gain on valuation of financial assets at fair value through profit or loss

(40,525 ) (34,789 )

Loss on valuation of financial assets at fair value through profit or loss

28,890 387

Loss (gain) on valuation and transaction of derivative instruments, net

(1,338,143 ) 1,115,023

Share of profit of investments in associates and joint ventures, net

(510,351 ) (289,516 )

Gain on disposal of financial assets

(28,109 ) (19,496 )

Reversal of impairment loss on intangible assets

(47 ) (40 )

Gain on disposal of property, plant and equipment

(3,627 ) (8,075 )

Gain on disposal of intangible assets

—  (16 )

Gain on disposal of associates and joint ventures

(3,391 ) (3,879 )

Loss on impairment of investments in associates and joint ventures

11,381 — 

Interest income

(194,405 ) (215,046 )

Dividends income

(25,962 ) (23,321 )

Others, net

73,773 (311,770 )
10,183,941 10,896,476

Changes in:

Trade receivables

878,518 696,551

Non-trade receivables

160,521 392,070

Accrued income

(96,923 ) (52,232 )

Other receivables

69,794 66,819

Other current assets

(662,476 ) (352,446 )

Inventories

(1,965,344 ) (527,713 )

Other non-current assets

64,412 (128,890 )

Trade payables

851,156 (760,931 )

Non-trade payables

321,072 323,957

Accrued expenses

(186,718 ) 121,391

Other current liabilities

36,512 150,807

Other non-current liabilities

475,233 672,458

Investments in associates and joint ventures (dividends received)

501,724 142,745

Provisions

(942,197 ) (644,872 )

Payments of employee benefit obligations

(478,183 ) (145,537 )

Plan assets

(22,892 ) (1,240 )
W (995,791 ) (47,063 )

(Continued)

9


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Condensed consolidated interim statements of cash flows, Continued

For the six-month periods ended June 30, 2026 and 2025 (Unaudited)

In millions of won June 30, 2026 June 30, 2025

Cash generated from operating activities

W 11,984,694 14,387,478

Dividends received

25,962 23,321

Interest paid

(2,044,732 ) (2,247,651 )

Interest received

161,094 183,180

Income taxes paid

(1,581,451 ) (999,742 )

Net cash flows provided by operating activities

8,545,567 11,346,586

Cash flows from investing activities

Proceeds from disposals of investments in associates and joint ventures

10,468 12,097

Acquisition of investments in associates and joint ventures

(159,251 ) (1,966,262 )

Proceeds from disposals of property, plant and equipment

133,270 113,294

Acquisition of property, plant and equipment

(9,571,309 ) (8,920,625 )

Proceeds from disposals of intangible assets

171 1,430

Acquisition of intangible assets

(69,878 ) (42,668 )

Proceeds from disposals of financial assets

2,141,327 8,478,049

Acquisition of financial assets

(1,958,724 ) (9,929,595 )

Increase in loans

(101,574 ) (90,047 )

Collection of loans

39,476 177,106

Increase in deposits

(82,169 ) (85,179 )

Decrease in deposits

80,638 71,894

Proceeds from disposals of assets held-for-sale

—  14,363

Receipt of government grants

8,905 5,931

Other cash outflow from investing activities, net

(211,687 ) (64,513 )

Net cash flows used in investing activities

(9,740,337 ) (12,224,725 )

Cash flows from financing activities

Proceeds of short-term borrowings, net

1,319,064 3,159,911

Proceeds from long-term borrowings

1,443,235 1,122,664

Proceeds from debt securities

13,175,160 15,434,199

Repayment of long-term borrowings

(221,336 ) (235,025 )

Repayment of debt securities

(13,438,165 ) (18,749,783 )

Payment of lease liabilities

(287,247 ) (329,894 )

Settlement of derivative instruments, net

583,316 539,303

Change in non-controlling interests

(5,594 ) (41,363 )

Repayment of hybrid bond

—  (230,000 )

Dividends paid for hybrid bond

—  (2,128 )

Dividends paid

(1,052,853 ) (211,452 )

Other cash outflow from financing activities, net

(5,200 ) (1,267 )

Net cash flows provided by financing activities

1,510,380 455,165

Net increase (decrease) in cash and cash equivalents before effect of exchange rate fluctuations

315,610 (422,974 )

Effect of exchange rate fluctuations on cash held

65,643 (34,256 )

Net increase (decrease) in cash and cash equivalents

381,253 (457,230 )

Cash and cash equivalents as of January 1, 2026 and 2025

2,240,811 2,382,979

Cash and cash equivalents as of June 30, 2026 and 2025

W 2,622,064 1,925,749

The accompanying notes are an integral part of the condensed consolidated interim financial statements.

10


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements

June 30, 2026 and 2025 (unaudited)

1.

Reporting Entity (Description of the controlling company)

Korea Electric Power Corporation (“KEPCO”), the controlling company as defined in International Financial Reporting Standards as adopted by the Republic of Korea (“KIFRS”) 1110 Consolidated Financial Statements, was incorporated on January 1, 1982 in accordance with the Korea Electric Power Corporation Act (the “KEPCO Act”) to engage in the generation, transmission and distribution of electricity and development of electric power resources in the Republic of Korea. With the enforcement of the Act on the Management of Public Institutions on April 1, 2007, KEPCO was designated as a public institution (market-oriented public corporation). KEPCO’s stock was listed on the Korea Stock Exchange on August 10, 1989 and KEPCO listed its Depository Receipts (DR) on the New York Stock Exchange on October 27, 1994. KEPCO’s head office is located in Naju-si, Jeonnam-Gwangju Special Metropolitan City.

As of June 30, 2026, KEPCO’s share capital amounts to W3,209,820 million and KEPCO’s shareholders are as follows:

Number of shares
(in shares)
Percentage of
ownership

The Government of the Republic of Korea

116,841,794 18.20 %

Korea Development Bank

211,235,264 32.90 %

Other (*1)

313,887,019 48.90 %
641,964,077 100.00 %
(*1)

As of the most recent closing date of the shareholders’ register (May 4, 2026), the number of shares held by foreign shareholders is 135,481,515 shares (21.10%).

In accordance with the Restructuring Plan enacted on January 21, 1999 by the Ministry of Trade, Industry and Energy, KEPCO spun off its power generation divisions on April 2, 2001, resulting in the establishment of six power generation subsidiaries.

2.

Basis of Preparation

(1)

Statement of compliance

These condensed consolidated financial statements have been prepared in accordance with KIFRS 1034 Interim Financial Reporting, as prescribed in the Act on External Audit of Stock Companies in the Republic of Korea. The accompanying consolidated financial statements have been translated into English from Korean language financial statements. In the event of any differences in interpreting the financial statements or the independent auditor’s report thereon, the Korean version, which is used for regulatory reporting purposes, shall prevail.

(2)

Basis of measurement

These condensed consolidated financial statements have been prepared on the historical cost basis, except for the following material items in the consolidated statements of financial position:

•

financial instruments at fair value through profit or loss;

•

financial instruments at fair value through other comprehensive income;

•

derivative financial instruments are measured at fair value; and

•

liabilities for defined benefit plans are recognized at the net of the total present value of defined benefit obligations less the fair value of plan assets.

(3)

Functional and presentation currency

These condensed consolidated financial statements are presented in Korean won (presented as “won”, “W” or “KRW”), which is also the functional currency of KEPCO and most of the significant operating subsidiaries.

11


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements

June 30, 2026 and 2025 (unaudited)

2.

Basis of Preparation, Continued

(4)

Use of estimates and judgments

The preparation of the condensed consolidated financial statements in conformity with KIFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.

Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.

Meanwhile, the Group considers climate-related risks resulting from climate change and the establishment of a global greenhouse gas reduction implementation system in its estimates and assumptions. Climate-related risks increase the uncertainty of the estimates and assumptions considered in various items of the financial statements, and the Group carefully monitors climate-related changes and developments, such as new climate-related legislation, even if it does not have a material impact on current measurements.

The following are the key assumptions and other key sources of estimation uncertainty at the end of the reporting period, which have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year.

(i)

Useful lives of property, plant and equipment, intangible assets other than goodwill and estimations on provision for decommissioning costs.

The Group reviews the estimated useful lives of property, plant and equipment, intangible assets other than goodwill at the end of each annual reporting period. Management’s assumptions could affect the determination of estimated economic useful lives.

The Group records the present value of estimated decommissioning costs as a liability in the period in which the Group incurs a legal obligation associated with the retirement of long-lived assets that result from acquisition, construction, development and/or normal use of the assets. The Group is required to record a liability for the dismantling (demolition) of nuclear power plants and disposal of spent fuel and low and intermediate radioactive wastes. The measurement of such liability is subject to change based on change in estimated cash flow, inflation rate, discount rate, and expected timing of decommissioning.

(ii)

Deferred tax

The Group recognizes deferred tax assets and liabilities based on the differences between the financial statement carrying amounts and the tax bases of assets and liabilities of each consolidated taxpaying entity. However, the amount of deferred tax assets may be different if the Group determines the estimated future taxable income is not sufficient to realize the deferred tax assets recognized.

(iii)

Valuations of financial instruments at fair values

The Group’s accounting policies and disclosures require the measurement of fair values, for both financial and non-financial assets and liabilities. The Group has established control framework with respect to the measurement of fair values. The valuation team regularly reviews significant unobservable inputs and valuation adjustments.

If third party information, such as broker quotes or pricing services, is used to measure fair values, then the valuation team assesses the evidence obtained from the third parties to support the conclusion that such valuations meet the requirements of KIFRS including the level in the fair value hierarchy in which such valuation techniques should be classified.

When measuring the fair value of an asset or a liability, the Group uses market observable data as far as possible. Fair values are categorized into different levels in a fair value hierarchy based on the inputs used in the valuation techniques as follows.

12


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements

June 30, 2026 and 2025 (unaudited)

2.

Basis of Preparation, Continued

(4)

Use of estimates and judgments, Continued

(iii)

Valuations of financial instruments at fair values, Continued

If the inputs used to measure the fair value of an asset or a liability might be categorized in different levels of the fair value hierarchy, then the fair value measurement is categorized in its entirety in the same level of the fair value hierarchy as the lowest level input that is significant to the entire measurement. The Group recognizes transfers between levels of the fair value hierarchy at the end of the reporting period during which the change has occurred.

(iv)

Defined employee benefit liabilities

The Group offers its employees defined benefit plans. The cost of providing benefits is determined by using the Projected Unit Credit Method, with actuarial valuations being carried out at the end of each reporting period. For actuarial valuations, certain inputs such as discount rates and future salary increases are estimated. Defined benefit plans contain significant uncertainties in estimations due to their long-term nature (refer to Note 25).

(v)

Unbilled revenue

Electricity delivered but neither metered nor billed is estimated at the reporting date based on the estimated volume of electricity delivered and the estimated selling price, which can vary significantly as a result of customer usage patterns, customer mix, meter reading schedules, weather, etc. Unbilled revenue recognized at the end of the six-month periods ended June 30, 2026 and 2025 is W2,046,875 million and W2,063,977 million, respectively.

(vi)

Construction contracts

The Group recognizes revenue over time using the cost-based input method which represents a faithful depiction of the Group’s progress towards complete satisfaction of providing the power plant construction, which has been identified as a single performance obligation. In applying the cost-based input method, it is necessary to use estimates and assumptions related to the Group’s efforts or inputs expected to be incurred. Costs incurred towards contract completion include costs associated with direct materials, labor, and other indirect costs related to contract performance. Judgment is required in estimating the costs expected to incur in completing the construction projects which involves estimating future materials, labor, contingencies and other related costs. Revenue is estimated based on the total contractual amount; however, it can also be affected by uncertainties resulting from unexpected future events.

(vii)

Impairment of non-financial assets other than goodwill

The Group reviews, at the end of each reporting period, whether there is any indication that property, plant and equipment or intangible assets other than goodwill may be impaired. When such indication exists, the Group estimates the recoverable amount of the asset (or a CGU) to determine the amount of impairment loss that should be recognized, if any. The Group measures value in use of a CGU based on discounted cash flows. In determining value in use, key assumptions applied in discounted cash flow model include the discount rate, forecasted future sales volumes, unit sales prices, and cost of purchased power.

13


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements

June 30, 2026 and 2025 (unaudited)

2.

Basis of Preparation, Continued

(5)

Changes in accounting policies

The Group has applied the following new accounting standards and amendments for its annual reporting period commencing January 1, 2026. The amendments have no significant impact on the Group’s consolidated financial statements. The Group has not early adopted any other standards, interpretations or amendments that have been issued but are not yet effective.

1) Amendments to KIFRS 1109, “Financial Instruments” and KIFRS 1107, “Financial Instruments: Disclosures” - Classification and Measurement of Financial Instruments

The amendments to KIFRS 1109 and KIFRS 1107 regarding the classification and measurement of financial instruments include the following:

- Clarification of the requirements for recognition and derecognition of financial assets and financial liabilities. In particular, although a financial liability is derecognized on its settlement date, the amendments introduce an accounting policy option that permits an entity to derecognize a financial liability that is settled through an electronic payment system before the settlement date, provided that specified criteria are met;

- Additional guidance for assessing the contractual cash flow characteristics of financial assets with ESG and other similar features;

- Clarification of what constitutes a non-recourse feature and of the characteristics of contractually linked instruments; and

- Introduction of disclosure requirements for financial instruments with contingent features and additional disclosure requirements for equity instruments measured at fair value through other comprehensive income (FVOCI).

These amendments are not expected to have a material impact on the Group’s condensed consolidated interim financial statements.

2) Annual Improvements to KIFRS Accounting Standards - Volume 11

Annual Improvements to KIFRS Volume 11 have been issued to enhance consistency among the requirements of accounting standards, to clarify ambiguous matters and to improve understandability. The improvements affect the following standards:

- KIFRS 1101, “First-time Adoption of Korean International Financial Reporting Standards”: Application of hedge accounting by a first-time adopter;

- KIFRS 1107, “Financial Instruments: Disclosures”: Gain or loss on derecognition and implementation guidance;

- KIFRS 1109, “Financial Instruments”: Derecognition accounting for lease liabilities and the definition of transaction price;

- KIFRS 1110, “Consolidated Financial Statements”: Determination of a “de facto” agent; and

- KIFRS 1007, “Statement of Cash Flows”: Cost method.

These amendments are not expected to have a material impact on the Group’s condensed consolidated interim financial statements.

3) Amendments to KIFRS 1109, “Financial Instruments” and KIFRS 1107, “Financial Instruments: Disclosures” - Contracts Referencing Nature-dependent Electricity

The amendments to KIFRS 1109 and KIFRS 1107 regarding contracts referencing nature-dependent electricity have been issued, the key elements of which are as follows:

- Clarification of the application of the “own-use” requirements to contracts within the scope of the amendments;

- Amendments to the requirements for designating the hedged item in a cash flow hedge relationship for contracts within the scope of the amendments; and

- Introduction of new disclosure requirements to enable investors to understand the impact of such contracts on the entity’s financial performance and cash flows.

These amendments are not expected to have a material impact on the Group’s condensed consolidated interim financial statements.

14


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements

June 30, 2026 and 2025 (unaudited)

2.

Basis of Preparation, Continued

(6)

New accounting standards and interpretations not yet adopted

1) KIFRS 1118, “Presentation and Disclosure in Financial Statements”

KIFRS 1118, “Presentation and Disclosure in Financial Statements,” replaces KIFRS 1001, “Presentation of Financial Statements.” The standard is effective for annual reporting periods beginning on or after January 1, 2027, with early application permitted; however, the Group has not early adopted the standard.

KIFRS 1118 requires a more structured statement of profit or loss and greater disaggregation of information. The Group is currently analyzing the anticipated impact of the adoption of KIFRS 1118 on the consolidated financial statements.

The expected impacts upon initial application are described below; however, the actual impact of applying the new standard on January 1, 2027 may differ because:

- The Group has not yet completed the design and assessment of the changes to its processes and controls; and

- The new accounting policies are subject to change until the Group issues its first annual financial statements that include the date of initial application of this standard.

① Structure of the statement of profit or loss

KIFRS 1118 requires all income and expenses to be classified into one of five categories: operating, investing, financing, income taxes and discontinued operations. The classification of income and expenses into the categories depends on an entity’s main business activities. The Group has not assessed any of its specified business activities, such as investing in assets or providing financing to customers, as main business activities.

The application of KIFRS 1118 will not change the Group’s profit or loss for the period or net assets. However, the Group will be required to present two newly defined subtotals - “Operating profit” and “Profit before financing and income taxes” - and the “Operating profit” subtotal will differ from the operating profit currently presented by the Group. Based on currently available information, the Group is performing an overall preliminary assessment of the impact of applying KIFRS 1118. Examples of items expected to have a material impact on the Group’s financial statements upon initial application are as follows:

a. Income and expenses arising from investments accounted for using the equity method are always classified in the investing category in accordance with KIFRS 1118. Accordingly, the Group’s share of profit (loss) of associates, joint ventures and subsidiaries will be presented in the investing category.

b. Interest income and interest expense are, under the Group’s current accounting policies, generally included in finance income and finance expenses and presented as the subtotals “Finance income” and “Finance expenses.” KIFRS 1118 provides specific guidance on income and expenses classified in the investing and financing categories, and in accordance with such guidance the Group will classify and present its interest income and interest expense in the operating, investing and financing categories.

c. Foreign exchange differences are currently included in other income, other expenses, finance income or finance expenses, depending on their nature. Under KIFRS 1118, foreign exchange differences are required to be classified in the same category as the income and expenses arising from the item that gave rise to the foreign exchange differences; accordingly, the Group will classify foreign exchange differences into the operating, investing and financing categories based on the source of such differences.

② Management-defined Performance Measures (MPMs)

Management-defined Performance Measures (MPMs) are subtotals of income and expenses, other than those listed or required by KIFRS Accounting Standards, that an entity uses in public communications outside the financial statements and that communicate management’s view of an aspect of the financial performance of the entity as a whole to users of the financial statements. The Group will be required to disclose specific information about its MPMs in a single note to the financial statements. The Group is currently reviewing the process for determining which public communications are relevant in identifying its MPMs.

15


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements

June 30, 2026 and 2025 (unaudited)

2.

Basis of Preparation, Continued

(6)

New accounting standards and interpretations not yet adopted, continued

③ Principles of aggregation and disaggregation

KIFRS 1118 provides enhanced principles on how to group items of information by type for presentation in the financial statements (i.e., the primary financial statements and the notes). The standard also introduces guidance on how to label and describe items presented in the primary financial statements or disclosed in the notes. The Group is currently performing an assessment to aggregate and disaggregate items based on similar or dissimilar characteristics.

④ Amendments to other standards

The issuance of KIFRS 1118 resulted in amendments to KIFRS 1007, “Statement of Cash Flows.” When presenting cash flows from operating activities using the indirect method, the newly defined “Operating profit” subtotal is required to be used as the starting point of the indirect method. The Group currently uses “profit or loss for the period” as the starting point for cash flows from operating activities.

As a result, certain of the reconciling items to the indirect-method starting point will change. For example, the Group’s share of profit (loss) of equity-accounted investees is not included in the new starting point of operating profit and accordingly is no longer a reconciling item. Cash dividends received from such investees are presented in cash flows from investing activities.

In addition, the amendments to KIFRS 1007 provide specific guidance on the classification of cash flows arising from interest and dividends. In accordance with such guidance, the Group will classify cash flows from interest paid as financing activities rather than operating activities; interest received and dividends received will be classified as investing activities; and dividends paid will be classified as financing activities.

3.

Material Accounting Policies

The accounting policies applied by the Group in these consolidated financial statements are the same as those applied by the Group in its consolidated financial statements as of and for the year ended December 31, 2025, except for the changes described in Note 2.(5).

16


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

4.

Segment, Geographic and Other Information

(1)

Segment determination and explanation of the measurements

The Group’s operating segments are its business components that generate discrete financial information that is reported to and regularly reviewed by chief operating decision maker of the Group for the purpose of resource allocation and assessment of segment performance. The Group’s reportable segments classified in accordance with KIFRS 1108 are “Transmission and distribution”, “Electric power generation (Nuclear)”, “Electric power generation (Non-nuclear)”, “Plant maintenance & engineering service” and “Others”; others mainly represent the business unit that manages the Group’s foreign operations.

Segment operating profit (loss), which is the measure for segment profit or loss, is determined in the same way that condensed consolidated operating profit is determined under KIFRS without any adjustment for corporate allocations. The accounting policies used by each segment are consistent with the accounting policies used in the preparation of the condensed consolidated financial statements. Segment assets and liabilities are determined based on separate financial statements of the entities instead of on a consolidated basis. There are various transactions between the reportable segments, including sales of property, plant and equipment and so on, that are conducted on an arm’s-length basis at market prices that would be applicable to an independent third party. For subsidiaries which are in a different segment from that of its immediate parent company, their carrying amount in separate financial statements is eliminated in the consolidating adjustments in the tables below. In addition, consolidation adjustments in the table below include adjustments of the amount of investment in associates and joint ventures from the cost basis amount reflected in segment assets to that determined using equity method in the condensed consolidated financial statements.

17


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

4.

Segment, Geographic and Other Information, Continued

(2)

The financial information of the segments for each of the three and six-month periods ended June 30, 2026 and 2025, respectively, is as follows:

In millions of won

For the three and six-month period ended June 30, 2026

Segment

Total
segment
revenue
Intersegment
revenue
Revenue
from
external
customers
Operating
Profit (loss)
Depreciation
and
amortization
Interest
income
Interest
expense
Profit (loss) related to
associates, joint
ventures and
subsidiaries
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Transmission and distribution

W 21,286,981 44,996,140 600,519 1,076,315 20,686,462 43,919,825 36,079 2,122,808 1,188,038 2,358,969 23,271 45,998 597,011 1,200,385 175,918 405,309

Electric power generation (Nuclear)

4,235,237 8,151,625 4,024,110 7,673,995 211,127 477,630 1,626,731 3,089,234 1,127,888 2,225,646 14,958 31,388 205,660 411,335 (6,420 ) (7,889 )

Electric power generation (Non-nuclear)

6,321,842 13,478,888 5,633,465 12,221,013 688,377 1,257,875 (505,834 ) (245,653 ) 1,092,297 2,132,769 13,392 23,080 182,594 352,902 30,604 104,558

Plant maintenance & engineering service

816,620 1,604,001 688,358 1,319,406 128,262 284,595 67,996 141,913 43,451 85,283 5,348 11,552 758 2,362 289 383

Others

541,913 1,123,436 337,289 746,022 204,624 377,414 15,672 43,093 59,341 118,746 56,490 113,367 86,028 156,329 —  — 

Consolidation adjustments

(11,283,741 ) (23,036,751 ) (11,283,741 ) (23,036,751 ) —  —  (112,092 ) (238,674 ) (43,640 ) (83,745 ) (16,009 ) (30,980 ) (22,656 ) (44,192 ) —  — 
W 21,918,852 46,317,339 —  —  21,918,852 46,317,339 1,128,552 4,912,721 3,467,375 6,837,668 97,450 194,405 1,049,395 2,079,121 200,391 502,361

In millions of won

For the three and six-month period ended June 30, 2025

Segment

Total
segment
revenue
Intersegment
revenue
Revenue
from
external
customers
Operating
Profit (loss)
Depreciation
and
amortization
Interest
income
Interest
expense
Profit (loss) related to
associates, joint
ventures and
subsidiaries
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Transmission and distribution

W 21,600,000 45,461,484 555,450 1,128,495 21,044,550 44,332,989 956,576 2,857,492 1,131,481 2,242,319 19,336 50,543 665,582 1,351,119 117,151 161,590

Electric power generation (Nuclear)

3,931,460 8,206,340 3,846,685 8,111,620 84,775 94,720 1,110,554 2,396,048 1,236,933 2,568,976 22,059 35,209 191,582 399,529 4,497 (9,684 )

Electric power generation (Non-nuclear)

6,023,117 13,052,147 5,559,259 11,931,118 463,858 1,121,029 (11,119 ) 565,483 1,039,245 2,073,290 12,411 22,763 173,698 339,047 46,835 141,481

Plant maintenance & engineering service

848,404 1,518,012 703,242 1,262,161 145,162 255,851 90,014 120,773 42,618 84,988 7,162 15,917 1,108 3,129 (208 ) 8

Others

521,913 1,084,917 310,120 715,384 211,793 369,533 16,620 39,582 54,678 117,121 56,871 119,984 84,011 162,164 —  — 

Consolidation adjustments

(10,974,756 ) (23,148,778 ) (10,974,756 ) (23,148,778 ) —  —  (26,773 ) (89,899 ) (44,532 ) (92,810 ) (14,782 ) (29,370 ) (21,849 ) (43,732 ) —  — 
W 21,950,138 46,174,122 —  —  21,950,138 46,174,122 2,135,872 5,889,479 3,460,423 6,993,884 103,057 215,046 1,094,132 2,211,256 168,275 293,395

18


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

4.

Segment, Geographic and Other Information, Continued

(3)

The information related to segment assets and segment liabilities as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won

As of June 30, 2026

Segment

Segment
assets
Investments in
associates and

joint ventures
Acquisition of
non-current assets
Segment
liabilities

Transmission and distribution

W 146,742,208 9,203,342 5,451,063 118,295,435

Electric power generation (Nuclear)

78,653,448 224,703 1,539,314 50,835,377

Electric power generation (Non-nuclear)

63,681,180 4,780,965 2,989,081 38,589,072

Plant maintenance & engineering service

4,280,548 1,438 76,639 1,311,259

Others

17,802,728 —  59,357 7,049,728

Consolidation adjustments

(48,598,748 ) —  (74,421 ) (5,364,714 )
W 262,561,364 14,210,448 10,041,033 210,716,157
In millions of won

As of December 31, 2025

Segment

Segment
assets
Investments in
associates and

joint ventures
Acquisition of
non-current assets
Segment
liabilities

Transmission and distribution

W 144,616,479 8,606,616 9,077,814 118,045,718

Electric power generation (Nuclear)

76,378,365 169,728 2,532,322 49,741,461

Electric power generation (Non-nuclear)

63,352,471 4,585,612 4,634,208 35,395,912

Plant maintenance & engineering service

4,363,345 1,832 202,142 1,346,629

Others

17,125,478 —  254,262 6,885,650

Consolidation adjustments

(50,908,681 ) —  (111,689 ) (5,810,857 )
W 254,927,457 13,363,788 16,589,059 205,604,513

19


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

4.

Segment, Geographic and Other Information, Continued

(4)

Geographic information

Electricity sales, the main operations of the Group, are conducted in the Republic of Korea. The following information on revenue from external customers and non-current assets is determined by the location of the customers and of the assets:

In millions of won Revenue from external customers Non-current assets (*2)
June 30, 2026 June 30, 2025 June 30,
2026
December 31,
2025

Geographical unit

Three-
month period
ended
Six-
month period
ended
Three-
month period
ended
Six-
month period
ended

Domestic

W 21,583,355 45,587,161 21,698,359 45,715,418 202,604,898 196,736,382

Overseas (*1)

335,497 730,178 251,779 458,704 6,355,385 6,731,565
W 21,918,852 46,317,339 21,950,138 46,174,122 208,960,283 203,467,947
(*1)

Middle East, Asia and the Americas make up the majority of overseas revenue and non-current assets. Since the overseas revenue or non-current assets attributable to particular countries are not material, they are not disclosed individually.

(*2)

The amounts exclude financial assets, deferred tax assets and defined benefit assets.

(5)

Information on significant customers

There is no single customer who accounts for 10% or more of the Group’s revenue for each of the six-month periods ended June 30, 2026 and 2025.

20


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

5.

Classification of Financial Instruments

(1)

The classification of financial assets as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026
Financial assets at
fair value through
profit or loss
Financial assets
at fair value
through other
comprehensive
income
Financial assets
at amortized cost
Derivative assets
(applying hedge
accounting)
Total

Current assets

Cash and cash equivalents

W —  —  2,622,064 —  2,622,064

Current financial assets

Current financial assets at fair value through profit or loss

1,791,646 —  —  —  1,791,646

Current financial assets at amortized costs

—  —  22,480 —  22,480

Current derivative assets

857,183 —  —  279,789 1,136,972

Loans

—  —  259,820 —  259,820

Other financial assets and others

—  —  1,356,293 —  1,356,293

Trade and other receivables

—  —  12,144,289 —  12,144,289
2,648,829 —  16,404,946 279,789 19,333,564

Non-current assets

Non-current financial assets

Non-current financial assets at fair value through profit or loss

710,320 —  —  —  710,320

Non-current financial assets at fair value through other comprehensive income

—  881,210 —  —  881,210

Non-current financial assets at amortized costs

—  —  8,306 —  8,306

Non-current derivative assets

1,470,828 —  —  181,381 1,652,209

Loans

—  —  828,335 —  828,335

Other financial assets and others

—  —  896,492 —  896,492

Trade and other receivables

—  —  3,209,795 —  3,209,795
2,181,148 881,210 4,942,928 181,381 8,186,667
W 4,829,977 881,210 21,347,874 461,170 27,520,231

21


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

5.

Classification of Financial Instruments, Continued

(1)

The classification of financial assets as of June 30, 2026 and December 31, 2025 is as follows, continued:

In millions of won As of December 31, 2025
Financial assets at
fair value through
profit or loss
Financial assets
at fair value
through other
comprehensive
income
Financial assets
at
amortized cost
Derivative assets
(applying hedge
accounting)
Total

Current assets

Cash and cash equivalents

W —  —  2,240,811 —  2,240,811

Current financial assets

Current financial assets at fair value through profit or loss

1,299,027 —  —  —  1,299,027

Current financial assets at amortized costs

—  —  21,663 —  21,663

Current derivative assets

492,028 —  —  344,204 836,232

Loans

—  —  95,598 —  95,598

Other financial assets and others

—  —  1,997,644 —  1,997,644

Trade and other receivables

—  —  12,618,480 —  12,618,480
1,791,055 —  16,974,196 344,204 19,109,455

Non-current assets

Non-current financial assets

Non-current financial assets at fair value through profit or loss

696,199 —  —  —  696,199

Non-current financial assets at fair value through other comprehensive income

—  885,173 —  —  885,173

Non-current financial assets at amortized costs

—  —  9,454 —  9,454

Non-current derivative assets

1,055,987 —  —  143,331 1,199,318

Loans

—  —  890,930 —  890,930

Other financial assets and others

—  —  884,487 —  884,487

Trade and other receivables

—  —  3,124,185 —  3,124,185
1,752,186 885,173 4,909,056 143,331 7,689,746
W 3,543,241 885,173 21,883,252 487,535 26,799,201

22


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

5.

Classification of Financial Instruments, Continued

(2)

The classification of financial liabilities as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026
Financial liabilities
at fair value
through
profit or loss
Financial liabilities
recognized at
amortized cost
Derivative liabilities
(applying hedge
accounting)
Total

Current liabilities

Borrowings

W —  21,373,116 —  21,373,116

Debt securities

—  29,286,724 —  29,286,724

Derivative liabilities

47,919 —  —  47,919

Trade and other payables

—  10,066,126 —  10,066,126
47,919 60,725,966 —  60,773,885

Non-current liabilities

Borrowings

—  3,206,373 —  3,206,373

Debt securities

—  79,450,730 —  79,450,730

Derivative liabilities

78,048 —  134 78,182

Trade and other payables

—  4,057,453 —  4,057,453
78,048 86,714,556 134 86,792,738
W 125,967 147,440,522 134 147,566,623
In millions of won As of December 31, 2025
Financial liabilities
at fair value
through
profit or loss
Financial liabilities
recognized at
amortized cost
Derivative liabilities
(applying hedge
accounting)
Total

Current liabilities

Borrowings

W —  18,721,522 —  18,721,522

Debt securities

—  27,165,448 —  27,165,448

Derivative liabilities

52,119 —  —  52,119

Trade and other payables

—  8,621,671 —  8,621,671
52,119 54,508,641 —  54,560,760

Non-current liabilities

Borrowings

—  3,274,774 —  3,274,774

Debt securities

—  80,607,548 —  80,607,548

Derivative liabilities

113,254 —  126 113,380

Trade and other payables

—  4,028,808 —  4,028,808
113,254 87,911,130 126 88,024,510
W 165,373 142,419,771 126 142,585,270

23


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

5.

Classification of Financial Instruments, Continued

(3)

The classification of comprehensive income (loss) from financial instruments for each of the three and six-month periods ended June 30, 2026 and 2025 is as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Cash and cash equivalents

Interest income W 17,030 34,377 23,134 52,064

Gain (loss) on foreign currency

transactions and translations

9,378 9,904 (11,860 ) (18,549 )

Financial assets at fair value through profit or loss

Interest income 9,969 18,403 12,081 19,720
Dividends income 3,037 3,193 3,066 3,128
Gain on valuation of financial assets 24,205 40,525 20,008 34,402
Gain on disposal of financial assets 13,063 28,109 6,984 16,813

Financial assets at fair value through other comprehensive income

Dividends income 2,850 22,769 6,704 20,193
Gain on valuation of financial assets at fair value through other comprehensive income (equity, before tax) (67,413 ) 3,420 105,260 52,179

Financial assets at amortized cost

Interest income 70,451 141,625 67,843 143,262
Gain (loss) on disposal of financial assets (29 ) (30 ) 1 — 
Bad debt expense (Reversal of bad debt allowance) 101,794 92,107 14,929 25,804
Gain (loss) on foreign currency transactions and translations 46,466 103,392 (50,319 ) (44,327 )

Derivatives

Gain (loss) on valuation of derivatives (profit or loss) 226,844 1,175,953 (1,029,015 ) (992,007 )

Gain (loss) on valuation of derivatives

(equity, before tax)

8,825 24,906 (1,271 ) 18,630
Gain (loss) on transaction of derivatives 59,595 162,190 (167,697 ) (123,016 )

Financial liabilities carried at amortized cost

Interest expense of borrowings

and debt securities

804,599 1,593,363 882,896 1,787,080

Interest expense of trade and other

Payables

43,554 66,550 41,637 85,166
Interest expense of others 201,242 419,208 169,599 339,010
Other finance income 569 1,351 679 1,510
Other finance expenses 13,301 24,590 354 796

Gain (loss) on foreign currency

transactions and translations

(351,429 ) (1,356,709 ) 1,523,362 1,612,879

24


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

6.

Restricted Deposits

Restricted deposits as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June30, 2026 As of December 31, 2025

Cash and cash equivalents

Escrow accounts W 3,111 3,082
Deposits for government project and others 27,984 27,023
Collateral provided for borrowings 335,888 263,685
Collateral provided for lawsuit 2 2
Deposits for transmission regional support program 7,405 3,498
Deposits for other business purposes 38,296 22,064

Short-term financial instruments

Restriction on withdrawal related to ‘win-win growth

program’ for small and medium enterprises and others

296,500 292,500
Collateral provided for borrowings 23,614 23,614
Bid bonds 74,070 68,010

Non-current financial assets at fair value through profit or loss

Decommissioning costs of nuclear power plants 259,067 257,649

Long-term financial instruments

Guarantee deposits for bank accounts

at overseas branches

1 1
Collateral provided for borrowings 26,153 18,245
Long-term financial instruments Collateral for other business purposes 181 — 
Decommissioning costs of nuclear power plants 750,000 730,004
Small and Medium Enterprise Development Fund —  4,000

Long-term deposit

Court Deposit 4,588 4,588

Other non-current financial assets

Deposits for other business purposes

6,531 6,359
W 1,853,391 1,724,324
7.

Cash and Cash Equivalents

Cash and cash equivalents as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Cash

W 11,529 10,982

Other demand deposits

1,864,794 1,562,485

Short-term deposits classified as cash equivalents

731,327 558,775

Short-term investments classified as cash equivalents

14,414 108,569
W 2,622,064 2,240,811

25


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

8.

Trade and Other Receivables

(1)

Trade and other receivables as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Gross
amount
Allowance for
doubtful accounts
Present value
discount
Book
value

Current assets

Trade receivables

W 11,000,390 (204,031 ) —  10,796,359

Other receivables

1,435,139 (83,399 ) (3,810 ) 1,347,930
12,435,529 (287,430 ) (3,810 ) 12,144,289

Non-current assets

Trade receivables

1,091,594 (93,574 ) (79,141 ) 918,879

Other receivables

2,430,346 (122,381 ) (17,049 ) 2,290,916
3,521,940 (215,955 ) (96,190 ) 3,209,795
W 15,957,469 (503,385 ) (100,000 ) 15,354,084
In millions of won As of December 31, 2025
Gross
amount
Allowance for
doubtful accounts
Present value
discount
Book
value

Current assets

Trade receivables

W 11,811,493 (186,596 ) —  11,624,897

Other receivables

1,039,679 (42,415 ) (3,681 ) 993,583
12,851,172 (229,011 ) (3,681 ) 12,618,480

Non-current assets

Trade receivables

1,037,726 (93,718 ) (83,101 ) 860,907

Other receivables

2,395,952 (118,479 ) (14,195 ) 2,263,278
3,433,678 (212,197 ) (97,296 ) 3,124,185
W 16,284,850 (441,208 ) (100,977 ) 15,742,665

26


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

8.

Trade and Other Receivables, Continued

(2)

Other receivables as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Gross
amount
Allowance for
doubtful accounts
Present value
discount
Book
value

Current assets

Non-trade receivables

W 743,159 (36,408 ) (424 ) 706,327

Accrued income

100,972 (11,702 ) —  89,270

Deposits

273,880 —  (3,386 ) 270,494

Finance lease receivables (*1)

121,624 (5,594 ) —  116,030

Others

195,504 (29,695 ) —  165,809
1,435,139 (83,399 ) (3,810 ) 1,347,930

Non-current assets

Non-trade receivables

338,568 (49,769 ) (5,546 ) 283,253

Accrued income

60,119 (6,627 ) —  53,492

Deposits

515,364 (414 ) (11,503 ) 503,447

Finance lease receivables (*2)

1,217,294 (1,435 ) —  1,215,859

Others

299,001 (64,136 ) —  234,865
2,430,346 (122,381 ) (17,049 ) 2,290,916
W 3,865,485 (205,780 ) (20,859 ) 3,638,846
(*1)

The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of W116,388 million.

(*2)

The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of W813,223 million.

In millions of won As of December 31, 2025
Gross
amount
Allowance for
doubtful accounts
Present value
discount
Book
value

Current assets

Non-trade receivables

W 478,822 (36,074 ) (474 ) 442,274

Accrued income

43,123 —  —  43,123

Deposits

268,090 —  (3,207 ) 264,883

Finance lease receivables (*1)

104,600 (5,048 ) —  99,552

Others

145,044 (1,293 ) —  143,751
1,039,679 (42,415 ) (3,681 ) 993,583

Non-current assets

Non-trade receivables

401,390 (76,770 ) (5,096 ) 319,524

Accrued income

65,615 (6,320 ) —  59,295

Deposits

516,519 (414 ) (9,099 ) 507,006

Finance lease receivables (*2)

1,172,687 (1,954 ) —  1,170,733

Others

239,741 (33,021 ) —  206,720
2,395,952 (118,479 ) (14,195 ) 2,263,278
W 3,435,631 (160,894 ) (17,876 ) 3,256,861
(*1)

The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of W113,272 million.

(*2)

The gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of W818,800 million.

(3)

Trade and other receivables are classified as financial assets at amortized cost and are measured using the effective interest rate method. No interest is accrued for trade receivables related to electricity for the duration between the billing date and the payment due dates. However, once trade receivables are overdue, the Group imposes a monthly interest rate of 1.5%, calculated on a daily basis, on the overdue trade receivables for the first month and the following month. The Group holds deposits of three months’ expected electricity usage for customers requesting temporary usage and customers whose contracts have been cancelled due to delinquent payments.

27


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

8.

Trade and Other Receivables, Continued

(4)

The aging analysis of trade receivables as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Trade receivables not overdue

W 11,701,826 12,472,407

Trade receivables overdue and impairment - reviewed:

390,158 376,812

Less than 60 days

5,282 15,256

60 ~ 90 days

48,277 54,093

90 ~ 120 days

17,559 21,317

120 days ~ 1 year

77,178 65,435

More than 1 year

241,862 220,711
12,091,984 12,849,219

Less: allowance for doubtful accounts

(297,605 ) (280,314 )

Less: present value discount

(79,141 ) (83,101 )
W 11,715,238 12,485,804

At the end of each reporting period, the Group assesses whether the credit to trade receivables is impaired. The Group recognizes loss allowances for trade receivables individually when there is any objective evidence that other receivables are impaired and significant and classifies the trade receivables that are not individually assessed as the trade receivables subject to be assessed on a collective basis. Also, the Group recognizes loss allowances based on an expected credit loss (ECL) model.

(5)

Changes in the allowance for doubtful accounts for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026 For the year ended December 31, 2025
Trade receivables Other receivables Trade receivables Other receivables

Beginning balance

W 280,314 160,894 260,774 140,168

Bad debts expense

32,078 68,272 84,625 8,155

Write-off

(12,205 ) (313 ) (37,639 ) (14,675 )

Reversal

(6,587 ) (2,659 ) (2,223 ) (4,101 )

Others

4,005 (20,414 ) (25,223 ) 31,347

Ending balance

W 297,605 205,780 280,314 160,894

28


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

9.

Financial Assets at Fair Value through Profit or Loss

Financial assets at fair value through profit or loss as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Financial assets at fair value through profit or loss

Beneficiary certificate

W 10,455 150,013 320 125,837

Cooperative

—  6,559 —  6,413

Others (*1)

1,781,191 422,655 1,298,707 428,389
1,791,646 579,227 1,299,027 560,639

Financial assets designated as at fair value

through profit or loss

Debt with embedded derivatives and others

—  131,093 —  135,560
W 1,791,646 710,320 1,299,027 696,199
(*1)

Others consist of MMT, equity securities and others.

29


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

10.

Financial Assets at Fair Value through Other Comprehensive Income

(1)

Changes in financial assets at fair value through other comprehensive income for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Acquisition Disposal Valuation Others Ending
balance

Equity securities

Listed

W 517,251 —  —  176 20 517,447

Unlisted

363,128 —  (8,805 ) 3,245 1,401 358,969
880,379 —  (8,805 ) 3,421 1,421 876,416

Debt securities

Corporate bond

4,794 —  —  —  —  4,794
W 885,173 —  (8,805 ) 3,421 1,421 881,210

Current financial assets at fair value through other comprehensive income

W —  —  —  —  —  — 

Non-current financial assets at fair value through other comprehensive income

885,173 —  (8,805 ) 3,421 1,421 881,210
In millions of won For the year ended December 31, 2025
Beginning
balance
Acquisition Disposal Valuation Others Ending
balance

Equity securities

Listed

W 360,096 —  (3,091 ) 160,245 1 517,251

Unlisted

309,709 —  (10 ) 52,343 1,086 363,128
669,805 —  (3,101 ) 212,588 1,087 880,379

Debt securities

Corporate bond

5,045 —  —  (251 ) —  4,794
W 674,850 —  (3,101 ) 212,337 1,087 885,173

Current financial assets at fair value through other comprehensive income

W —  —  —  —  —  — 

Non-current financial assets at fair value through other comprehensive income

674,850 —  (3,101 ) 212,337 1,087 885,173

30


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

10.

Financial Assets at Fair Value through Other Comprehensive Income, Continued

(2)

Financial assets at fair value through other comprehensive income as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Shares (in shares) Ownership Acquisition cost Book value Fair value

Listed

Korea District Heating Corp.

2,264,068

19.55

%

W

173,201

146,259

146,259

KG Mobility Co., Ltd.

12,205

0.01

%

428

34

34

SM Korea Line Corp.

180

— 

1

— 

— 

Namkwang Engineering & Construction Co., Ltd.

121

— 

15

1

1

Bumyang Construction Co., Ltd.

35

— 

2

— 

— 

ELCOMTEC Co., Ltd.

6,575

0.04

%

217

19

19

PAN Ocean Co., Ltd.

1,492

— 

14

7

7

Codes Combine Co., Ltd.

291

— 

1

1

1

PT Almatri Resources Indonesia

480,000,000

1.60

%

65,028

93,727

93,727

Denison Mines Corp.

58,284,000

7.46

%

84,134

275,104

275,104

Paladin Energy

10,760

0.01

%

41

110

110

KS Industry Co., Ltd

1,457

0.01

%

38

1

1

Vitzrosys Co., Ltd.

79

— 

2

— 

— 

EMnI Co., Ltd.

628

— 

25

1

1

Vissem electronics, Co., Ltd.

301

— 

11

2

2

KC Industry Co., Ltd.

139

— 

6

— 

— 

Ihsung CNI Co., Ltd.

142,860

4.43

%

1,500

804

804

A One Cubetech Co., Ltd. (formerly Aone Alform Co., Ltd.)

2,672

0.04

%

19

2

2

Kodaco Co., Ltd.

131,698

0.85

%

1,317

1,354

1,354

Q-Aid Co., Ltd. (formerly Winia Aid Co., Ltd.)

4,826

0.01

%

22

20

20

EONE-DIAGNOMICS Co., Ltd.

1,518

— 

1

1

1

326,023

517,447

517,447

Unlisted (*1)

Set Holding (*2)

1,100,220

2.50

%

229,255

310,808

310,808

SGC Greenpower Co., Ltd.

580,000

5.00

%

2,900

5,806

5,806

Le Soleil KHNP LLC

137,600

19.00

%

1,376

1,376

1,376

Ihsung CNI Co., Ltd.

127,660

3.96

%

1,500

2,144

2,144

H Robotics Co., Ltd.

903,601

7.05

%

4,000

400

400

Good Tcells Co., Ltd.

11,364

0.33

%

500

630

630

IPS Bio Co., Ltd.

1,975

3.13

%

1,000

873

873

Nine B Co., Ltd.

5,000

4.96

%

1,000

1,000

1,000

Orano Expansion

5,742,405

4.72

%

— 

— 

— 

Common Computer Co., Ltd.

3,856

1.64

%

1,000

862

862

Fine Powerex Co., Ltd.

72,633

4.45

%

1,500

1,714

1,714

Agencore Co., Ltd.

175,779

6.31

%

2,200

2,934

2,934

SamHong Machinery Co., Ltd.

992,601

6.05

%

4,685

9,775

9,775

Aloha Factory Co., Ltd.

2,970

3.70

%

1,000

639

639

Dailyshot Co., Ltd.

1,695

1.64

%

1,001

1,205

1,205

Mediquitous Co., Ltd.

5,080

0.48

%

1,250

1,546

1,546

Black Materials Co., Ltd.

37,038

8.31

%

500

431

431

Monit Co., Ltd.

333,334

14.29

%

1,000

853

853

3i Powergen Inc.(*6)

— 

15.00

%

1,482

— 

— 

Enersys Co., Ltd.

9,763

19.62

%

2,050

337

337

Kalman Co., Ltd.

23,172

9.54

%

1,000

821

821

Himet Co., Ltd.

1,754,386

13.93

%

5,000

4,182

4,182

PT.KedapSayaaq

671

10.00

%

18,540

— 

— 

Joongang Platec Co., Ltd.

3,591

0.75

%

72

35

35

Pioneer Gas Power Limited (*5)

123,200,010

38.50

%

49,831

— 

— 

Bobaek C&S Co., Ltd.

13,246

0.87

%

2,000

2,000

2,000

BDI Co., Ltd. (*3,4)

6,390,478

32.50

%

— 

— 

— 

Suwon New Power Co., Ltd. and others (*7,8)

12,795

8,598

8,598

348,437

358,969

358,969

31


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

10.

Financial Assets at Fair Value through Other Comprehensive Income, Continued

(2)

Financial assets at fair value through other comprehensive income as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won As of June 30, 2026
Shares (in shares) Ownership Acquisition cost Book value Fair value

Debt securities (*1)

Aron Flying Ship Co., Ltd. (*9)

—  —  W 491 —  — 

Ino Platech Co., Ltd.

—  —  1,080 1,278 1,278

Daebon Tech Co., Ltd.

—  —  3,000 3,516 3,516
4,571 4,794 4,794
W 679,031 881,210 881,210
(*1)

The Group used initial cost as their fair value because there was not enough information to determine fair value, and the range of the estimated fair value is wide, and cost represents the best estimate of fair value within that range.

(*2)

The Group has estimated the fair value of Set Holding by using the income approach and has recognized the difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the six-month period ended June 30, 2026.

(*3)

The Group acquired shares in the entity through conversion of investments performed in accordance with corporate rehabilitation procedures before the prior year, and classified the investments in the entity as financial assets at fair value through other comprehensive income as the Group does not hold significant influence over the entity until the corporate rehabilitation procedures are completed.

(*4)

Prior to the year ended December 31, 2025, BDI Co., Ltd. was delisted as the Court dismissed the application for temporary injunction requiring the suspension of delisting decision and others.

(*5)

The entity commenced corporate rehabilitation procedures prior to the year ended December 31, 2025, and the Group cannot hold significant influence over the entity until the corporate rehabilitation procedures are completed. Therefore, investments in the entity were reclassified as financial assets at fair value through other comprehensive income. As of June 30, 2026, liquidation procedures are in progress, and the carrying amount was measured at nil considering its recoverability.

(*6)

The Group has recognized an impairment loss on 3i Powergen Inc. for the difference between the carrying amount and the recoverable amount, due to the discontinuation of its operations.

(*7)

During the six-month period ended June 30, 2026, KEPCO Engineering & Construction Company, Inc., a subsidiary of the Group, disposed of its equity interest in Suwon New Power Co., Ltd. Accordingly, the remaining shares held by the Group were reclassified as financial assets at fair value through other comprehensive income.

(*8)

Equity securities acquired through debt-to-equity swaps of electricity receivables and others, consisting of Suwon New Power Co., Ltd. and 533 other companies.

(*9)

For Aron Flying Ship Industrial Co., Ltd., the valuation amount arising from the fair value estimated using the market approach was recognized in accumulated other comprehensive income as net change in fair value of financial assets at fair value through other comprehensive income.

32


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

10.

Financial Assets at Fair Value through Other Comprehensive Income, Continued

(2)

Financial assets at fair value through other comprehensive income as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won As of December 31, 2025
Shares (in shares) Ownership Acquisition cost Book value Fair value

Listed

Korea District Heating Corp.

2,264,068 19.55 % W 173,201 218,255 218,255

KG Mobility Co., Ltd.

12,205 0.01 % 428 43 43

SM Korea Line Corp.

180 —  1 —  — 

Namkwang Engineering & Construction Co., Ltd.

46 —  15 —  — 

Bumyang Construction Co., Ltd.

35 —  2 —  — 

ELCOMTEC Co., Ltd.

32,875 0.04 % 217 26 26

PAN Ocean Co., Ltd.

1,492 —  14 6 6

Codes Combine Co., Ltd.

291 —  1 1 1

PT Almatri Resources Indonesia

480,000,000 1.60 % 65,028 74,369 74,369

Denison Mines Corp.

58,284,000 7.46 % 84,134 222,278 222,278

Paladin Energy

10,760 0.01 % 41 98 98

KS Industry Co., Ltd

1,457 0.01 % 38 1 1

Vitzrosys Co., Ltd.

399 —  2 —  — 

EMnI Co., Ltd.

628 —  25 1 1

Vissem electronics, Co., Ltd.

301 —  11 2 2

KC Industry Co., Ltd.

139 —  6 —  — 

Ihsung CNI Co., Ltd.

142,860 4.43 % 1,500 813 813

Aone Alform Co., Ltd.

2,672 0.04 % 19 3 3

Kodaco Co., Ltd.

131,698 0.85 % 1,317 1,354 1,354

Q-Aid Co., Ltd. (formerly Winia Aid Co., Ltd.)

129 —  1 1 1
326,001 517,251 517,251

Unlisted (*1)

Set Holding (*2)

1,100,220 2.50 % 229,255 310,808 310,808

SGC Greenpower Co., Ltd.

580,000 5.00 % 2,900 5,807 5,807

Le Soleil KHNP LLC

137,600 19.00 % 1,376 1,376 1,376

Ihsung CNI Co., Ltd.

127,660 3.96 % 1,500 2,144 2,144

H Robotics Co., Ltd.

903,601 7.05 % 4,000 399 399

Good Tcells Co., Ltd.

11,364 0.33 % 500 630 630

IPS Bio Co., Ltd.

1,975 3.13 % 1,000 873 873

Nine B Co., Ltd.

5,000 4.96 % 1,000 1,000 1,000

Orano Expansion

5,742,405 4.72 % —  —  — 

Common Computer Co., Ltd.

3,856 1.64 % 1,000 862 862

Fine Powerex Co., Ltd.

72,633 4.45 % 1,500 1,714 1,714

Agencore Co., Ltd.

175,779 6.31 % 2,200 2,934 2,934

SamHong Machinery Co., Ltd.

1,543,837 9.13 % 7,000 15,099 15,099

Aloha Factory Co., Ltd.

2,970 3.70 % 1,000 639 639

Dailyshot Co., Ltd.

1,695 1.64 % 1,001 1,205 1,205

Mediquitous Co., Ltd.

5,080 0.48 % 1,250 1,546 1,546

Black Materials Co., Ltd.

37,038 8.31 % 500 431 431

Monit Co., Ltd.

333,334 14.29 % 1,000 853 853

3i Powergen Inc.(*6)

—  15.00 % 1,482 —  — 

Enersys Co., Ltd.

9,763 19.62 % 2,050 337 337

Kalman Co., Ltd.

23,172 9.54 % 1,000 821 821

Himet Co., Ltd.

1,754,386 13.93 % 5,000 4,182 4,182

PT.KedapSayaaq

671 10.00 % 18,540 —  — 

Joongang Platec Co., Ltd.

3,591 0.75 % 72 35 35

Pioneer Gas Power Limited (*5)

123,200,010 38.50 % 49,831 —  — 

Bobaek C&S Co., Ltd.

13,246 0.87 % 2,000 2,000 2,000

BDI Co., Ltd. (*3,4)

6,390,478 32.50 % —  —  — 

Hwan Young Steel Co., Ltd. and others (*7)

—  —  11,631 7,433 7,433
349,588 363,128 363,128

33


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

10.

Financial Assets at Fair Value through Other Comprehensive Income, Continued

(2)

Financial assets at fair value through other comprehensive income as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won As of December 31, 2025
Shares (in shares) Ownership Acquisition cost Book value Fair value

Debt securities (*1)

Aron Flying Ship Co., Ltd.

—  —  W 491 —  — 

Ino Platech Co., Ltd.

—  —  1,080 1,278 1,278

Daebon Tech Co., Ltd.

—  —  3,000 3,516 3,516
4,571 4,794 4,794
W 680,160 885,173 885,173
(*1)

The Group used initial cost as their fair value because there was not enough information to determine fair value, and the range of the estimated fair value is wide, and cost represents the best estimate of fair value within that range.

(*2)

The Group has estimated the fair value of Set Holding by using the income approach and has recognized the difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the year ended December 31, 2025.

(*3)

The Group acquired shares in the entity through conversion of investments performed in accordance with corporate rehabilitation procedures before the prior year, and classified the investments in the entity as financial assets at fair value through other comprehensive income as the Group does not hold a significant influence over the entity until the corporate rehabilitation procedures are completed.

(*4)

During the year ended December 31, 2025, BDI Co., Ltd. was delisted as the Court dismissed the application for temporary injunction requiring the suspension of delisting decision and others.

(*5)

The entity commenced corporate rehabilitation procedures during the year ended December 31, 2025, and the Group cannot hold significant influence over the entity until the corporate rehabilitation procedures are completed. Therefore, investments in the entity were reclassified as financial assets at fair value through other comprehensive income. As of December 31, 2025, liquidation procedures were in progress, and the carrying amount was measured at nil considering its recoverability.

(*6)

The Group has recognized an impairment loss on 3i Powergen Inc. for the difference between the carrying amount and the recoverable amount, due to the discontinuation of its operations.

(*7)

Equity securities, acquired through debt-for-equity swaps of electricity rate bonds and others, consist of Hwan Young Steel Co., Ltd. and 505 other companies.

34


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

11.

Financial Assets at Amortized Cost

Financial assets at amortized cost as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Financial assets
at amortized cost
Book
value

Government bonds

W 1,397 1,397

Others

29,389 29,389
W 30,786 30,786

Current

W 22,480 22,480

Non-current

8,306 8,306
In millions of won As of December 31, 2025
Financial assets
at amortized cost
Book
value

Government bonds

W 1,423 1,423

Others

29,694 29,694
W 31,117 31,117

Current

W 21,663 21,663

Non-current

9,454 9,454

35


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives

(1)

Derivatives as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Derivative assets

Currency forward

W 4,939 —  76 — 

Currency swap

1,119,619 1,326,290 833,715 927,127

Interest rate swap

12,414 221,028 2,441 174,195

Others (*2,3)

—  104,891 —  97,996
W 1,136,972 1,652,209 836,232 1,199,318

Derivative liabilities

Currency forward

W 4,038 —  9,078 — 

Currency swap

4,797 3,788 4,786 23,761

Interest rate swap

830 19,606 —  37,560

Others (*1,2,4)

38,254 54,788 38,255 52,059
W 47,919 78,182 52,119 113,380
(*1)

In relation to the agreement to purchase hybrid bonds issued by Samcheok Eco Materials Co., Ltd., a joint venture of the Group, the performance obligation as of June 30, 2026 which amounts to W23,494 million (W23,494 million as of December 31, 2025) to the underwriter of the bonds was recorded as other derivative liabilities.

(*2)

The Group recorded the fair value of derivatives in accordance with the shareholders’ agreement of its associate, Hyundai Green Power Co., Ltd., as other derivatives assets and liabilities. Also, the fair value of derivatives under the power purchase agreement of the subsidiary, Elara Energy Project, LLC, has been recognized as other derivative liabilities.

(*3)

The Group recorded the fair value of derivatives regarding the Power Purchase Agreement (“PPA”) of its subsidiary Columboola Solar Farm Hold Co Pty., Ltd. as other derivative assets.

(*4)

The Group recorded the fair value of derivatives in accordance with the shareholders’ agreement of its joint venture, Wadi Noor Solar Power, as other derivative liabilities.

36


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives, Continued

(2)

Currency forward contracts which are not designated as hedging instruments as of June 30, 2026 are as follows:

In millions of won and thousands of foreign currencies except contract exchange rate information

Counterparty

Contract
date
Maturity
date
Contract amounts Contract
exchange rate

(in won)
Pay Receive

JP Morgan

2026.06.18 2026.07.16 W 15,230 USD 10,000 W 1,522.95

Nonghyup Bank

2026.06.15 2026.07.09 12,048 USD 8,000 1,506.05

Nonghyup Bank

2026.06.26 2026.07.21 15,457 USD 10,000 1,545.70

Morgan Stanley

2026.06.17 2026.07.14 15,124 USD 10,000 1,512.40

Mizuho Bank

2026.06.26 2026.07.23 15,492 USD 10,000 1,549.20

Shinhan Bank

2026.06.16 2026.07.10 15,125 USD 10,000 1,512.50

Woori Bank

2026.06.26 2026.07.20 15,459 USD 10,000 1,545.85

MUFG

2026.06.11 2026.07.07 15,262 USD 10,000 1,526.20

Kookmin Bank

2026.06.11 2026.07.07 15,263 USD 10,000 1,526.30

Mizuho Bank

2026.06.11 2026.07.07 15,264 USD 10,000 1,526.40

Korea Development Bank

2026.06.16 2026.07.07 13,615 USD 9,000 1,512.78

MUFG

2026.06.16 2026.07.07 12,103 USD 8,000 1,512.90

JP Morgan

2026.06.16 2026.07.07 12,104 USD 8,000 1,513.05

Korea Development Bank

2026.06.29 2026.07.23 10,791 USD 7,000 1,541.62

Deutsche Bank

2026.06.29 2026.07.23 10,793 USD 7,000 1,541.84

MUFG

2026.04.23 2026.07.01 USD 16,826 24,834 1,475.90

MUFG

2026.05.19 2026.07.01 USD 500 753 1,505.80

Nonghyup Bank

2026.06.15 2026.07.20 15,038 USD 10,000 1,503.80

MUFG

2026.06.29 2026.07.02 15,388 USD 10,000 1,538.83

JP Morgan

2026.06.29 2026.07.31 USD 7,452 11,433 1,534.30

MUFG

2026.06.30 2026.07.31 USD 16,826 25,943 1,541.80

MUFG

2026.06.30 2026.07.31 USD 500 771 1,541.80

Bank of America

2026.05.12 2026.07.31 USD 11,985 17,619 1,470.15

JP Morgan

2026.06.11 2026.10.30 USD 9,646 14,674 1,521.32

JP Morgan

2026.06.15 2026.07.02 66,743 USD 44,220 1,509.35

SMBC

2026.06.29 2026.07.28 10,765 USD 7,000 1,537.84

Kyongnam Bank

2026.04.01 2026.07.31 USD 34,445 51,709 1,501.20

Mizuho Bank

2026.06.08 2026.07.07 7,707 USD 5,000 1,541.40

Mizuho Bank

2026.06.29 2026.07.28 10,779 USD 7,000 1,539.85

Busan Bank

2026.06.01 2026.07.07 7,524 USD 5,000 1,504.70

Busan Bank

2026.06.08 2026.07.07 10,835 USD 7,000 1,547.90

Shinhan Bank

2026.06.08 2026.07.07 6,132 USD 4,000 1,533.00

Hana Bank

2026.06.08 2026.07.07 7,768 USD 5,000 1,553.55

MUFG

2026.06.08 2026.09.09 10,750 USD 7,000 1,535.75

Woori Bank

2026.06.26 2026.10.08 4,094 USD 2,670 1,533.50

Shinhan Bank

2026.06.26 2026.09.28 7,668 USD 5,000 1,533.57

Hana Bank

2026.06.26 2026.10.08 7,671 USD 5,000 1,534.19

MUFG

2026.06.29 2026.09.28 9,248 USD 6,000 1,541.40
(3)

Currency swap contracts which are not designated as hedging instruments as of June 30, 2026 are as follows:

In millions of won and thousands of foreign currencies except contract exchange rate information

Counterparty

Contract year Contract amount Contract interest rate Contract
exchange rate

(in won)
Pay Receive Pay Receive

Standard Chartered

2014~2029 W   102,470 USD 100,000        3.14 %        3.57 % W   1,024.70

Woori Bank

2019~2027 21,708 USD  19,417 5.04 % 6.75 % 1,118.00

Kookmin Bank

2020~2026 76,355 USD  70,445 5.83 % 6.00 % 1,083.90

Woori Bank

2021~2026 118,170 USD 100,000 1.11 % 1.13 % 1,181.70

Korea Development Bank

2021~2026 118,170 USD 100,000 1.11 % 1.13 % 1,181.70

Hana Bank

2021~2026 118,170 USD 100,000 1.11 % 1.13 % 1,181.70

JP Morgan

2022~2027 128,600 USD 100,000 3.56 % 4.00 % 1,286.00

Woori Bank

2022~2027 128,600 USD 100,000 3.56 % 4.00 % 1,286.00

Kookmin Bank

2022~2027 128,600 USD 100,000 3.56 % 4.00 % 1,286.00

Korea Development Bank

2022~2028 283,820 USD 200,000 5.12 % 5.50 % 1,419.10

Woori Bank

2022~2028 141,910 USD 100,000 5.13 % 5.50 % 1,419.10

Hana Bank

2023~2026 256,000 USD 200,000 3.97 % 5.38 % 1,280.00

Shinhan Bank

2023~2026 192,000 USD 150,000 3.99 % 5.38 % 1,280.00

37


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives, Continued

(3)

Currency swap contracts which are not designated as hedging instruments as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies except contract exchange rate information

Counterparty

Contract year Contract amount Contract interest rate Contract
exchange rate

(in won)
Pay Receive Pay Receive

Kookmin Bank

2023~2026 W   128,000 USD 100,000        4.03 %        5.38 % W   1,280.00

Korea Development Bank

2023~2026 256,000 USD 200,000 4.04 % 5.38 % 1,280.00

Bank of America

2023~2026 128,000 USD 100,000 4.04 % 5.38 % 1,280.00

Standard Chartered

2023~2026 128,000 USD 100,000 4.04 % 5.38 % 1,280.00

Woori Bank

2023~2026 192,000 USD 150,000 4.05 % 5.38 % 1,280.00

Shinhan Bank

2024~2027 133,060 USD 100,000 3.53 % 4.88 % 1,330.60

Kookmin Bank

2024~2027 133,060 USD 100,000 3.53 % 4.88 % 1,330.60

Korea Development Bank

2024~2027 864,890 USD 650,000 3.53 % 4.88 % 1,330.60

Bank of America

2024~2027 133,060 USD 100,000 3.53 % 4.88 % 1,330.60

Standard Chartered

2024~2027 133,060 USD 100,000 3.53 % 4.88 % 1,330.60

IBK Securities Co., Ltd.

2024~2027 199,590 USD 150,000 3.53 % 4.88 % 1,330.60

Shinhan Bank

2024~2034 138,010 USD 100,000 3.64 % 5.13 % 1,380.10

Hana Bank

2024~2034 138,010 USD 100,000 3.69 % 5.13 % 1,380.10

Woori Bank

2024~2034 119,958 USD  86,920 3.74 % 5.13 % 1,380.10

Kookmin Bank

2025~2028 292,640 USD 200,000 2.99 % Compounded Daily SOFR + 0.62 % 1,463.20

Bank of America

2025~2028 219,480 USD 150,000 2.99 % Compounded Daily SOFR + 0.62 % 1,463.20

Hana Bank

2025~2028 146,320 USD 100,000 3.00 % Compounded Daily SOFR + 0.62 % 1,463.20

Korea Development Bank

2025~2028 73,160 USD  50,000 3.02 % Compounded Daily SOFR + 0.62 % 1,463.20

Shinhan Bank

2025~2028 146,320 USD 100,000 3.02 % Compounded Daily SOFR + 0.62 % 1,463.20

Shinhan Bank

2025~2030 146,320 USD 100,000 3.18 % 4.13 % 1,463.20

Hana Bank

2025~2030 438,960 USD 300,000 3.21 % 4.13 % 1,463.20

Woori Bank

2017~2027 111,610 USD 100,000 2.25 % 3.13 % 1,116.10

Korea Development Bank

2017~2027 111,610 USD 100,000 2.31 % 3.13 % 1,116.10

Hana Bank

2017~2027 111,610 USD 100,000 2.31 % 3.13 % 1,116.10

Korea Development Bank

2018~2028 108,600 HKD 800,000 2.69 % 3.35 % 135.75

Shinhan Bank

2018~2028 115,387 HKD 850,000 2.66 % 3.35 % 135.75

Korea Development Bank

2019~2027 119,978 CHF 100,000 1.43 % 0.05 % 1,199.78

38


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives, Continued

(3)

Currency swap contracts which are not designated as hedging instruments as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies except contract exchange rate information

Counterparty

Contract year Contract amount Contract interest rate Contract
exchange rate
(in won)
Pay Receive Pay Receive

Woori Bank

2022~2027 W   262,000 USD 200,000        3.62 %        4.25 % W   1,310.00

Export-Import Bank of Korea

2022~2027 131,000 USD 100,000 3.63 % 4.25 % 1,310.00

Kookmin Bank

2022~2027 131,000 USD 100,000 3.62 % 4.25 % 1,310.00

Hana Bank

2022~2027 131,000 USD 100,000 3.61 % 4.25 % 1,310.00

Korea Development Bank

2022~2027 262,000 USD 200,000 3.63 % 4.25 % 1,310.00

Export-Import Bank of Korea

2022~2032 349,829 HKD 1,935,000 4.87 % 5.16 % 180.79

JP Morgan

2022~2032 75,194 HKD 415,000 5.00 % 5.16 % 181.19

Export-Import Bank of Korea

2023~2030 172,982 HKD 1,037,000 4.25 % 4.51 % 166.81

Hana Bank

2024~2028 128,940 USD 100,000 3.73 % 5.00 % 1,289.40

JP Morgan

2024~2028 128,940 USD 100,000 3.85 % 5.00 % 1,289.40

Korea Development Bank

2024~2028 257,880 USD 200,000 3.80 % 5.00 % 1,289.40

Korea Development Bank

2024~2028 128,940 USD 100,000 3.69 % 5.00 % 1,289.40

Hana Bank

2024~2029 138,540 USD 100,000 3.15 % 4.63 % 1,385.40

Shinhan Bank

2024~2029 138,540 USD 100,000 3.15 % 4.63 % 1,385.40

Kookmin Bank

2024~2029 138,540 USD 100,000 3.16 % 4.63 % 1,385.40

Woori Bank

2024~2029 138,540 USD 100,000 3.17 % 4.63 % 1,385.40

Korea Development Bank

2024~2029 138,540 USD 100,000 3.19 % 4.63 % 1,385.40

Credit Agricole

2025~2028 218,963 HKD 1,166,000 2.85 % 4.10 % 187.79

Korea Development Bank

2025~2030 556,560 USD 400,000 2.75 % SOFR + 0.79 % 1,391.40

Hana Bank

2025~2030 139,140 USD 100,000 2.76 % SOFR + 0.79 % 1,391.40

Kookmin Bank

2026~2031 302,000 USD 200,000 4.08 % 4.50 % 1,510.00

Hana Bank

2026~2031 151,000 USD 100,000 4.08 % 4.50 % 1,510.00

Korea Development Bank

2026~2031 302,000 USD 200,000 4.09 % 4.50 % 1,510.00

39


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives, Continued

(4)

Currency swap contracts which are designated as hedging instruments as of June 30, 2026 are as follows:

In millions of won and thousands of foreign currencies except contract exchange rate information

Counterparty

Contract year Contract amount Contract interest rate Contract
exchange rate

(in won)
Pay Receive Pay Receive

Nomura

2017~2037 W   52,457 EUR 40,000        2.60 %        1.70 %   1,311.42

Nomura

2017~2037 59,423 SEK 450,000 2.62 % 2.36 % 132.05

Kookmin Bank

2021~2026 114,230 USD   100,000 1.27 % 1.25 % 1,142.30

Korea Development Bank

2021~2026 114,230 USD 100,000 1.27 % 1.25 % 1,142.30

Hana Bank

2021~2026 114,230 USD 100,000 1.27 % 1.25 % 1,142.30

Korea Development Bank

2022~2027 123,710 USD 100,000 3.41 % 3.63 % 1,237.10

Woori Bank

2022~2027 123,710 USD 100,000 3.41 % 3.63 % 1,237.10

JP Morgan

2022~2027 123,710 USD 100,000 3.41 % 3.63 % 1,237.10

Shinhan Bank

2023~2026 132,930 USD 100,000 4.07 % 5.38 % 1,329.30

Nonghyup Bank

2023~2026 132,930 USD 100,000 4.05 % 5.38 % 1,329.30

Kookmin Bank

2023~2026 132,930 USD 100,000 4.07 % 5.38 % 1,329.30

Woori Bank

2023~2028 259,000 USD 200,000 3.83 % 4.88 % 1,295.00

Korea Development Bank

2023~2028 129,500 USD 100,000 3.85 % 4.88 % 1,295.00

Bank of America

2023~2028 64,750 USD 50,000 3.85 % 4.88 % 1,295.00

Woori Bank

2025~2031 142,900 USD 100,000 2.93 % 4.00 % 1,429.00

Hana Bank

2025~2031 142,900 USD 100,000 2.93 % 4.00 % 1,429.00

Shinhan Bank

2025~2031 71,450 USD 50,000 2.94 % 4.00 % 1,429.00

Bank of America

2025~2031 71,450 USD 50,000 2.94 % 4.00 % 1,429.00

40


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives, Continued

(5)

Interest rate swap contracts which are not designated as hedging instruments as of June 30, 2026 are as follows:

In millions of won and thousands of foreign currencies

Counterparty

Contract
year
Contract amount Contract interest rate per annum
Pay Receive

Nomura (*1)

2018~2038 W 30,000 3M CD + 0.10 % 3.75 %

Hana Bank

2022~2027 200,000 3.02% 3M CD + 0.61 %

Hana Bank

2022~2027 200,000 3.04% 3M CD + 0.58 %

Hana Bank

2022~2027 250,000 3.38% 3M CD + 0.59 %

Nomura

2022~2027 200,000 3.55% 3M CD + 0.60 %

Shinhan Bank

2022~2027 150,000 3.53% 3M CD + 0.55 %

Hana Bank

2022~2027 200,000 3.70% 3M CD + 0.59 %

Nomura

2022~2027 300,000 3.89% 3M CD + 0.67 %

Hana Bank

2022~2027 200,000 3.93% 3M CD + 0.67 %

Nomura

2022~2027 200,000 3.80% 3M CD + 0.68 %

Nomura

2022~2027 300,000 4.04% 3M CD + 0.60 %

Hana Bank

2022~2027 100,000 4.68% 3M CD + 1.04 %

Hana Bank

2022~2027 100,000 5.45% 3M CD + 1.20 %

Shinhan Bank

2023~2028 200,000 4.27% 3M CD + 0.76 %

Shinhan Bank

2023~2028 50,000 4.27% 3M CD + 0.76 %

Nomura

2023~2028 250,000 4.13% 3M CD + 0.73 %

Hana Bank

2023~2028 200,000 3.74% 3M CD + 0.51 %

Hana Bank

2023~2028 100,000 4.19% 3M CD + 0.50 %

Shinhan Bank

2023~2028 300,000 3.81% 3M CD + 0.70 %

Hana Bank

2023~2028 200,000 3.95% 3M CD + 0.50 %

Shinhan Bank

2024~2029 200,000 3.84% 3M CD + 0.50 %

Hana Bank

2024~2027 250,000 3.72% 3M CD + 0.34 %

Hana Bank

2024~2027 250,000 3.77% 3M CD + 0.31 %

Hana Bank

2024~2027 250,000 3.31% 3M CD + 0.31 %

Hana Bank

2024~2027 200,000 3.46% 3M CD + 0.53 %

Nomura

2024~2027 200,000 3.38% 3M CD + 0.50 %

Hana Bank

2024~2027 300,000 3.18% 3M CD + 0.53 %

Hana Bank

2025~2028 200,000 2.86% 3M CD + 0.45 %

Hana Bank

2025~2028 200,000 2.85% 3M CD + 0.25 %

Shinhan Bank

2025~2026 100,000 3.30% 3M CD + 0.45 %

Hana Bank

2025~2030 200,000 3.28% 3M CD + 0.57 %

Hana Bank

2025~2030 200,000 3.28% 3M CD + 0.62 %

Shinhan Bank

2025~2030 200,000 2.82% 3M CD + 0.50 %

Nomura

2017~2032 52,457 2.55% + floating rate 2.60 %

Nomura

2017~2032 59,423 2.57% + floating rate 2.62 %

Nomura (*2)

2021~2041 30,000 3M CMT + 0.35% 2.60 %

Nomura (*3)

2021~2041 50,000 3M CMT + 0.35% 2.38 %

MUFG

2022~2048 USD 155,941 3M SOFR 3.71 %

Mizuho Capital Markets LLC

2022~2048 USD  155,941 3M SOFR 1.05 %

NORD LB Bank

2022~2036 USD 16,121 1.83% 6M SOFR

Rabobank

2022~2036 USD 19,619 1.83% 6M SOFR

Mizuho Capital Markets LLC

2024~2045 USD 76,168 3M USD Synthetic Libor 1.14 %
(*1)

Depending on the counterparty exercising the right, the contract may be early settled on the same date every year from June 15, 2023.

(*2)

1.84% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT+0.35% is applied thereafter.

(*3)

1.87% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT+0.35% is applied thereafter.

41


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

12.

Derivatives, Continued

(6)

Interest rate swap contracts which are designated as hedging instruments as of June 30, 2026 are as follows:

In thousands of foreign currencies

Counterparty

Contract year Contract
amount
Contract interest rate per annum
Pay Receive

Export-Import Bank of Korea

2015~2031 USD 11,021        2.67 % SOFR + 0.43 %

ING Bank

2015~2031 USD 27,178 2.67 % SOFR + 0.43 %

BNP Paribas

2015~2031 USD 28,994 2.67 % SOFR + 0.43 %

BNP Paribas

2009~2027 USD 10,021 4.16 % 6M USD Synthetic Libor

KFW

2009~2027 USD 10,021 4.16 % 6M USD Synthetic Libor

Export-Import Bank of Korea

2016~2036 USD 48,323 3.00 % 6M USD Synthetic Libor

SMTB

2025~2036 JPY 3,431,220 1.82 % 6M TIBOR + 0.55 %
(7)

Gains and losses on valuation and transaction of derivatives for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows and they are included as finance income and expenses in the consolidated statements of comprehensive income (loss):

In millions of Won Net income effects of
valuation gain (loss)
Net income effects of
transaction gain (loss)
Accumulated other
comprehensive income (loss) (*1)
June 30, 2026 June 30, 2025 June 30, 2026 June 30, 2025 June 30, 2026 June 30, 2025
Three-
month
period

ended
Six-
month
period
ended
Three-
month
period

ended
Six-
month
period
ended
Three-
month
period

ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period

ended
Six-
month
period
ended
Three-
month
period

ended
Six-
month
period
ended

Currency forward

W (3,324 ) 721 (4,555 ) (1,221 ) 15,065 37,086 (17,438 ) (27,107 ) —  —  —  — 

Currency swap

231,867 1,113,960 (1,018,448 ) (970,626 ) 48,264 134,473 (173,221 ) (127,568 ) 8,065 23,346 147 22,721

Interest rate swap

(1,699 ) 61,272 (6,012 ) (28,515 ) (3,734 ) (9,369 ) (5,132 ) (5,924 ) 760 1,560 (1,418 ) (4,091 )

Other derivatives (*2)

—  —  —  8,355 —  —  28,094 37,583 —  —  —  — 
W 226,844 1,175,953 (1,029,015 ) (992,007 ) 59,595 162,190 (167,697 ) (123,016 ) 8,825 24,906 (1,271 ) 18,630
(*1)

For each of the six-month periods ended June 30, 2026 and 2025, the net gain on valuation of derivatives applying cash flow hedge accounting of W14,230 million and W9,469 million, net of tax, are included in other comprehensive income (loss), respectively.

(*2)

The Group entered into a Price Return Swap (PRS) contract to exchange gains or losses arising from fluctuations in the stock price of its subsidiary, KEPCO Engineering & Construction Company, Inc. The settlement of the PRS contract was completed during the year ended December 31, 2025, and in relation to this transaction, the Group recognized a gain on valuation of derivative instruments of W8,355 million and a gain on transaction of derivative instruments of W3,572 million for the six-month period ended June 30, 2025.

42


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

13.

Loans and Other Financial Instruments

(1)

Other financial assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Loans

W 265,842 891,042 101,773 992,012

Less: allowance for doubtful accounts

(5,156 ) (26,207 ) (5,191 ) (66,807 )

Less: present value discount

(866 ) (36,500 ) (984 ) (34,275 )
259,820 828,335 95,598 890,930

Long-term / short-term financial instruments

1,356,293 896,492 1,997,644 884,487
W 1,616,113 1,724,827 2,093,242 1,775,417
(2)

Loans as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Face value Allowance for
doubtful accounts
Present value
discount
Carrying value

Short-term loans

Loans for tuition

W 32,978 (5,155 ) (866 ) 26,957

Loans for housing

44,590 —  —  44,590

Other loans

188,274 (1 ) —  188,273
265,842 (5,156 ) (866 ) 259,820

Long-term loans

Loans for tuition

317,651 (930 ) (36,500 ) 280,221

Loans for housing

231,225 —  —  231,225

Loans for related parties

327,319 (25,277 ) —  302,042

Other loans

14,847 —  —  14,847
891,042 (26,207 ) (36,500 ) 828,335
W 1,156,884 (31,363 ) (37,366 ) 1,088,155
In millions of won As of December 31, 2025
Face value Allowance for
doubtful accounts
Present value
discount
Carrying value

Short-term loans

Loans for tuition

W 34,290 (5,155 ) (984 ) 28,151

Loans for housing

40,515 —  —  40,515

Other loans

26,968 (36 ) —  26,932
101,773 (5,191 ) (984 ) 95,598

Long-term loans

Loans for tuition

326,941 (983 ) (34,275 ) 291,683

Loans for housing

243,651 —  —  243,651

Loans for related parties

359,519 (24,218 ) —  335,301

Other loans

61,901 (41,606 ) —  20,295
992,012 (66,807 ) (34,275 ) 890,930
W 1,093,785 (71,998 ) (35,259 ) 986,528

43


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

13.

Loans and Other Financial Instruments, Continued

(3)

Changes in the allowance for doubtful accounts of loans for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month
period ended
June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W 71,998 71,994

Bad debts expense

1,003 (3,455 )

Write-off

(41,638 ) (447 )

Others

—  3,906

Ending balance

W 31,363 71,998
(4)

Long-term and short-term financial instruments as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Time deposits

W 985,646 117,734 1,602,572 155,487

CD

51,621 —  40,000 — 

Others

319,026 778,758 355,072 729,000
W 1,356,293 896,492 1,997,644 884,487

44


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

14.

Inventories

Inventories as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Acquisition cost Valuation allowance Book value

Raw materials

W 5,626,886 (670 ) 5,626,216

Merchandises

2,734 —  2,734

Work-in-progress

233,774 —  233,774

Finished goods

59,280 —  59,280

Supplies

3,662,780 —  3,662,780

Inventories-in-transit

1,532,452 —  1,532,452

Other inventories

22,503 —  22,503
W 11,140,409 (670 ) 11,139,739
In millions of won As of December 31, 2025
Acquisition cost Valuation allowance Book value

Raw materials

W 5,299,493 (670 ) 5,298,823

Merchandises

3,447 —  3,447

Work-in-progress

213,919 —  213,919

Finished goods

93,379 —  93,379

Supplies

3,564,892 —  3,564,892

Inventories-in-transit

962,337 —  962,337

Other inventories

15,927 —  15,927
W 10,153,394 (670 ) 10,152,724

The reversal of the allowance for loss on inventory valuation included in cost of sales for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 amounts to W4,719 million and W6,477 million, respectively. The amounts of loss from inventory valuation included in other gains or losses for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 were W4,719 million and W4,944 million, respectively.

15.

Non-Financial Assets

Non-financial assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Advanced payments

W 653,286 658,998 632,235 634,986

Prepaid expenses

467,397 207,572 416,297 236,141

Others (*1)

668,802 158,648 313,098 142,124
W 1,789,485 1,025,218 1,361,630 1,013,251
(*1)

Details of others in non-financial assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Greenhouse gas emissions rights

W 264,898 —  107,550 — 

Other quick assets

403,904 158,648 205,548 142,124
W 668,802 158,648 313,098 142,124

45


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries

(1)

Consolidated subsidiaries as of June 30, 2026 and December 31, 2025 are as follows:

Subsidiaries

Key operation activities

Location

Percentage of ownership (%)
As of June 30,
2026
As of December 31,
2025

Korea Hydro & Nuclear Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Korea South-East Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Korea Midland Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Korea Western Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Korea Southern Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Korea East-West Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

KEPCO Engineering & Construction Company, Inc. (*1)

Engineering and construction for utility plant and others Korea 51.00 % 51.00 %

KEPCO Plant Service & Engineering Co., Ltd.

Utility plant maintenance and others Korea 51.00 % 51.00 %

KEPCO Nuclear Fuel Co., Ltd.

Nuclear fuel Korea 96.36 % 96.36 %

KEPCO KDN Co., Ltd.

Electric power information technology and others Korea 100.00 % 100.00 %

KEPCO International HongKong Ltd.

Holding company Hong Kong 100.00 % 100.00 %

KEPCO International Philippines Inc.

Holding company Philippines 100.00 % 100.00 %

KEPCO Gansu International Ltd.

Holding company Hong Kong 100.00 % 100.00 %

KEPCO Philippines Holdings Inc.

Holding company Philippines 100.00 % 100.00 %

KEPCO Philippines Corporation

Operation of utility plant Philippines 100.00 % 100.00 %

KEPCO Ilijan Corporation

Construction and operation of utility plant Philippines 51.00 % 51.00 %

KEPCO Neimenggu International Ltd.

Holding company Hong Kong 100.00 % 100.00 %

KEPCO Shanxi International Ltd.

Holding company Hong Kong 100.00 % 100.00 %

KOMIPO Global Pte Ltd.

Holding company Singapore 100.00 % 100.00 %

KEPCO Netherlands B.V.

Holding company Netherlands 100.00 % 100.00 %

KEPCO Australia Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOSEP Australia Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOMIPO Australia Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOWEPO Australia Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOSPO Australia Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KEPCO Middle East Holding Company

Holding company Bahrain 100.00 % 100.00 %

Qatrana Electric Power Company

Construction and operation of utility plant Jordan 80.00 % 80.00 %

KHNP Canada Energy Ltd.

Holding company Canada 100.00 % 100.00 %

KEPCO Bylong Australia Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

Korea Waterbury Uranium Limited Partnership (*8)

Holding company Canada 83.76 % 80.82 %

KEPCO Holdings de Mexico

Holding company Mexico 100.00 % 100.00 %

KST Electric Power Company, S.A.P.I. de C.V.

Construction and operation of utility plant Mexico 56.00 % 56.00 %

KEPCO Energy Service Company

Operation of utility plant Mexico 100.00 % 100.00 %

KEPCO Netherlands S3 B.V.

Holding company Netherlands 100.00 % 100.00 %

PT. KOMIPO Pembangkitan Jawa Bali

Operation of utility plant Indonesia 51.00 % 51.00 %

PT. Cirebon Power Service (*2)

Operation of utility plant Indonesia 27.50 % 27.50 %

KOWEPO International Corporation

Operation of utility plant Philippines 99.99 % 99.99 %

KOSPO Jordan LLC

Operation of utility plant Jordan 100.00 % 100.00 %

EWP America Inc.

Holding company USA 100.00 % 100.00 %

EWP Renewable Corporation

Holding company USA 100.00 % 100.00 %

KNF Canada Energy Limited

Holding company Canada 100.00 % 100.00 %

EWP Barbados 1 SRL

Holding company Barbados 100.00 % 100.00 %

California Power Holdings, LLC

Power generation USA 100.00 % 100.00 %

Gyeonggi Green Energy Co., Ltd.

Power generation Korea 62.01 % 62.01 %

PT. Tanggamus Electric Power

Power generation Indonesia 52.50 % 52.50 %

Gyeongju Wind Power Co., Ltd. (*9)

Power generation Korea 82.40 % 70.00 %

KOMIPO America Inc.

Holding company USA 100.00 % 100.00 %

PT. EWP Indonesia

Holding company Indonesia 99.99 % 99.99 %

KEPCO Netherlands J3 B.V.

Holding company Netherlands 100.00 % 100.00 %

Korea Offshore Wind Power Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Global One Pioneer B.V.

Holding company Netherlands 100.00 % 100.00 %

Global Energy Pioneer B.V.

Holding company Netherlands 100.00 % 100.00 %

Mira Power Limited (*3)

Power generation Pakistan 76.00 % 76.00 %

KOSEP Material Co., Ltd.

Recycling fly ashes Korea 86.22 % 86.22 %

46


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(1)

Consolidated subsidiaries as of June 30, 2026 and December 31, 2025 are as follows, continued:

Subsidiaries

Key operation activities

Location

Percentage of ownership (%)
As of June 30,
2026
As of December 31,
2025

KEPCO KPS Philippines Corp.

Utility plant maintenance and others Philippines 99.99 % 99.99 %

KOSPO Chile SpA

Holding company Chile 100.00 % 100.00 %

Hee Mang Sunlight Power Co., Ltd.

Operation of utility plant Korea 100.00 % 100.00 %

Fujeij Wind Power Company

Operation of utility plant Jordan 100.00 % 100.00 %

KOSPO Youngnam Power Co., Ltd.

Operation of utility plant Korea 100.00 % 100.00 %

Chitose Solar Power Plant LLC

Power generation Japan 65.00 % 65.00 %

KEPCO ES Co., Ltd.

Energy service Korea 100.00 % 100.00 %

KEPCO Solar Co., Ltd.

Power generation Korea 100.00 % 100.00 %

KOSPO Power Services Ltda.

Utility plant maintenance and others Chile 65.00 % 65.00 %

Energy New Industry Specialized Investment Private Investment Trust

Holding company Korea 99.01 % 99.01 %

KOEN Bylong Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOMIPO Bylong Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOWEPO Bylong Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOSPO Bylong Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

EWP Bylong Pty., Ltd.

Resources development Australia 100.00 % 100.00 %

KOWEPO Lao International

Utility plant maintenance and others Laos 100.00 % 100.00 %

KEPCO Mangilao Holdings LLC

Holding company USA 100.00 % 100.00 %

Mangilao Investment LLC (*5)

Holding company USA 69.21 % 69.21 %

KEPCO Mangilao Solar, LLC

Power generation USA 100.00 % 100.00 %

Jeju Hanlim Offshore Wind Co., Ltd.

Power generation Korea 79.03 % 79.03 %

PT. Siborpa Eco Power

Construction and operation of utility plant Indonesia 55.00 % 55.00 %

BSK E-New Industry Fund VII

Holding company Korea 81.67 % 81.67 %

e-New Industry LB Fund 1

Holding company Korea 76.11 % 76.11 %

Songhyun e-New Industry Fund (*7)

Holding company Korea —  80.65 %

BSK E-New Industry Fund X

Holding company Korea 66.80 % 66.80 %

PT. Korea Energy Indonesia

Utility plant maintenance and others Indonesia 95.00 % 95.00 %

KOLAT SpA

Utility plant maintenance and others Chile 100.00 % 100.00 %

KEPCO California, LLC

Holding company USA 100.00 % 100.00 %

KEPCO Mojave Holdings, LLC

Holding company USA 100.00 % 100.00 %

Incheon Fuel Cell Co., Ltd.

Power generation Korea 60.00 % 60.00 %

KOEN Service Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

KOMIPO Service Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

KOWEPO Service Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

KOSPO Service Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

EWP Service Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

PT. KOMIPO Energy Indonesia

Utility plant maintenance and others Indonesia 95.00 % 95.00 %

KNF Partners Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

KOSPO USA Inc.

Holding company USA 100.00 % 100.00 %

KOSPO Niles LLC (formerly, Nambu USA LLC)

Holding company USA 100.00 % 100.00 %

Tamra Offshore Wind Power Co., Ltd.

Power generation Korea 63.00 % 63.00 %

KEPCO MCS Co., Ltd.

Electric meter reading and others Korea 100.00 % 100.00 %

KEPCO FMS Co., Ltd.

Security service and others Korea 100.00 % 100.00 %

Firstkeepers Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

Secutec Co., Ltd.

Security service Korea 100.00 % 100.00 %

SE Green Energy Co., Ltd. (*6)

Power generation Korea 100.00 % 100.00 %

Mangilao Intermediate Holdings LLC

Holding company USA 100.00 % 100.00 %

KEPCO CSC Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

KOAK Power Limited

Hydro power facility maintenance Pakistan 100.00 % 100.00 %

KOMIPO Europe B.V.

Holding company Netherlands 100.00 % 100.00 %

Haenanum Energy Fund

Holding company Korea 99.64 % 99.64 %

Paju Ecoenergy Co., Ltd. (*6)

Power generation Korea 93.68 % 93.68 %

Guam Ukudu Power LLC

Power generation USA 100.00 % 100.00 %

K-SOLAR SHINAN Co., Ltd.

Power generation Korea 90.00 % 90.00 %

KPS Partners Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

KEPCO E&C Service Co., Ltd.

Facility maintenance and service Korea 100.00 % 100.00 %

Moha solar Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Ogiri Solar Power Co., Ltd.

Power generation Korea 70.00 % 70.00 %

KHNP USA LLC

Holding company USA 100.00 % 100.00 %

KOMIPO Vanphong Power Service LLC

Utility plant maintenance and others Vietnam 100.00 % 100.00 %

47


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(1)

Consolidated subsidiaries as of June 30, 2026 and December 31, 2025 are as follows, continued:

Subsidiaries

Key operation activities

Location

Percentage of ownership (%)
As of June 30,
2026
As of December 31,
2025

Energy Innovation Fund I

Holding company Korea 71.91 % 71.91 %

KHNP Chile SpA

Holding company Chile 100.00 % 100.00 %

Yeong Yang Apollon Photovoltaic Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Yeong Yang Corporation Co., Ltd.

Power generation Korea 100.00 % 100.00 %

SolarVader Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Yeong Yang Innovation Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Yeong Yang Horus Photovoltaic Co., Ltd.

Power generation Korea 100.00 % 100.00 %

Yeong Yang Solar Management Co., Ltd.

Power generation Korea 100.00 % 100.00 %

LSG Hydro Power Limited

Holding company Pakistan 99.99 % 99.99 %

KOEN Bio Co., Ltd.

Wood pellet utilization business Korea 70.00 % 70.00 %

KOMIPO Energy Solution America, LLC

Holding company USA 100.00 % 100.00 %

Elara Investment Holdings, LLC (*4)

Holding company USA 0.10 % 0.10 %

Elara Equity Holdings, LLC

Holding company USA 54.00 % 54.00 %

Elara Class B Holdings, LLC

Holding company USA 100.00 % 100.00 %

Elara Class B Member, LLC

Holding company USA 100.00 % 100.00 %

Elara Development Holdings, LLC

Holding company USA 100.00 % 100.00 %

KOMIPO Development, LLC

Holding company USA 100.00 % 100.00 %

Elara Energy Holdings, LLC

Holding company USA 61.62 % 61.62 %

Elara Energy Project, LLC

Power generation USA 100.00 % 100.00 %

KOMIPO Iberian Solar Group, S.L.U.

Holding company Spain 100.00 % 100.00 %

Jeongam Wind Power Co., Ltd.

Power generation Korea 80.00 % 80.00 %

KOWEPO Europe B.V.

Holding company Netherlands 100.00 % 100.00 %

CVS Equity Holdings, LLC

Holding company USA 80.96 % 80.96 %

CVS Class B Holdings, LLC

Holding company USA 100.00 % 100.00 %

CVS Development Holdings, LLC

Holding company USA 100.00 % 100.00 %

CVS Development, LLC

Holding company USA 100.00 % 100.00 %

CVS Class B Member, LLC

Holding company USA 100.00 % 100.00 %

CVS Energy Holdings, LLC

Holding company USA 62.62 % 62.62 %

Concho Valley Energy, LLC

Holding company USA 100.00 % 100.00 %

Concho Valley Solar, LLC

Power generation USA 100.00 % 100.00 %

Yeongdeok Sunrise Wind Power Co., Ltd.

Power generation Korea 70.00 % 70.00 %

UI Carbon-Neutrality Fund

Holding company Korea 78.97 % 78.97 %

KA Power Limited

Power generation Pakistan 100.00 % 100.00 %

Western Power Changgi Solar Co., Ltd.

Power generation Korea 100.00 % 100.00 %

EWP Australia Pty., Ltd.

Holding company Australia 100.00 % 100.00 %

Columboola Solar Farm Hold Co Pty., Ltd. (*3,5)

Power generation Australia 74.04 % 74.04 %

Digital Innovation Growth Fund

Holding company Korea 76.92 % 76.92 %

KEPCO Holding Company

Holding company Saudi Arabia 100.00 % 100.00 %

KEPCO for Maintenance Company

Utility plant maintenance and others Saudi Arabia 100.00 % 100.00 %

KOSPO Trumbull LLC

Holding company USA 100.00 % 100.00 %

Changjuk Wind Power Co., Ltd.

Power generation Korea 73.00 % 73.00 %

Chile Solar JV SpA

Power generation Chile 100.00 % 100.00 %

KEPCO KPS South Africa Pty., Ltd.

Utility plant maintenance and others

Republic of

South Africa

98.96 % 98.96 %

KOWEPO Holding Limited

Holding company United Arab Emirates 100.00 % 100.00 %

Magna Energy New Industrial Fund

Holding company Korea 71.30 % 71.30 %

Columboola Solar Farm Nominees Pty., Ltd. (*3)

Power generation Australia 100.00 % 100.00 %

Columboola Solar Farm Op Trust (*3)

Power generation Australia 100.00 % 100.00 %

Columboola Solar Farm Fin Co Pty., Ltd. (*3)

Holding company Australia 100.00 % 100.00 %

EWP ESS Holdings, LLC

Holding company USA 100.00 % 100.00 %

Fairhaven ESS LLC

Holding company USA 100.00 % 100.00 %

KOSPO Rutile, LLC

Holding company USA 100.00 % 100.00 %

KEPCO Yona America LLC

Holding company USA 100.00 % 100.00 %

KEPCO SADAWI – FZCO

Holding company United Arab Emirates 100.00 % 100.00 %

EWP Yona America LLC

Holding company USA 100.00 % 100.00 %

KOMIPO Middle East Energy L.L.C-FZ

Holding company United Arab Emirates 100.00 % 100.00 %

Nuclear Energy Industry Growth Fund II

Holding company Korea 99.99 % 99.99 %

UI Carbon-Neutrality Fund II

Holding company Korea 79.80 % — 

48


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(1)

Consolidated subsidiaries as of June 30, 2026 and December 31, 2025 are as follows, continued:

(*1)

Considering treasury stocks, the effective percentage of ownership is 51.24%.

(*2)

The effective percentage of ownership is less than 50%. However, this subsidiary is included in the condensed consolidated financial statements as the Group obtained the majority of the voting power under the shareholders’ agreement.

(*3)

As of June 30, 2026, the annual reporting period of all subsidiaries ends on December 31, except for Mira Power Limited, Columboola Solar Farm Hold Co Pty., Ltd., Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust and Columboola Solar Farm Fin Co Pty., Ltd.

(*4)

The effective percentage of ownership is less than 50%. However, this subsidiary is included in the condensed consolidated financial statements as the Group has control over the board of directors under the shareholders’ agreement.

(*5)

Excluding preferred stocks, the percentage of ownership with voting rights is 100%.

(*6)

The ownership interest changed due to a disproportionate capital reduction with consideration during the year ended December 31, 2025.

(*7)

This entity was liquidated during the six-month period ended June 30, 2026.

(*8)

The ownership interest changed due to a disproportionate paid-in capital increase during the six-month period ended June 30, 2026.

(*9)

The ownership interest changed due to a disproportionate capital reduction with consideration during the six-month period ended June 30, 2026.

(2)

Subsidiaries newly included in the scope of consolidation and subsidiaries excluded from the scope of consolidation during the six-month period ended June 30, 2026 are as follows:

<Subsidiaries included in consolidation during the six-month period ended June 30, 2026>

Subsidiaries

Reason

UI Carbon-Neutrality Fund II

New investment

<Subsidiaries excluded from consolidation during the six-month period ended June 30, 2026>

Subsidiaries

Reason

Songhyun e-New Industry Fund

Liquidation

49


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows:

In millions of won

As of and for the six-month period ended June 30, 2026

Subsidiaries

Total
assets
Total
liabilities
Sales Profit (loss)
for the period

Korea Hydro & Nuclear Power Co., Ltd.

W 78,653,448 50,835,377 8,151,625 2,055,129

Korea South-East Power Co., Ltd.

12,307,538 6,863,341 2,948,417 (58,648 )

Korea Midland Power Co., Ltd.

13,926,199 9,659,984 2,600,670 (164,394 )

Korea Western Power Co., Ltd.

12,929,653 8,440,345 2,760,959 (53,668 )

Korea Southern Power Co., Ltd.

12,465,199 7,327,153 2,612,025 (8,448 )

Korea East-West Power Co., Ltd.

12,052,591 6,298,249 2,556,817 56,420

KEPCO Engineering & Construction Company, Inc.

791,895 199,185 216,618 16,829

KEPCO Plant Service & Engineering Co., Ltd.

1,668,619 331,974 770,089 67,138

KEPCO Nuclear Fuel Co., Ltd.

1,073,998 551,699 255,697 30,536

KEPCO KDN Co., Ltd.

753,821 228,401 361,597 12,626

KEPCO International HongKong Ltd.

158,515 —  —  3,712

KEPCO International Philippines Inc.

14,586 —  —  203

KEPCO Gansu International Ltd.

7,739 429 —  661

KEPCO Philippines Holdings Inc.

201,481 1,062 —  11,698

KEPCO Philippines Corporation

3,143 —  —  59

KEPCO Ilijan Corporation

32,867 290 —  (377 )

KEPCO Neimenggu International Ltd.

251,205 867 —  12,835

KEPCO Shanxi International Ltd.

865,342 365,736 —  35,755

KOMIPO Global Pte Ltd.

432,393 2,669 —  10,323

KEPCO Netherlands B.V.

154,249 100 —  (44 )

KEPCO Australia Pty., Ltd.

365 163 —  (35 )

KOSEP Australia Pty., Ltd.

61,631 2,386 —  (311 )

KOMIPO Australia Pty., Ltd.

61,508 4,914 12,922 (2,680 )

KOWEPO Australia Pty., Ltd.

51,823 16 —  1,668

KOSPO Australia Pty., Ltd.

42,266 16 —  1,518

KEPCO Middle East Holding Company

150,605 155,736 —  (2,692 )

Qatrana Electric Power Company

549,514 151,686 15,632 12,277

KHNP Canada Energy Ltd.

300,364 31,105 —  94

KEPCO Bylong Australia Pty., Ltd.

52,430 618,139 —  3,721

Korea Waterbury Uranium Limited Partnership

25,005 91 —  (66 )

KEPCO Holdings de Mexico

577 3,457 —  21

KST Electric Power Company, S.A.P.I. de C.V.

674,624 526,679 46,990 6,077

KEPCO Energy Service Company

3,600 1,865 6,600 552

KEPCO Netherlands S3 B.V.

57,847 167 —  673

PT. KOMIPO Pembangkitan Jawa Bali

22,693 3,876 14,572 5,199

PT. Cirebon Power Service

4,120 1,124 5,369 47

KOWEPO International Corporation

—  11 —  — 

KOSPO Jordan LLC

36,508 13,789 24,087 5,307

EWP America Inc. (*1)

72,920 3,129 13,717 8,144

KNF Canada Energy Limited

2,627 43 —  (34 )

EWP Barbados 1 SRL

533,443 369 —  17,921

Gyeonggi Green Energy Co., Ltd.

264,604 344,961 52,957 (9,946 )

PT. Tanggamus Electric Power

224,686 129,348 4,101 5,291

Gyeongju Wind Power Co., Ltd.

76,144 30,538 9,115 1,448

KOMIPO America Inc. (*2)

618,695 288,813 8,701 4,681

PT. EWP Indonesia

110,931 15 —  4,040

KEPCO Netherlands J3 B.V.

171,660 6,019 —  29,304

Korea Offshore Wind Power Co., Ltd.

341,324 127,088 17,553 804

Global One Pioneer B.V.

1,887,457 136 —  35,598

Global Energy Pioneer B.V.

566 92 —  (55 )

Mira Power Limited

435,552 265,419 1,265 16,326

KOSEP Material Co., Ltd.

7,525 577 2,075 75

KEPCO KPS Philippines Corp.

7,176 1,621 1,201 (1,171 )

KOSPO Chile SpA

207,967 96,007 —  (981 )

50


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the six-month period ended June 30, 2026

Subsidiaries

Total
assets
Total
liabilities
Sales Profit (loss)
for the period

Hee Mang Sunlight Power Co., Ltd.

W 5,935 2,331 286 45

Fujeij Wind Power Company

243,819 151,938 —  10,825

KOSPO Youngnam Power Co., Ltd.

326,979 213,247 169,608 5,627

Chitose Solar Power Plant LLC

87,552 78,521 7,509 1,321

KEPCO ES Co., Ltd.

336,425 23,454 4,781 3,228

KEPCO Solar Co., Ltd.

245,921 30,278 12,914 4,832

KOSPO Power Services Ltda.

13,618 9,484 9,329 1,694

Energy New Industry Specialized Investment Private

Investment Trust (*3)

481,805 10,273 12,324 (16,120 )

KOEN Bylong Pty., Ltd.

20 223 —  — 

KOMIPO Bylong Pty., Ltd.

20 226 —  (7 )

KOWEPO Bylong Pty., Ltd.

20 225 —  — 

KOSPO Bylong Pty., Ltd.

12 341 —  (41 )

EWP Bylong Pty., Ltd.

19 23 —  — 

KOWEPO Lao International

14,980 1,031 6,332 2,725

KEPCO Mangilao Holdings LLC

104,122 53,539 438 (218 )

Mangilao Investment LLC

218,705 13,968 —  6,846

KEPCO Mangilao Solar, LLC

235,531 10,142 8,952 1,712

Jeju Hanlim Offshore Wind Co., Ltd.

634,797 556,873 36,379 1,869

PT. Siborpa Eco Power

21,652 7,204 —  (33 )

PT. Korea Energy Indonesia

14,385 5,686 8,883 4,330

KOLAT SpA

56,485 374 1,690 342

KEPCO California, LLC

54,222 7,859 355 (419 )

KEPCO Mojave Holdings, LLC

101,505 94,905 —  (2,407 )

Incheon Fuel Cell Co., Ltd.

213,329 223,727 33,927 (5,963 )

KOEN Service Co., Ltd.

9,431 5,325 20,127 461

KOMIPO Service Co., Ltd.

12,230 5,575 22,071 1,591

KOWEPO Service Co., Ltd.

10,635 6,302 23,834 903

KOSPO Service Co., Ltd.

9,015 4,960 17,930 899

EWP Service Co., Ltd.

7,362 4,216 15,460 692

PT. KOMIPO Energy Indonesia

5,589 131 2,570 1,180

KNF Partners Co., Ltd.

3,008 902 3,335 104

KOSPO USA Inc.

937,726 21,748 —  (319 )

KOSPO Niles LLC (formerly, Nambu USA LLC)

346,221 1,205 48 125,028

Tamra Offshore Wind Power Co., Ltd.

103,251 59,749 9,539 2,167

KEPCO MCS Co., Ltd.

55,257 57,334 128,494 (9,085 )

KEPCO FMS Co., Ltd.

25,025 22,286 58,127 318

Firstkeepers Co., Ltd.

32,608 16,811 53,759 1,971

Secutec Co., Ltd.

20,957 12,793 41,422 330

SE Green Energy Co., Ltd.

111,361 83,266 19,392 2

Mangilao Intermediate Holdings LLC

223,664 126,443 —  (2,229 )

KEPCO CSC Co., Ltd.

19,133 10,095 23,254 1,385

KOAK Power Limited

17,384 259 —  (142 )

KOMIPO Europe B.V.

97,247 133 351 2,129

Hangang Haenanum Seobu Power Energy Private Special Asset Investment Trust (Haenanum Energy Fund)

7,464 3 594 575

Paju Ecoenergy Co., Ltd.

47,655 2,811 6,423 (1,141 )

Guam Ukudu Power LLC

992,895 871,340 22,083 (25,395 )

K-SOLAR SHINAN Co., Ltd.

263,504 243,363 18,592 2,522

KPS Partners Co., Ltd.

5,085 2,589 7,820 474

KEPCO E&C Service Co., Ltd.

10,619 1,865 8,945 639

51


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the six-month period ended June 30, 2026

Subsidiaries

Total
assets
Total
liabilities
Sales Profit (loss)
for the period

Moha solar Co., Ltd.

W 24,332 25,668 —  20

Ogiri Solar Power Co., Ltd.

1,035 21 —  (17 )

KHNP USA LLC

61,425 373 649 122

KOMIPO Vanphong Power Service LLC

44,252 2,229 18,942 9,065

Energy Innovation Fund I

41,035 2,325 —  (467 )

KHNP Chile SpA

4,953 3,665 —  81

Yeong Yang Apollon Photovoltaic Co., Ltd.

1,389 1,193 100 54

Yeong Yang Corporation Co., Ltd.

1,365 1,183 98 52

SolarVader Co., Ltd.

1,378 1,186 100 54

Yeong Yang Innovation Co., Ltd.

1,359 1,183 94 47

Yeong Yang Horus Photovoltaic Co., Ltd.

1,337 1,183 90 45

Yeong Yang Solar Management Co., Ltd.

1,389 1,186 102 57

LSG Hydro Power Limited

298 3 —  (75 )

KOEN Bio Co., Ltd.

1,983 1,468 1,261 69

KOMIPO Iberian Solar Group, S.L.U.

89,739 78,716 —  4,207

Jeongam Wind Power Co., Ltd.

66,229 57,266 4,290 (555 )

KOWEPO Europe B.V.

32 4,302 —  (105 )

Yeongdeok Sunrise Wind Power Co., Ltd.

107,989 83,548 7,229 1,368

KA Power Limited

6,760 3,471 —  (78 )

Western Power Changgi Solar Co., Ltd.

38,900 31,155 4,385 1,399

EWP Australia Pty., Ltd.

57,844 768 491 (2,182 )

Columboola Solar Farm Hold Co Pty., Ltd. (*4)

382,846 276,319 9,777 (2,584 )

Digital Innovation Growth Fund

8,173 77 —  (1,195 )

KEPCO Holding Company

103,221 95,015 —  (668 )

KEPCO for Maintenance Company

5,390 10,070 3,292 444

KOSPO Trumbull LLC

501,448 56 —  (13 )

Changjuk Wind Power Co., Ltd.

27,494 2,575 3,232 2,143

Chile Solar JV SpA

90,362 75,216 5,004 (1,007 )

KEPCO KPS South Africa Pty., Ltd.

17,553 9,481 20,911 (1,521 )

KOWEPO Holding Limited

61,108 39,710 —  (89 )

KOSPO Rutile, LLC

55,691 388 979 1,120

KEPCO Yona America LLC

—  —  —  — 

KEPCO SADAWI – FZCO

201 7 —  (179 )

EWP Yona America LLC

—  1 —  (1 )

KOMIPO Middle East Energy L.L.C-FZ

1,425 420 —  (11 )

Nuclear Energy Industry Growth Fund II

14,040 50 —  (8 )
(*1)

Financial information of EWP America Inc. includes that of 4 other subsidiaries, EWP Renewable Corporation, California Power Holdings LLC, EWP ESS Holdings, LLC, and Fairhaven ESS LLC.

(*2)

Financial information of KOMIPO America Inc. includes that of 17 other subsidiaries including Elara Equity Holdings, LLC and CVS Equity Holdings, LLC.

(*3)

Financial information of Energy New Industry Specialized Investment Private Investment Trust includes that of 6 other subsidiaries, BSK E-New Industry Fund VII, e-New Industry LB Fund 1, UI Carbon-Neutrality Fund II, BSK E-New Industry Fund X, UI Carbon-Neutrality Fund, and Magna Energy New Industrial Fund.

(*4)

Financial information of Columboola Solar Farm Hold Co Pty., Ltd. includes that of 3 other subsidiaries including Columboola Solar Farm Nominees Pty., Ltd.

52


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the year ended December 31, 2025

Subsidiaries

Total assets Total
liabilities
Sales Profit (loss)
for the period

Korea Hydro & Nuclear Power Co., Ltd.

W 76,378,365 49,741,461 15,346,722 1,579,701

Korea South-East Power Co., Ltd.

12,476,339 6,456,780 6,509,651 290,916

Korea Midland Power Co., Ltd.

13,811,313 8,879,106 5,652,535 253,721

Korea Western Power Co., Ltd.

12,912,790 7,923,730 5,464,991 140,365

Korea Southern Power Co., Ltd.

12,392,402 6,686,458 6,100,647 338,992

Korea East-West Power Co., Ltd.

11,759,627 5,449,839 4,983,146 433,932

KEPCO Engineering & Construction Company, Inc.

883,518 258,552 518,768 85,368

KEPCO Plant Service & Engineering Co., Ltd.

1,687,760 350,731 1,545,256 123,796

KEPCO Nuclear Fuel Co., Ltd.

1,077,308 558,433 488,251 50,601

KEPCO KDN Co., Ltd.

721,868 178,913 773,511 54,656

KEPCO International HongKong Ltd.

143,964 —  —  6,256

KEPCO International Philippines Inc.

13,382 1 —  64

KEPCO Gansu International Ltd.

8,347 1,046 —  (58 )

KEPCO Philippines Holdings Inc.

224,385 321 —  63,550

KEPCO Philippines Corporation

2,987 4 —  120

KEPCO Ilijan Corporation

30,998 201 —  (2,228 )

KEPCO Neimenggu International Ltd.

220,764 119 —  (266 )

KEPCO Shanxi International Ltd.

779,800 350,253 —  (5,502 )

KOMIPO Global Pte Ltd.

393,031 3,992 —  9,259

KEPCO Netherlands B.V.

143,789 57 —  2,936

KEPCO Australia Pty., Ltd.

389 174 —  (22 )

KOSEP Australia Pty., Ltd.

57,023 1,117 19,672 7,192

KOMIPO Australia Pty., Ltd.

58,960 5,264 25,387 9,358

KOWEPO Australia Pty., Ltd.

100,454 38 17,109 4,864

KOSPO Australia Pty., Ltd.

42,150 5,311 17,109 3,666

KEPCO Middle East Holding Company

138,608 138,829 —  (7,010 )

Qatrana Electric Power Company

528,581 170,136 30,432 22,596

KHNP Canada Energy Ltd.

247,213 24,175 —  316

KEPCO Bylong Australia Pty., Ltd.

47,486 562,939 —  17,442

Korea Waterbury Uranium Limited Partnership

25,002 64 —  (122 )

KEPCO Holdings de Mexico

1,366 3,986 —  154

KST Electric Power Company, S.A.P.I. de C.V.

629,930 498,093 91,552 16,287

KEPCO Energy Service Company

4,733 3,683 15,711 328

KEPCO Netherlands S3 B.V.

77,919 18,595 —  1,706

PT. KOMIPO Pembangkitan Jawa Bali

17,032 3,540 21,982 1,074

PT. Cirebon Power Service

3,724 980 10,612 674

KOWEPO International Corporation

—  11 —  — 

KOSPO Jordan LLC

43,705 26,213 14,446 3,446

EWP America Inc. (*1)

60,246 2,993 25,064 11,990

KNF Canada Energy Limited

2,445 32 —  (70 )

EWP Barbados 1 SRL

479,658 777 —  17,314

Gyeonggi Green Energy Co., Ltd.

236,006 306,417 71,149 (3,822 )

PT. Tanggamus Electric Power

213,263 129,988 3,876 7,737

Gyeongju Wind Power Co., Ltd.

84,225 33,877 16,636 3,889

KOMIPO America Inc. (*2)

594,895 286,998 25,586 14,841

PT. EWP Indonesia

103,086 48 —  7,007

KEPCO Netherlands J3 B.V.

173,301 19,880 —  (1,183 )

Korea Offshore Wind Power Co., Ltd.

342,516 129,083 43,562 8,209

Global One Pioneer B.V.

1,755,583 99 —  (261 )

Global Energy Pioneer B.V.

398 99 —  (184 )

Mira Power Limited

404,476 262,983 2,651 33,464

KOSEP Material Co., Ltd.

7,596 555 5,453 1,583

KEPCO KPS Philippines Corp.

7,853 1,326 8,123 967

KOSPO Chile SpA

191,746 86,580 —  5,074

53


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the year ended December 31, 2025

Subsidiaries

Total
assets
Total
liabilities
Sales Profit (loss)
for the period

Hee Mang Sunlight Power Co., Ltd.

W 5,882 2,323 559 39

Fujeij Wind Power Company

232,988 146,500 —  15,343

KOSPO Youngnam Power Co., Ltd.

330,664 220,060 315,616 3,322

Chitose Solar Power Plant LLC

84,332 77,481 15,122 2,674

KEPCO ES Co., Ltd.

336,045 23,142 9,516 6,320

KEPCO Solar Co., Ltd.

243,087 28,763 23,412 7,023

KOSPO Power Services Ltda.

12,674 10,361 16,919 403

Energy New Industry Specialized Investment Private Investment Trust (*3)

543,694 5,879 —  49,341

KOEN Bylong Pty., Ltd.

17 201 —  (18 )

KOMIPO Bylong Pty., Ltd.

18 197 —  (8 )

KOWEPO Bylong Pty., Ltd.

18 203 —  (24 )

KOSPO Bylong Pty., Ltd.

193 453 —  (24 )

EWP Bylong Pty., Ltd.

18 21 —  (4 )

KOWEPO Lao International

21,202 1,085 12,712 5,021

KEPCO Mangilao Holdings LLC

97,123 49,828 844 1,764

Mangilao Investment LLC

208,610 19,622 —  (19,432 )

KEPCO Mangilao Solar, LLC

213,916 741 17,346 2,961

Jeju Hanlim Offshore Wind Co., Ltd.

633,525 555,268 80,467 12,289

PT. Siborpa Eco Power

17,564 4,083 —  (62 )

PT. Korea Energy Indonesia

8,462 5,142 8,227 760

KOLAT SpA

53,759 377 2,963 1,061

KEPCO California, LLC

50,809 7,248 672 (518 )

KEPCO Mojave Holdings, LLC

95,077 88,595 —  (4,491 )

Incheon Fuel Cell Co., Ltd.

212,662 217,098 75,963 (20,384 )

KOEN Service Co., Ltd.

8,055 4,959 41,138 171

KOMIPO Service Co., Ltd.

11,114 6,010 40,652 1,560

KOWEPO Service Co., Ltd.

10,223 6,762 44,485 271

KOSPO Service Co., Ltd.

7,875 4,718 34,049 593

EWP Service Co., Ltd.

7,234 4,462 29,819 1,296

PT. KOMIPO Energy Indonesia

5,855 1,616 5,425 1,421

54


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16. Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the year ended December 31, 2025

Subsidiaries

Total assets Total
liabilities
Sales Profit (loss)
for the period

KNF Partners Co., Ltd.

W 3,222 1,220 7,416 429

KOSPO USA Inc.

853,452 509 —  (5,976 )

KOSPO Niles LLC

353,430 1,077 532 33,255

Tamra Offshore Wind Power Co., Ltd.

102,795 64,577 16,720 281

KEPCO MCS Co., Ltd.

63,700 54,752 280,479 (19,492 )

KEPCO FMS Co., Ltd.

23,883 21,889 117,234 220

Firstkeepers Co., Ltd.

27,337 14,052 102,366 4,563

Secutec Co., Ltd.

18,000 12,273 81,175 431

SE Green Energy Co., Ltd.

120,726 92,633 38,335 (407 )

Mangilao Intermediate Holdings LLC

212,243 119,591 —  (8,057 )

KEPCO CSC Co., Ltd.

20,227 12,573 50,773 2,084

KOAK Power Limited

16,089 126 —  (170 )

KOMIPO Europe B.V.

91,488 89 1,214 (3,124 )

Hangang Haenanum Seobu Power Energy Private Special Asset Investment Trust (Haenanum Energy Fund)

7,416 3 951 902

Paju Ecoenergy Co., Ltd.

60,776 2,791 16,199 1,477

Guam Ukudu Power LLC

922,687 793,769 31,801 (34,266 )

K-SOLAR SHINAN Co., Ltd.

265,222 248,630 33,441 746

KPS Partners Co., Ltd.

4,300 2,422 14,787 238

KEPCO E&C Service Co., Ltd.

10,278 2,208 16,789 1,321

Moha solar Co., Ltd.

25,401 26,861 —  985

Ogiri Solar Power Co., Ltd.

1,052 21 —  (22 )

KHNP USA LLC

59,782 391 1,244 157

KOMIPO Vanphong Power Service LLC

35,596 5,201 30,289 7,091

Energy Innovation Fund I

43,596 1,194 —  (790 )

KHNP Chile SpA

4,650 3,433 —  (48 )

Yeong Yang Apollon Photovoltaic Co., Ltd.

1,379 1,237 208 44

Yeong Yang Corporation Co., Ltd.

1,356 1,227 204 40

SolarVader Co., Ltd.

1,368 1,230 206 42

Yeong Yang Innovation Co., Ltd.

1,356 1,227 200 36

Yeong Yang Horus Photovoltaic Co., Ltd.

1,337 1,228 192 28

55


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(3)

The summarized financial information of consolidated subsidiaries as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the year ended December 31, 2025

Subsidiaries

Total
assets
Total
liabilities
Sales Profit (loss)
for the period

Yeong Yang Solar Management Co., Ltd.

W 1,376 1,230 213 49

LSG Hydro Power Limited

350 4 —  (250 )

KOEN Bio Co., Ltd.

1,371 925 1,872 (35 )

KOMIPO Iberian Solar Group, S.L.U.

76,791 74,519 —  (6,552 )

Jeongam Wind Power Co., Ltd.

68,826 59,308 8,189 (1,084 )

KOWEPO Europe B.V.

51 4,036 —  (145 )

Yeongdeok Sunrise Wind Power Co., Ltd.

109,860 84,334 11,908 (617 )

KA Power Limited

6,373 3,258 —  (31 )

Western Power Changgi Solar Co., Ltd.

38,918 32,572 6,485 (109 )

EWP Australia Pty., Ltd.

54,134 461 —  (16,420 )

Columboola Solar Farm Hold Co Pty., Ltd. (*4)

348,779 247,899 12,210 (22,288 )

Digital Innovation Growth Fund

9,506 215 —  1,650

KEPCO Holding Company

201,433 197,847 —  (56 )

KEPCO for Maintenance Company

4,522 1,307 8,920 3,889

KOSPO Trumbull LLC

466,732 —  —  359

Changjuk Wind Power Co., Ltd.

25,394 2,618 6,921 657

Chile Solar JV SpA

91,608 73,301 8,079 2,419

KEPCO KPS South Africa Pty., Ltd.

18,991 10,106 30,900 1,979

KOWEPO Holding Limited

21,077 1,072 —  11,875

KOSPO Rutile, LLC

50,508 112 373 557

KEPCO Yona America LLC

—  —  —  — 

KEPCO SADAWI – FZCO

389 —  —  (83 )

EWP Yona America LLC

—  —  —  — 

KOMIPO Middle East Energy L.L.C-FZ

1,327 380 —  (7 )

Nuclear Energy Industry Growth Fund II

7,004 7 —  (3 )
(*1)

Financial information of EWP America Inc. includes that of 4 other subsidiaries, EWP Renewable Corporation, California Power Holdings LLC, EWP ESS Holdings, LLC, and Fairhaven ESS LLC.

(*2)

Financial information of KOMIPO America Inc. includes that of 17 other subsidiaries including Elara Equity Holdings, LLC and CVS Equity Holdings, LLC.

(*3)

Financial information of Energy New Industry Specialized Investment Private Investment Trust includes that of 6 other subsidiaries, BSK E-New Industry Fund VII, e-New Industry LB Fund 1, Songhyun e-New Industry Fund, BSK E-New Industry Fund X, UI Carbon-Neutrality Fund, and Magna Energy New Industrial Fund.

(*4)

Financial information of Columboola Solar Farm Hold Co Pty., Ltd. includes that of 3 other subsidiaries including Columboola Solar Farm Nominees Pty., Ltd.

56


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(4)

Significant restrictions on the Group’s abilities to its subsidiaries as of June 30, 2026 are as follows:

Company

Nature and extent of any significant restrictions

Gyeonggi Green Energy Co., Ltd.

Acquisition or disposal of assets of more than W10 billion, change in the capacity of cogeneration units (except for the change due to performance improvement of equipment, maintenance) will require unanimous consent of all directors of the entity.

KOSPO Youngnam Power Co., Ltd.

Dividends may be payable only when all conditions of the loan agreement are satisfied. The Group’s shares cannot be wholly or partially transferred without prior written consent of financial institutions.

Jeongam Wind Power Co., Ltd.

Dividends may be payable only when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Also, payments to the contracting party may be restricted depending on the financial management priority of the contract. The Group’s shares cannot be wholly or partially transferred without prior consent of other stakeholders including shareholders or financial institutions.

Incheon Fuel Cell Co., Ltd.

Acquisition or disposal of assets of more than W20 billion, change in the capacity of cogeneration units (except for the change due to performance improvement of equipment, maintenance) will require unanimous consent of all directors of the entity.

Gyeongju Wind Power Co., Ltd.

Dividends and settlement amounts for O&M and renewable energy certificate may be payable only when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained.

Korea Offshore Wind Power Co., Ltd.

Principals and interest on subordinated loans or dividends and settlement amounts for renewable energy certificate may be payable only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. The Group’s equity interest in the subsidiary may not be transferred either wholly or partially without prior written consent of financial institutions.

Jeju Hanlim Offshore Wind Co., Ltd.

Prior approval from the lender is required when withdrawing funds (major expenditure, REC settlement, dividend payment, etc.) according to the loan agreement.

Yeongdeok Sunrise Wind Power Co., Ltd.

Dividends may be payable only when all conditions of the loan agreement are satisfied.

Columboola Solar Farm Hold Co Pty., Ltd.

Dividends may be payable only when all conditions of the loan agreement are satisfied.

Guam Ukudu Power LLC

Dividends may be payable only when all conditions of the loan agreement are satisfied. Disposing or transferring assets either as a whole or as a part is restricted, and the Group’s equity interest in the subsidiary may not be transferred either wholly or partially without prior consent of other stakeholders including financial institutions.

Mira Power Limited

The Group’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders.

Chile Solar JV SpA

The Group’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders.

K-SOLAR SHINAN Co., Ltd.

Dividends may be payable only when all conditions of the loan agreement are satisfied. The Group’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders until five years have elapsed after the commencement of the operation.

Western Power Changgi Solar Co., Ltd.

Principals and interest on subordinated loans or dividends to investors are only payable when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Also, the Group’s equity interest may not be transferred either wholly or partially without prior written consent of financial institutions.

57


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(4)

Significant restrictions on the Group’s abilities to its subsidiaries as of June 30, 2026 are as follows, continued:

Company

Nature and extent of any significant restrictions

Chitose Solar Power Plant LLC

Capital expenditure may be incurred only upon prior consent of financial institutions. The issuance of securities to third parties, including current investors, is restricted, and the amount of paid-in capital cannot either increase, be written off or decrease.

Mangilao Intermediate Holdings LLC

Changes or termination of the O&M contract may not be made without the prior written consent of the majority of the lenders, and dividends can be paid only after repayment of the loan is completed.

Fujeij Wind Power Company

Incurring additional borrowings not specified in the loan agreement, or changing the PPA schedule without the lender’s prior written consent is restricted. In addition, capital acquisition and new share issuance other than dividends payment to investors are restricted.

Qatrana Electric Power Company

Dividends payment, repayment of capital investment, and settlement for O&M can only be made when all conditions of the loan agreement are satisfied and prior consent of financial institutions is obtained.

KST Electric Power Company, S.A.P.I. de C.V.

Disposal of assets exceeding $5 million per year is restricted, and the debt ratio is required to be maintained below 90%. Additionally, capital and cost expenditures that do not meet the conditions in the loan agreement are restricted.
(5)

As of June 30, 2026, the Group has following commitments unrecognized in relation to its subsidiaries as per its shareholders’ agreements:

Company

Unrecognized commitments

Jeongam Wind Power Co., Ltd.

When the Group requests other shareholders to transfer shares after the completion of the power generation complex, the Group has a right to purchase the shares at fair value.

Changjuk Wind Power Co., Ltd.

When other shareholders want to sell their shares after the performance guarantee period of wind power generators stipulated in the equipment supply contract is completed, the Group has a right to purchase the shares at fair value after consulting with the parties on the timing and size of the acquisition, taking into account financial conditions, business conditions, and other circumstances.

Columboola Solar Farm Hold Co Pty., Ltd.

The Group holds a call option to purchase the shares held by another shareholder at 80% of the stock’s valuation in the event of a breach of obligation specified in the shareholder agreement.

58


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(6)

Details of non-controlling interests prior to intra-company eliminations as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won

As of and for the six-month period ended June 30, 2026

Description

KEPCO Ilijan
Corporation
KEPCO Plant
Service &
Engineering
Co., Ltd.
KEPCO
Engineering &

Construction
Company, Inc.
Others Total

Percentage of ownership

49.00 % 49.00 % 48.76 %

Current assets

W 32,091 996,764 456,811 1,428,746 2,914,412

Non-current assets

776 671,855 335,084 4,570,361 5,578,076

Current liabilities

(290 ) (326,489 ) (195,027 ) (1,099,400 ) (1,621,206 )

Non-current liabilities

—  (5,485 ) (4,158 ) (2,600,279 ) (2,609,922 )

Net assets

32,577 1,336,645 592,710 2,299,428 4,261,360

Book value of non-controlling interests

15,963 654,956 289,006 209,459 1,169,384

Sales

—  770,089 216,618 621,754 1,608,461

Profit for the period

(377 ) 67,138 16,829 89,044 172,634

Profit for the period attributable to non-controlling interests

(185 ) 32,898 8,206 (4,427 ) 36,492

Cash flows from operating activities

(292 ) (17,927 ) (23,462 ) 472,196 430,515

Cash flows from investing activities

(2 ) 122,348 70,304 (27,353 ) 165,297

Cash flows from financing activities before dividends to non-controlling interests

—  (46,918 ) (26,749 ) (314,444 ) (388,111 )

Dividends to non-controlling interests

—  (36,405 ) (24,987 ) (1,103 ) (62,495 )

Effect of exchange rate fluctuation

2,186 1,751 102 15,312 19,351

Net increase (decrease) in cash and cash equivalents

1,892 22,849 (4,792 ) 144,608 164,557
In millions of won

As of and for the year ended December 31, 2025

Description

KEPCO Ilijan
Corporation
KEPCO Plant
Service &
Engineering
Co., Ltd.
KEPCO
Engineering &

Construction
Company, Inc.
Others Total

Percentage of ownership

49.00 % 49.00 % 48.76 %

Current assets

W 30,284 987,560 540,208 1,285,167 2,843,219

Non-current assets

714 700,200 343,310 4,508,792 5,553,016

Current liabilities

(201 ) (344,162 ) (253,981 ) (1,025,572 ) (1,623,916 )

Non-current liabilities

—  (6,569 ) (4,571 ) (2,594,928 ) (2,606,068 )

Net assets

30,797 1,337,029 624,966 2,173,459 4,166,251

Book value of non-controlling interests

15,091 655,144 304,734 178,033 1,153,002

Sales

—  1,545,256 518,768 1,157,679 3,221,703

Profit for the period

(2,228 ) 123,796 85,368 108,860 315,796

Profit for the period attributable to non-controlling interests

(1,092 ) 60,660 41,625 20,545 121,738

Cash flows from operating activities

(1,752 ) 136,753 26,999 378,589 540,589

Cash flows from investing activities

22 30,866 (7,722 ) (111,354 ) (88,188 )

Cash flows from financing activities before dividends to non-controlling interests

(24,464 ) (70,264 ) (20,479 ) (202,212 ) (317,419 )

Dividends to non-controlling interests

—  (54,441 ) (18,530 ) (9,342 ) (82,313 )

Effect of exchange rate fluctuation

(1,603 ) (670 ) (35 ) (4,794 ) (7,102 )

Net increase (decrease) in cash and cash equivalents

(27,797 ) 42,244 (19,767 ) 50,887 45,567

59


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

16.

Consolidated Subsidiaries, Continued

(7)

Changes in goodwill

(i)

Details of goodwill as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Acquisition cost

W 101,975 101,885

Less: accumulated impairment

(2,582 ) (2,582 )

Carrying book value

W 99,393 99,303
(ii)

Changes in goodwill for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning Increase Decrease Impairment Others Ending

Acquisition cost

W 101,885 —  —  —  90 101,975

Less: accumulated impairment

(2,582 ) —  —  —  —  (2,582 )

Carrying book value

W 99,303 —  —  —  90 99,393
In millions of won For the year ended December 31, 2025
Beginning Increase Decrease Impairment Others Ending

Acquisition cost

W 101,761 —  —  —  124 101,885

Less: accumulated impairment

(2,582 ) —  —  —  —  (2,582 )

Carrying book value

W 99,179 —  —  —  124 99,303
(8)

Disposals of subsidiaries

The Group completed the liquidation of Songhyun e-New Industry Fund during the six-month period ended June 30, 2026. In addition, the Group disposed of a portion of its equity interest in Commerce and Industry Energy Co., Ltd. and reclassified it from a subsidiary to an associate during the year ended December 31, 2025. Also, the Group completed the liquidation of J Wind First, LLC and Sprott Chile Solar I SpA during the year ended December 31, 2025.

60


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures

(1)

Investments in associates and joint ventures as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

As of June 30, 2026

Investees

Key operation activities

Location Percentage
of ownership
Acquisition
cost
Book
value

<Associates>

Korea Gas Corporation (*1)

Importing and wholesaling LNG

Korea 20.47 % W 94,500 2,491,023

Hyundai Green Power Co., Ltd.

Power generation equipment consignment and operation service

Korea 29.00 % 88,885 83,816

Korea Power Exchange (*2)

Management of power market and others

Korea 100.00 % 127,839 264,247

Daeryun Power Co., Ltd. (*3)

Power generation

Korea 6.85 % 46,373 36,803

SPC Power Corporation (*4)

Power generation

Philippines 38.00 % 20,635 117,455

Gemeng International Energy Co., Ltd.

Power generation

China 42.00 % 516,007 909,752

PT. Cirebon Electric Power

Power generation

Indonesia 27.50 % 40,365 177,198

PT Wampu Electric Power

Power generation

Indonesia 46.00 % 21,292 37,500

PT. Bayan Resources TBK

Resources development

Indonesia 20.00 % 615,860 720,023

S-Power Co., Ltd.

Power generation

Korea 49.00 % 132,300 209,834

Xe-Pian Xe-Namnoy Power Co., Ltd.

Power generation

Laos 25.00 % 87,426 80,452

Goseong Green Power Co., Ltd.

Power generation

Korea 29.00 % 262,740 266,316

Gangneung Eco Power Co., Ltd.

Power generation

Korea 29.00 % 261,000 228,099

Shin Pyeongtaek Power Co., Ltd. (*16)

Power generation

Korea 48.60 % 72,000 136,802

Dongducheon Dream Power Co., Ltd. (*5)

Power generation

Korea 33.61 % 148,105 104,219

GS Donghae Electric Power Co., Ltd.

Power generation

Korea 34.00 % 204,000 296,081

Nepal Water & Energy Development Company Private Limited (*6,19)

Construction and operation of utility plant

Nepal 55.67 % 110,332 193,164

Indeck Niles Development, LLC

Overseas investment business

USA 50.00 % 249,274 264,730

Saemangeum Sebit Power Plant Co., Ltd. (*7)

Power generation

Korea 55.14 % 21,037 38,657

PT. Cirebon Energi Prasarana (*8)

Power generation

Indonesia 10.00 % 26,710 105,244

Shinan-Ui Offshore Wind Power Co., Ltd. (*8)

Power generation

Korea 18.84 % 96,100 92,678

Others (Taebaek Guinemi Wind Power Co., Ltd. and 88 others)

268,218 337,991
3,510,998 7,192,084

<Joint ventures>

Shuweihat Asia Power Investment B.V.

Overseas investment business

Netherlands 49.00 % 44,405 94,616

KEPCO SPC Power Corporation (*4,10)

Construction and operation of utility plant

Philippines 60.00 % 94,579 121,337

Datang Chifeng Renewable Power Co., Ltd.

Power generation

China 40.00 % 121,928 237,991

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

Power generation

China 40.00 % 39,872 55,950

Rabigh Electricity Company (*9)

Power generation


Saudi
Arabia

40.00 % 109,743 307,832

Jamaica Public Service Company Limited

Power generation

Jamaica 40.00 % 301,910 459,688

Amman Asia Electric Power Company (*10)

Power generation

Jordan 60.00 % 111,476 277,264

Chun-cheon Energy Co., Ltd.

Power generation

Korea 29.90 % 52,700 36,669

Nghi Son 2 Power LLC

Power generation

Vietnam 50.00 % 175,261 663,795

Kelar S.A. (*14)

Power generation

Chile 65.00 % 78,060 174,581

PT. Tanjung Power Indonesia

Power generation

Indonesia 35.00 % 57,039 105,495

Barakah One Company (*11)

Power generation

UAE 18.00 % 1,794,166 1,737,112

Daegu Green Power Co., Ltd. (*12)

Power generation

Korea 29.00 % 46,225 32,962

Yeonggwang Wind Power Co., Ltd.

Power generation

Korea 46.00 % 17,475 27,958

South Jamaica Power Company Limited

Power generation

Jamaica 20.00 % 20,430 53,378

RE Holiday Holdings LLC

Power generation

USA 50.00 % 42,948 81,422

RE Pioneer Holdings LLC

Power generation

USA 50.00 % 27,891 48,958

RE Barren Ridge 1 Holdings LLC

Power generation

USA 50.00 % 28,021 55,401

Solar Philippines Calatagan Corporation

Power generation

Philippines 38.00 % 47,903 59,934

PT Barito Wahana Tenaga

Power generation

Indonesia 30.61 % 59,574 263,409

Cheongna Energy Co., Ltd. (*13)

Generating and distributing vapor and hot/cold water

Korea 50.10 % 49,344 79,437

Naepo Green Energy Co., Ltd. (*17)

Power generation

Korea 29.20 % 29,200 70,984

OneEnergy Asia Limited

Power generation

Vietnam 40.00 % 296,872 556,723

Prime Swedish Holding AB

Overseas investment business

Sweden 45.00 % 35,410 41,964

Namyangju Combined Heat and Power Co., Ltd. (*14)

Generating and distributing vapor and hot/cold water

Korea 70.10 % 149,313 146,592

61


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(1)

Investments in associates and joint ventures as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won

As of June 30, 2026

Investees

Key operation activities

Location Percentage
of ownership
Acquisition
cost
Book
value

<Joint ventures>

Trumbull Development Partners, LLC (*15)

Overseas investment business

USA 56.23 % W 442,880 461,983

Grove Energy Capital IV, LLC (*18)

Overseas investment business

USA 16.00 % 58,900 51,768

Others (Dangjin Ecopower Co., Ltd. and 99 others)

697,415 713,161
5,030,940 7,018,364
W 8,541,938 14,210,448
(*1)

The effective percentage of ownership, including the effect of hybrid bond, is 21.66%.

(*2)

The effective percentage of ownership is 100%. However, the Government regulates the Group’s ability to make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Group’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The Group can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.

(*3)

The effective percentage of ownership is less than 20%. However, the Group can exercise significant influence by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Group’s financial and operating policy of the board of directors.

(*4)

The Group is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation and time or proceeds of sales are not specified as of June 30, 2026.

(*5)

The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred stock into ordinary stock.

(*6)

The effective percentage of ownership is more than 50% but the Group does not hold control over the entity according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.

(*7)

The effective percentage of ownership is more than 50% but the Group does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.

(*8)

The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Group exercises significant influence over the critical decisions related to finance and operation.

(*9)

The effective percentage of ownership is less than 50%. However, all critical financial and operating decisions must be agreed to by all ownership parties. Accordingly, the entities are classified as joint ventures.

(*10)

The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement, all critical financial and operating decisions must be agreed to by all ownership parties and the Group can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.

(*11)

The effective percentage of ownership is less than 50%. However, all critical financial and operating decisions must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.

(*12)

Although the nominal percentage of ownership of Daegu Green Power Co., Ltd. is 29.00%, the effective percentage of ownership is 54.2%, considering the interest of financial investors as a liability component. In addition, the entity was classified as a joint venture considering the minimum board voting-right requirement for decisions on significant financial and operating policies under the joint shareholders’ agreement.

(*13)

Although the Group’s effective percentage of ownership is more than 50%, the entity is classified as a joint venture because decisions on relevant activities require the unanimous consent of all parties.

(*14)

Although the Group’s effective percentage of ownership is more than 50%, the entity is classified as a joint venture since the entity’s critical financial and operating decisions require unanimous agreement of members in the board of directors.

(*15)

Although the Group’s ownership interest exceeds 50%, the investee is classified as a joint venture considering the minimum required board voting rights for significant financial and operating policies under the joint agreement between shareholders.

(*16)

The nominal ownership percentage of Shin Pyeongtaek Power Co., Ltd. is 48.6%, and the effective ownership percentage considering redeemable convertible preferred shares is 40%.

(*17)

Although the Group’s ownership percentage is less than 50%, it is classified as a joint venture considering the minimum required voting rights at the board of directors for significant financial and operating policies under the joint agreement between shareholders.

(*18)

Although the Group’s ownership percentage is less than 50%, it is classified as a joint venture as unanimous consent is required for decisions on relevant activities.

(*19)

The Group’s ownership percentage changed due to a disproportionate capital increase by a financial investor during the six-month period ended June 30, 2026.

62


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(1)

Investments in associates and joint ventures as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won

As of December 31, 2025

Investees

Key operation activities

Location Percentage
of ownership
Acquisition
cost
Book
value

<Associates>

Korea Gas Corporation (*1)

Importing and wholesaling LNG

Korea 20.47 % W 94,500 2,283,535

Hyundai Green Power Co., Ltd.

Power generation equipment consignment and operation service

Korea 29.00 % 88,885 86,549

Korea Power Exchange (*2)

Management of power market

and others

Korea 100.00 % 127,839 262,069

Daeryun Power Co., Ltd. (*3)

Power generation

Korea 6.85 % 46,373 34,475

SPC Power Corporation (*4)

Power generation

Philippines 38.00 % 20,635 107,067

Gemeng International Energy Co., Ltd.

Power generation

China 42.00 % 516,007 812,292

PT. Cirebon Electric Power

Power generation

Indonesia 27.50 % 40,365 162,112

PT Wampu Electric Power

Power generation

Indonesia 46.00 % 21,292 36,516

PT. Bayan Resources TBK

Resources development

Indonesia 20.00 % 615,860 731,714

S-Power Co., Ltd.

Power generation

Korea 49.00 % 132,300 200,335

Xe-Pian Xe-Namnoy Power Co., Ltd.

Power generation

Laos 25.00 % 87,426 65,612

Goseong Green Power Co., Ltd.

Power generation

Korea 29.00 % 262,740 276,085

Gangneung Eco Power Co., Ltd.

Power generation

Korea 29.00 % 261,000 227,683

Shin Pyeongtaek Power Co., Ltd. (*16)

Power generation

Korea 48.60 % 72,000 148,586

Dongducheon Dream Power Co., Ltd. (*5)

Power generation

Korea 33.61 % 148,105 102,321

GS Donghae Electric Power Co., Ltd.

Power generation

Korea 34.00 % 204,000 286,796

Nepal Water & Energy Development Company Private Limited (*6,18)

Construction and operation of

utility plant

Nepal 66.10 % 110,332 192,705

Indeck Niles Development, LLC

Holding company

USA 50.00 % 249,274 363,675

Saemangeum Sebit Power Plant Co., Ltd. (*7)

Power generation

Korea 55.14 % 21,037 37,662

PT. Cirebon Energi Prasarana (*8)

Power generation

Indonesia 10.00 % 26,710 94,005

Others (Taebaek Guinemi Wind Power Co., Ltd. and 86 others)

261,969 339,662
W 3,408,649 6,851,456

63


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(1)

Investments in associates and joint ventures as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won

As of December 31, 2025

Investees

Key operation activities

Location Percentage
of ownership
Acquisition
cost
Book
value

<Joint ventures>

Shuweihat Asia Power Investment B.V.

Holding company

Netherlands 49.00 % W 44,405 82,230

KEPCO SPC Power Corporation (*4,10)

Construction and operation of utility plant

Philippines 60.00 % 94,579 119,443

Datang Chifeng Renewable Power Co., Ltd.

Power generation

China 40.00 % 121,928 212,130

Datang KEPCO Chaoyang Renewable Power Co.,

Ltd.

Power generation

China 40.00 % 39,872 49,501

Rabigh Electricity Company (*9)

Power generation


Saudi
Arabia

40.00 % 109,743 285,805

Jamaica Public Service Company Limited

Power generation

Jamaica 40.00 % 301,910 412,277

Amman Asia Electric Power Company (*10)

Power generation

Jordan 60.00 % 111,476 274,751

Chun-cheon Energy Co., Ltd.

Power generation

Korea 29.90 % 52,700 36,703

Nghi Son 2 Power LLC

Power generation

Vietnam 50.00 % 175,261 566,700

Kelar S.A. (*14)

Power generation

Chile 65.00 % 78,060 153,294

PT. Tanjung Power Indonesia

Power generation

Indonesia 35.00 % 57,039 98,221

Barakah One Company (*11)

Power generation

UAE 18.00 % 1,794,166 1,672,507

Daegu Green Power Co., Ltd. (*12)

Power generation

Korea 29.00 % 46,225 31,119

Yeonggwang Wind Power Co., Ltd.

Power generation

Korea 46.00 % 17,475 29,258

South Jamaica Power Company Limited

Power generation

Jamaica 20.00 % 20,430 48,675

RE Holiday Holdings LLC

Power generation

USA 50.00 % 42,948 80,631

RE Pioneer Holdings LLC

Power generation

USA 50.00 % 27,891 48,831

RE Barren Ridge 1 Holdings LLC

Power generation

USA 50.00 % 28,021 54,825

Solar Philippines Calatagan Corporation

Power generation

Philippines 38.00 % 47,903 61,113

PT Barito Wahana Tenaga

Power generation

Indonesia 30.61 % 59,574 225,828

Cheongna Energy Co., Ltd. (*13)

Generating and distributing vapor

and hot/cold water

Korea 50.10 % 49,344 67,846

Naepo Green Energy Co., Ltd. (*17)

Power generation

Korea 29.20 % 29,200 59,242

OneEnergy Asia Limited

Power generation

Vietnam 40.00 % 296,872 494,403

Prime Swedish Holding AB

Holding company

Sweden 45.00 % 35,410 38,664

Namyangju Combined Heat and Power Co., Ltd. (*14)

Generating and distributing vapor

and hot/cold water

Korea 70.10 % 149,313 147,146

Trumbull Development Partners, LLC (*15)

Holding company

USA 56.23 % 415,467 439,268

Others (Dangjin Eco Power Co., Ltd. and 95 others)

703,432 721,921
4,950,644 6,512,332
W 8,359,293 13,363,788
(*1)

The effective percentage of ownership, including the effect of hybrid bond, is 21.66%.

(*2)

The effective percentage of ownership is 100%. However, the Government regulates the Group’s ability to make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Group’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The Group can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.

(*3)

The effective percentage of ownership is less than 20%. However, the Group can exercise significant influence by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Group’s financial and operating policy of the board of directors.

(*4)

The Group is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation and time or proceeds of sales are not specified as of December 31, 2025.

(*5)

The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred stock into ordinary stock.

(*6)

The effective percentage of ownership is more than 50% but the Group does not hold control over the entity according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.

(*7)

The effective percentage of ownership is more than 50% but the Group does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.

(*8)

The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Group exercises significant influence over the critical decisions related to finance and operation.

(*9)

The effective percentage of ownership is less than 50%. However, all critical financial and operating decisions must be agreed to by all ownership parties. Accordingly, the entities are classified as joint ventures.

(*10)

The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement, all critical financial and operating decisions must be agreed to by all ownership parties and the Group can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.

64


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(1)

Investments in associates and joint ventures as of June 30, 2026 and December 31, 2025 are as follows, continued:

(*11)

The effective percentage of ownership is less than 50%. However, decisions in relevant activities must be agreed by ownership parties. Accordingly, the entity is classified as a joint venture.

(*12)

Although the nominal percentage of ownership of Daegu Green Power Co., Ltd. is 29.00%, the effective percentage of ownership is 54.2%, considering the interest of financial investors as a liability component. In addition, the entity was classified as a joint venture considering the minimum board voting-right requirement for decisions on significant financial and operating policies under the joint shareholders’ agreement.

(*13)

Although the Group’s effective percentage of ownership is more than 50%, However, decisions in relevant activities must be agreed by ownership parties. Accordingly, the entity is classified as a joint venture.

(*14)

Although the Group’s effective percentage of ownership is more than 50%, the entity is classified as a joint venture since the entity’s critical financial and operating decisions require unanimous agreement of members in the board of directors.

(*15)

Although the Group’s ownership interest exceeds 50%, the investee is classified as a joint venture considering the minimum required board voting rights for significant financial and operating policies under the joint agreement between shareholders.

(*16)

The nominal ownership percentage of Shin Pyeongtaek Power Co., Ltd. is 48.6%, and the effective ownership percentage considering redeemable convertible preferred shares is 40%.

(*17)

Although the Group’s ownership percentage is less than 50%, it is classified as a joint venture considering the minimum required voting rights at the board of directors for significant financial and operating policies under the joint agreement between shareholders.

(*18)

The Group’s ownership percentage changed due to a disproportionate capital increase by a financial investor during the year ended December 31, 2025.

65


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(2)

The fair values of investments in associates which are actively traded in an open market as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

Investees

As of June 30, 2026 As of December 31, 2025

<Associates>

Korea Electric Power Industrial Development Co., Ltd.

W  109,855 98,511

Korea Gas Corporation

603,855 742,770

SPC Power Corporation

152,896 134,901

PT. Bayan Resources TBK

6,580,800 8,959,467

66


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(3)

Changes in investments in associates and joint ventures for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won

For the six-month period ended June 30, 2026

Investees

Beginning
balance
Acquisition Disposals Dividends
received
Share of
income
(loss)
Other
comprehen-
sive income
(loss)
Others Ending
balance

<Associates>

Korea Gas Corporation

W 2,283,535 —  —  (21,811 ) 192,284 35,967 1,048 2,491,023

Hyundai Green Power Co., Ltd.

86,549 —  —  (3,555 ) 822 —  —  83,816

Korea Power Exchange

262,069 —  —  —  2,178 —  —  264,247

Daeryun Power Co., Ltd.

34,475 —  —  —  2,327 —  1 36,803

SPC Power Corporation

107,067 —  —  —  6,657 3,731 —  117,455

Gemeng International Energy Co., Ltd.

812,292 —  —  (40,867 ) 46,552 91,775 —  909,752

PT. Cirebon Electric Power

162,112 —  —  —  2,928 12,158 —  177,198

PT Wampu Electric Power

36,516 —  —  (2,048 ) 555 2,477 —  37,500

PT. Bayan Resources TBK

731,714 —  —  (153,194 ) 82,955 58,600 (52 ) 720,023

S-Power Co., Ltd.

200,335 —  —  —  9,499 —  —  209,834

Xe-Pian Xe-Namnoy Power Co., Ltd.

65,612 —  —  —  9,306 5,534 —  80,452

Goseong Green Power Co., Ltd.

276,085 —  —  —  (9,769 ) —  —  266,316

Gangneung Eco Power Co., Ltd.

227,683 —  —  —  416 —  —  228,099

Shin Pyeongtaek Power Co., Ltd.

148,586 —  —  (8,000 ) (3,784 ) —  —  136,802

Dongducheon Dream Power Co., Ltd.

102,321 —  —  —  1,898 —  —  104,219

GS Donghae Electric Power Co., Ltd.

286,796 —  —  —  9,285 —  —  296,081

Nepal Water & Energy Development Company

Private Limited

192,705 —  —  —  (13,554 ) 14,013 —  193,164

Indeck Niles Development, LLC

363,675 —  —  (125,149 ) 46,362 (20,158 ) —  264,730

Saemangeum Sebit Power Plant Co., Ltd.

37,662 —  —  —  995 —  —  38,657

PT. Cirebon Energi Prasarana

94,005 —  —  —  2,904 8,335 —  105,244

Shinan-Ui Offshore Wind Power Co., Ltd.

—  96,100 —  —  (6,407 ) —  2,985 92,678

Others (Taebaek Guinemi Wind Power Co., Ltd. and 89 others)

339,662 9,516 (2,868 ) (19,226 ) 5,993 5,377 (463 ) 337,991
6,851,456 105,616 (2,868 ) (373,850 ) 390,402 217,809 3,519 7,192,084

<Joint ventures>

Shuweihat Asia Power Investment B.V.

82,230 —  —  —  1,944 10,442 —  94,616

KEPCO SPC Power Corporation

119,443 —  —  (5,942 ) 3,842 3,994 —  121,337

Datang Chifeng Renewable Power Co., Ltd.

212,130 —  —  (13,830 ) 2,365 37,326 —  237,991

Datang KEPCO Chaoyang Renewable Power

Co., Ltd.

49,501 —  —  —  927 5,522 —  55,950

Rabigh Electricity Company

285,805 —  —  —  (1,293 ) 23,320 —  307,832

Jamaica Public Service Company Limited

412,277 —  —  —  16,155 31,256 —  459,688

Amman Asia Electric Power Company

274,751 —  —  (28,450 ) 10,163 20,800 —  277,264

Chun-cheon Energy Co., Ltd.

36,703 —  —  —  (34 ) —  —  36,669

Nghi Son 2 Power LLC

566,700 —  —  —  40,996 56,099 —  663,795

Kelar S.A.

153,294 —  —  —  9,528 11,513 246 174,581

PT. Tanjung Power Indonesia

98,221 —  —  (4,620 ) 4,129 8,932 (1,167 ) 105,495

Barakah One Company

1,672,507 —  —  (35,691 ) (6,473 ) 106,769 —  1,737,112

Daegu Green Power Co., Ltd.

31,119 —  —  —  1,843 —  —  32,962

Yeonggwang Wind Power Co., Ltd.

29,258 —  —  —  (1,300 ) —  —  27,958

South Jamaica Power Company Limited

48,675 —  —  (1,155 ) 2,241 3,617 —  53,378

RE Holiday Holdings LLC

80,631 —  —  —  (4,843 ) 5,634 —  81,422

RE Pioneer Holdings LLC

48,831 —  —  —  (3,422 ) 3,549 —  48,958

RE Barren Ridge 1 Holdings LLC

54,825 —  —  (1,484 ) (1,919 ) 3,979 —  55,401

Solar Philippines Calatagan Corporation

61,113 —  —  (6,351 ) 3,176 1,996 —  59,934

PT Barito Wahana Tenaga

225,828 —  —  —  18,505 19,076 —  263,409

67


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(3)

Changes in investments in associates and joint ventures for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows, continued:

In millions of won

For the six-month period ended June 30, 2026

Investees

Beginning
balance
Acquisition Disposals Dividends
received
Share of
income
(loss)
Other
comprehen-
sive income
(loss)
Others Ending
balance

<Joint ventures>

Cheongna Energy Co., Ltd.

W 67,846 —  —  —  11,591 —  —  79,437

Naepo Green Energy Co., Ltd.

59,242 —  —  (11,972 ) 23,714 —  —  70,984

OneEnergy Asia Limited

494,403 —  —  —  22,500 39,820 —  556,723

Prime Swedish Holding AB

38,664 —  —  —  2,310 990 —  41,964

Namyangju Combined Heat and Power Co., Ltd.

147,146 —  —  —  (554 ) —  —  146,592

Trumbull Development Partners, LLC

439,268 27,413 —  —  (39,200 ) 34,502 —  461,983

Grove Energy Capital IV, LLC

—  58,900 —  —  (8,588 ) 1,456 —  51,768

Others (Dangjin Ecopower Co., Ltd. and 101 others)

721,921 27,560 (3,159 ) (18,403 ) 11,646 19,111 (45,515 ) 713,161
6,512,332 113,873 (3,159 ) (127,898 ) 119,949 449,703 (46,436 ) 7,018,364
W 13,363,788 219,489 (6,027 ) (501,748 ) 510,351 667,512 (42,917 ) 14,210,448

68


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(3)

Changes in investments in associates and joint ventures for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows, continued:

In millions of won

For the year ended December 31, 2025

Investees

Beginning
balance
Acquisition Disposals Dividends
received
Share of
income
(loss)
Other
comprehen-
sive income
(loss)
Others Ending
balance

<Associates>

Korea Gas Corporation

W 2,289,304 —  —  (27,500 ) 28,811 (5,964 ) (1,116 ) 2,283,535

Hyundai Green Power Co., Ltd.

87,393 —  —  (3,555 ) 2,678 —  33 86,549

Korea Power Exchange

273,962 —  —  —  (5,173 ) —  (6,720 ) 262,069

Daeryun Power Co., Ltd.

31,093 —  —  —  3,381 —  1 34,475

SPC Power Corporation

107,574 —  —  (16,876 ) 20,767 (4,398 ) —  107,067

Gemeng International Energy Co., Ltd.

728,338 —  —  (19,510 ) 87,732 15,732 —  812,292

PT. Cirebon Electric Power

157,530 —  —  —  8,270 (3,688 ) —  162,112

PT Wampu Electric Power

39,268 —  —  (3,928 ) 1,699 (523 ) —  36,516

PT. Bayan Resources TBK

717,376 —  —  (109,528 ) 142,742 (18,784 ) (92 ) 731,714

S-Power Co., Ltd.

180,372 —  —  —  19,962 1 —  200,335

Xe-Pian Xe-Namnoy Power Co., Ltd.

73,065 —  —  —  (4,845 ) (2,608 ) —  65,612

Goseong Green Power Co., Ltd.

284,542 —  —  —  (8,457 ) —  —  276,085

Gangneung Eco Power Co., Ltd.

241,814 —  —  —  (14,131 ) —  —  227,683

Shin Pyeongtaek Power Co., Ltd.

139,059 —  —  —  9,523 —  4 148,586

Dongducheon Dream Power Co., Ltd.

91,351 —  —  —  10,975 —  (5 ) 102,321

GS Donghae Electric Power Co., Ltd.

279,432 —  —  (12,029 ) 19,675 —  (282 ) 286,796

Nepal Water & Energy Development Company Private Limited

170,955 —  —  —  25,028 (3,278 ) —  192,705

Indeck Niles Development, LLC

370,970 —  —  (37,126 ) 60,484 (30,653 ) —  363,675

Saemangeum Sebit Power Plant Co., Ltd.

37,110 —  —  —  552 —  —  37,662

PT. Cirebon Energi Prasarana

96,846 —  —  —  3,341 (6,182 ) —  94,005

Others (Taebaek Guinemi Wind Power Co., Ltd. and 86 others)

307,400 15,109 (1,791 ) (15,384 ) 32,434 11 1,883 339,662
6,704,754 15,109 (1,791 ) (245,436 ) 445,448 (60,334 ) (6,294 ) 6,851,456

<Joint ventures>

Shuweihat Asia Power Investment B.V.

86,450 —  —  (1,087 ) 1,699 (4,832 ) —  82,230

KEPCO SPC Power Corporation

159,139 —  —  (39,832 ) 6,106 (5,970 ) —  119,443

Datang Chifeng Renewable Power Co., Ltd.

204,516 —  —  —  3,974 3,640 —  212,130

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

48,325 —  —  —  330 846 —  49,501

Rabigh Electricity Company

269,893 —  —  (1,696 ) 28,441 (10,833 ) —  285,805

Jamaica Public Service Company Limited

412,616 —  —  (9,700 ) 14,193 (5,435 ) 603 412,277

Amman Asia Electric Power Company

268,864 —  —  —  17,500 (11,613 ) —  274,751

Chun-cheon Energy Co., Ltd.

36,599 —  —  —  104 —  —  36,703

Nghi Son 2 Power LLC

563,079 —  —  —  44,061 (40,440 ) —  566,700

Kelar S.A.

152,367 —  —  —  7,027 (6,100 ) —  153,294

PT. Tanjung Power Indonesia

100,580 —  —  (4,785 ) 7,202 (4,229 ) (547 ) 98,221

Barakah One Company

—  1,794,047 —  —  (92,162 ) (29,378 ) —  1,672,507

Daegu Green Power Co., Ltd.

30,513 —  —  —  583 —  23 31,119

Yeonggwang Wind Power Co., Ltd.

26,146 —  —  —  3,112 —  —  29,258

South Jamaica Power Company Limited

48,760 —  —  (3,618 ) 4,568 (1,035 ) —  48,675

RE Holiday Holdings LLC

89,780 —  —  —  (6,460 ) (2,689 ) —  80,631

RE Pioneer Holdings LLC

55,622 —  —  —  (5,430 ) (1,361 ) —  48,831

RE Barren Ridge 1 Holdings LLC

59,806 —  —  (1,663 ) (1,781 ) (1,537 ) —  54,825

Solar Philippines Calatagan Corporation

63,695 —  —  (6,480 ) 6,258 (2,360 ) —  61,113

PT Barito Wahana Tenaga

207,565 —  —  —  37,915 (19,652 ) —  225,828

Cheongna Energy Co., Ltd.

46,158 —  —  —  21,688 —  —  67,846

69


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(3)

Changes in investments in associates and joint ventures for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows, continued:

In millions of won

For the year ended December 31, 2025

Investees

Beginning
balance
Acquisition Disposals Dividends
received
Share of
income
(loss)
Other
comprehen-
sive income
(loss)
Others Ending
balance

<Joint ventures>

Naepo Green Energy Co., Ltd.

W 48,031 —  —  (13,432 ) 24,643 —  —  59,242

OneEnergy Asia Limited

465,349 38,861 —  —  26,030 (35,837 ) —  494,403

Prime Swedish Holding AB

37,559 —  —  (203 ) (2,301 ) 3,609 —  38,664

Namyangju Combined Heat and Power Co., Ltd.

51,768 95,336 —  —  36 6 —  147,146

Trumbull Development Partners, LLC

355,379 110,631 —  —  (11,696 ) (15,046 ) —  439,268

Others (Dangjin Ecopower Co., Ltd. and 98 others)

692,781 52,542 (11,708 ) (18,271 ) 19,587 (23,183 ) 10,173 721,921
4,581,340 2,091,417 (11,708 ) (100,767 ) 155,227 (213,429 ) 10,252 6,512,332
W 11,286,094 2,106,526 (13,499 ) (346,203 ) 600,675 (273,763 ) 3,958 13,363,788

70


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(4)

The summarized financial information of associates and joint ventures as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows:

In millions of won

As of and for the six-month period ended June 30, 2026

Investees

Total assets Total liabilities Sales Profit (loss) for
the period

<Associates>

Korea Gas Corporation

W 52,346,044 40,589,801 19,310,167 887,143

Hyundai Green Power Co., Ltd.

628,599 237,370 54,979 5,024

Korea Power Exchange

348,327 84,080 55,340 2,519

Daeryun Power Co., Ltd.

1,114,337 565,101 234,449 31,751

SPC Power Corporation

354,707 45,618 31,772 17,614

Gemeng International Energy Co., Ltd.

9,172,831 5,975,568 1,509,824 94,999

PT. Cirebon Electric Power

765,459 121,105 155,651 10,646

PT Wampu Electric Power

193,317 111,798 1,511 1,206

PT. Bayan Resources TBK

5,669,214 1,843,643 2,582,073 608,763

S-Power Co., Ltd.

663,994 233,898 323,478 19,275

Xe-Pian Xe-Namnoy Power Co., Ltd.

1,636,518 1,171,403 113,614 37,140

Goseong Green Power Co., Ltd.

4,794,170 3,839,575 550,189 (32,423 )

Gangneung Eco Power Co., Ltd.

5,290,910 4,626,276 378,951 (9,699 )

Shin Pyeongtaek Power Co., Ltd.

1,002,924 637,144 214,491 (10,288 )

Dongducheon Dream Power Co., Ltd.

1,309,595 967,361 517,809 2,069

GS Donghae Electric Power Co., Ltd.

1,832,288 961,462 275,828 27,307

Nepal Water & Energy Development Company Private Limited

932,029 586,297 27,767 (2,109 )

Indeck Niles Development, LLC

1,304,746 993,029 362,334 94,214

Saemangeum Sebit Power Plant Co., Ltd.

143,500 73,549 11,605 1,809

PT. Cirebon Energi Prasarana

3,730,453 2,678,010 290,582 29,049

Shinan-Ui Offshore Wind Power Co., Ltd.

865,566 382,000 —  (20,398 )

<Joint ventures>

Shuweihat Asia Power Investment B.V.

193,186 91 —  (85 )

KEPCO SPC Power Corporation

242,807 40,577 82,423 4,655

Datang Chifeng Renewable Power Co., Ltd.

910,003 315,022 59,945 5,925

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

192,449 52,572 15,511 2,307

Rabigh Electricity Company

2,543,613 1,688,661 146,799 (9,625 )

Jamaica Public Service Company Limited

3,035,760 1,927,003 757,930 44,302

Amman Asia Electric Power Company

756,045 293,939 21,268 17,467

Chun-cheon Energy Co., Ltd.

507,855 384,397 190,073 116

Nghi Son 2 Power LLC

4,657,505 3,329,915 513,489 82,040

Kelar S.A.

740,310 477,189 59,466 11,729

PT. Tanjung Power Indonesia

740,543 439,129 57,247 11,692

Barakah One Company

47,362,215 38,852,885 4,494,025 6,730

Daegu Green Power Co., Ltd.

452,818 354,626 137,133 3,195

Yeonggwang Wind Power Co., Ltd.

200,463 140,755 10,513 (2,015 )

South Jamaica Power Company Limited

546,129 279,221 148,643 11,722

RE Holiday Holdings LLC

343,582 180,739 3,466 (3,619 )

RE Pioneer Holdings LLC

261,585 163,670 3,452 (2,197 )

RE Barren Ridge 1 Holdings LLC

212,322 101,520 3,118 (1,833 )

Solar Philippines Calatagan Corporation

177,940 54,066 10,195 5,738

PT Barito Wahana Tenaga

860,469 —  —  79,696

Cheongna Energy Co., Ltd.

492,108 337,469 94,471 23,115

Naepo Green Energy Co., Ltd.

781,139 549,828 190,221 50,996

OneEnergy Asia Limited

4,067,029 2,739,003 329,376 56,198

Prime Swedish Holding AB

159,829 70,317 8,012 5,134

71


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(4)

The summarized financial information of associates and joint ventures as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the six-month period ended June 30, 2026

Investees

Total assets Total liabilities Sales Profit (loss) for
the period

Namyangju Combined Heat and Power Co., Ltd.

W 340,617 131,774 —  (790 )

Trumbull Development Partners, LLC

2,014,826 1,290,376 134,442 (69,715 )

Grove Energy Capital IV, LLC

185,122 694 (50,701 ) (53,670 )
In millions of won

As of and for the year ended December 31, 2025

Investees

Total assets Total liabilities Sales Profit (loss) for
the period

<Associates>

Korea Gas Corporation

W 53,627,847 42,828,922 35,727,336 132,251

Hyundai Green Power Co., Ltd.

656,989 256,336 111,887 9,787

Korea Power Exchange

350,477 88,408 126,117 2,817

Daeryun Power Co., Ltd.

1,102,566 587,322 393,540 48,372

SPC Power Corporation

313,540 31,783 73,796 55,063

Gemeng International Energy Co., Ltd.

8,504,351 5,688,462 3,149,333 222,146

PT. Cirebon Electric Power

724,772 135,272 304,258 30,071

PT Wampu Electric Power

190,896 111,514 19,113 3,694

PT. Bayan Resources TBK

4,842,617 1,149,228 4,874,768 1,118,309

S-Power Co., Ltd.

664,275 253,454 660,755 40,452

Xe-Pian Xe-Namnoy Power Co., Ltd.

1,533,443 1,127,607 213,673 (23,055 )

Goseong Green Power Co., Ltd.

4,953,795 3,966,676 1,307,686 (17,519 )

Gangneung Eco Power Co., Ltd.

5,413,851 4,752,300 932,084 (27,205 )

Shin Pyeongtaek Power Co., Ltd.

1,021,409 625,341 697,349 22,149

Dongducheon Dream Power Co., Ltd.

1,266,052 928,870 1,123,208 31,456

GS Donghae Electric Power Co., Ltd.

1,794,220 950,702 544,701 57,866

Nepal Water & Energy Development Company Private Limited

868,222 578,041 146,768 25,127

Indeck Niles Development, LLC

1,208,801 685,577 456,748 123,823

Saemangeum Sebit Power Plant Co., Ltd.

143,281 75,139 20,428 1,003

PT. Cirebon Energi Prasarana

3,650,107 2,710,061 525,647 33,411

<Joint ventures>

Shuweihat Asia Power Investment B.V.

167,992 177 —  (405 )

KEPCO SPC Power Corporation

234,570 35,498 159,381 10,392

Datang Chifeng Renewable Power Co., Ltd.

827,575 297,251 111,688 13,150

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

179,775 56,023 27,350 986

Rabigh Electricity Company

2,473,573 1,667,517 367,680 66,776

Jamaica Public Service Company Limited

2,903,070 1,910,042 1,530,704 41,735

Amman Asia Electric Power Company

758,903 300,985 30,651 29,223

Chun-cheon Energy Co., Ltd.

499,150 375,580 363,995 325

Nghi Son 2 Power LLC

4,243,607 3,110,208 824,849 87,686

Kelar S.A.

678,813 448,065 114,267 15,295

PT. Tanjung Power Indonesia

695,407 414,774 105,871 20,516

Barakah One Company

45,516,321 37,236,879 2,373,596 171,548

Daegu Green Power Co., Ltd.

450,953 356,158 258,151 1,309

Yeonggwang Wind Power Co., Ltd.

210,262 147,728 31,232 7,664

South Jamaica Power Company Limited

522,505 279,114 287,408 22,842

RE Holiday Holdings LLC

334,702 173,439 16,417 (7,622 )

RE Pioneer Holdings LLC

251,486 153,824 14,708 (7,711 )

RE Barren Ridge 1 Holdings LLC

206,966 97,315 12,685 (1,673 )

72


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(4)

The summarized financial information of associates and joint ventures as of and for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows, continued:

In millions of won

As of and for the year ended December 31, 2025

Investees

Total assets Total liabilities Sales Profit (loss) for
the period

Solar Philippines Calatagan Corporation

W 162,588 46,665 22,752 11,978

PT Barito Wahana Tenaga

737,706 —  —  100,948

Cheongna Energy Co., Ltd.

495,919 364,410 160,101 43,278

Naepo Green Energy Co., Ltd.

759,180 568,084 427,122 80,207

OneEnergy Asia Limited

3,529,252 2,357,026 139,025 61,186

Prime Swedish Holding AB

151,330 69,152 10,691 (5,114 )

Namyangju Combined Heat and Power Co., Ltd.

211,193 1,559 —  51

Trumbull Development Partners, LLC

1,812,101 1,121,329 10,137 (20,709 )
(5)

The financial information of associates and joint ventures reconciled to the Group’s investments in condensed consolidated financial statements as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won

As of June 30, 2026

Investees

Net assets Percentage of
ownership (*)
Share in
net assets
Investment
differential
Intercompany
transaction
Others Book
value

<Associates>

Korea Gas Corporation

W 11,756,243 21.66 % 2,546,402 —  —  (55,379 ) 2,491,023

Hyundai Green Power Co., Ltd.

391,229 29.00 % 113,456 —  —  (29,640 ) 83,816

Korea Power Exchange

264,247 100.00 % 264,247 —  —  —  264,247

Daeryun Power Co., Ltd.

549,236 6.85 % 37,623 —  —  (820 ) 36,803

SPC Power Corporation

309,089 38.00 % 117,455 —  —  —  117,455

Gemeng International Energy Co., Ltd.

3,197,263 42.00 % 1,342,852 —  —  (433,100 ) 909,752

PT. Cirebon Electric Power

644,354 27.50 % 177,198 —  —  —  177,198

PT Wampu Electric Power

81,519 46.00 % 37,500 —  —  —  37,500

PT. Bayan Resources TBK

3,825,571 20.00 % 765,114 31,289 —  (76,380 ) 720,023

S-Power Co., Ltd.

430,096 49.00 % 210,747 —  (913 ) —  209,834

Xe-Pian Xe-Namnoy Power Co., Ltd.

465,115 25.00 % 116,278 305 (884 ) (35,247 ) 80,452

Goseong Green Power Co., Ltd.

954,595 29.00 % 276,832 —  (10,516 ) —  266,316

Gangneung Eco Power Co., Ltd.

664,634 29.00 % 192,744 44,383 (9,028 ) —  228,099

Shin Pyeongtaek Power Co., Ltd.

365,780 40.00 % 146,312 3,559 (13,069 ) —  136,802

Dongducheon Dream Power Co., Ltd.

342,234 34.01 % 116,394 1,757 (1,350 ) (12,582 ) 104,219

GS Donghae Electric Power Co., Ltd.

870,826 34.00 % 296,081 —  —  —  296,081

Nepal Water & Energy Development Company Private Limited

345,732 55.67 % 192,459 705 —  —  193,164

Indeck Niles Development, LLC

311,717 50.00 % 155,858 104,201 —  4,671 264,730

Saemangeum Sebit Power Plant Co., Ltd.

69,951 55.00 % 38,475 182 —  —  38,657

PT. Cirebon Energi Prasarana

1,052,443 10.00 % 105,244 —  —  —  105,244

Shinan-Ui Offshore Wind Power Co., Ltd.

483,566 18.84 % 91,104 1,574 —  —  92,678

<Joint ventures>

Shuweihat Asia Power Investment B.V.

193,095 49.00 % 94,616 —  —  —  94,616

KEPCO SPC Power Corporation

202,230 60.00 % 121,337 —  —  —  121,337

Datang Chifeng Renewable Power Co., Ltd.

594,981 40.00 % 237,991 —  —  —  237,991

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

139,877 40.00 % 55,950 —  —  —  55,950

Rabigh Electricity Company

854,952 40.00 % 341,980 —  (33,343 ) (805 ) 307,832

Jamaica Public Service Company Limited

1,108,757 40.00 % 443,503 29,357 —  (13,172 ) 459,688

Amman Asia Electric Power Company

462,106 60.00 % 277,264 —  —  —  277,264

Chun-cheon Energy Co., Ltd.

123,458 29.90 % 36,914 3 —  (248 ) 36,669

Nghi Son 2 Power LLC

1,327,590 50.00 % 663,795 —  —  —  663,795

Kelar S.A.

263,121 65.00 % 171,028 3,553 —  —  174,581

PT. Tanjung Power Indonesia

301,414 35.00 % 105,495 —  —  —  105,495

Barakah One Company

8,509,330 18.00 % 1,531,679 —  205,433 —  1,737,112

Daegu Green Power Co., Ltd.

98,192 54.24 % 53,259 84 —  (20,381 ) 32,962

Yeonggwang Wind Power Co., Ltd.

59,708 46.00 % 27,466 492 —  —  27,958

73


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(5)

The financial information of associates and joint ventures reconciled to the Group’s investments in condensed consolidated financial statements as of June 30, 2026 and December 31, 2025 is as follows, continued:

In millions of won

As of June 30, 2026

Investees

Net assets Percentage of
ownership (*)
Share in
net
assets
Investment
differential
Intercompany
transaction
Others Book
value

South Jamaica Power Company Limited

W 266,908 20.00 % 53,381 —  —  (3 ) 53,378

RE Holiday Holdings LLC

162,843 50.00 % 81,422 —  —  —  81,422

RE Pioneer Holdings LLC

97,915 50.00 % 48,958 —  —  —  48,958

RE Barren Ridge 1 Holdings LLC

110,802 50.00 % 55,401 —  —  —  55,401

Solar Philippines Calatagan Corporation

123,874 38.00 % 47,072 —  —  12,862 59,934

PT Barito Wahana Tenaga

860,469 30.61 % 263,409 —  —  —  263,409

Cheongna Energy Co., Ltd.

154,639 50.10 % 77,474 3,137 (1,174 ) —  79,437

Naepo Green Energy Co., Ltd.

231,311 29.20 % 67,542 3,442 —  —  70,984

OneEnergy Asia Limited

1,328,026 40.00 % 531,211 25,512 —  —  556,723

Prime Swedish Holding AB

89,512 45.00 % 40,280 1,684 —  —  41,964

Namyangju Combined Heat and Power Co., Ltd.

208,843 70.10 % 146,400 192 —  —  146,592

Trumbull Development Partners, LLC

724,450 56.23 % 407,358 54,625 —  —  461,983

Grove Energy Capital IV, LLC

184,428 16.00 % 29,508 22,260 —  —  51,768

In millions of won

As of December 31, 2025

Investees

Net assets Percentage of
ownership (*)
Share in
net assets
Investment
differential
Intercompany
transaction
Others Book
value

<Associates>

Korea Gas Corporation

W 10,798,925 21.66 % 2,339,047 —  —  (55,512 ) 2,283,535

Hyundai Green Power Co., Ltd.

400,653 29.00 % 116,189 —  —  (29,640 ) 86,549

Korea Power Exchange

262,069 100.00 % 262,069 —  —  —  262,069

Daeryun Power Co., Ltd.

515,244 6.85 % 35,295 —  —  (820 ) 34,475

SPC Power Corporation

281,757 38.00 % 107,067 —  —  —  107,067

Gemeng International Energy Co., Ltd.

2,815,889 42.00 % 1,182,674 —  —  (370,382 ) 812,292

PT. Cirebon Electric Power

589,500 27.50 % 162,112 —  —  —  162,112

PT Wampu Electric Power

79,382 46.00 % 36,516 —  —  —  36,516

PT. Bayan Resources TBK

3,693,389 20.00 % 738,678 69,416 —  (76,380 ) 731,714

S-Power Co., Ltd.

410,821 49.00 % 201,302 —  (967 ) —  200,335

Xe-Pian Xe-Namnoy Power Co., Ltd.

405,836 25.00 % 101,459 305 (905 ) (35,247 ) 65,612

Goseong Green Power Co., Ltd.

987,119 29.00 % 286,264 —  (10,179 ) —  276,085

Gangneung Eco Power Co., Ltd.

661,551 29.00 % 191,850 45,212 (9,379 ) —  227,683

Shin Pyeongtaek Power Co., Ltd.

396,068 40.00 % 158,428 3,559 (13,401 ) —  148,586

Dongducheon Dream Power Co., Ltd.

337,182 34.01 % 114,675 1,757 (1,529 ) (12,582 ) 102,321

GS Donghae Electric Power Co., Ltd.

843,518 34.00 % 286,796 —  —  —  286,796

Nepal Water & Energy Development Company Private Limited

290,181 66.12 % 191,868 837 —  —  192,705

Indeck Niles Development, LLC

523,224 50.00 % 261,613 97,643 —  4,419 363,675

Saemangeum Sebit Power Plant Co., Ltd.

68,142 55.00 % 37,480 182 —  —  37,662

PT. Cirebon Energi Prasarana

940,046 10.00 % 94,005 —  —  —  94,005

<Joint ventures>

Shuweihat Asia Power Investment B.V.

167,815 49.00 % 82,230 —  —  —  82,230

KEPCO SPC Power Corporation

199,072 60.00 % 119,443 —  —  —  119,443

Datang Chifeng Renewable Power Co., Ltd.

530,324 40.00 % 212,130 —  —  —  212,130

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

123,752 40.00 % 49,501 —  —  —  49,501

Rabigh Electricity Company

806,056 40.00 % 322,423 —  (35,813 ) (805 ) 285,805

Jamaica Public Service Company Limited

993,028 40.00 % 397,211 29,357 —  (14,291 ) 412,277

Amman Asia Electric Power Company

457,918 60.00 % 274,751 —  —  —  274,751

Chun-cheon Energy Co., Ltd.

123,570 29.90 % 36,948 3 —  (248 ) 36,703

Nghi Son 2 Power LLC

1,133,399 50.00 % 566,700 —  —  —  566,700

Kelar S.A.

230,748 65.00 % 149,986 3,308 —  —  153,294

PT. Tanjung Power Indonesia

280,633 35.00 % 98,221 —  —  —  98,221

Barakah One Company

8,279,442 18.00 % 1,490,300 —  182,207 —  1,672,507

74


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(5)

The financial information of associates and joint ventures reconciled to the Group’s investments in condensed consolidated financial statements as of June 30, 2026 and December 31, 2025 is as follows, continued:

As of December 31, 2025

Investees

Net assets Percentage of
ownership (*)
Share in
net
assets
Investment
differential
Intercompany
transaction
Others Book
value

Daegu Green Power Co., Ltd.

W 94,795 54.24 % 51,416 84 —  (20,381 ) 31,119

Yeonggwang Wind Power Co., Ltd.

62,534 46.00 % 28,766 492 —  —  29,258

South Jamaica Power Company Limited

243,391 20.00 % 48,678 —  —  (3 ) 48,675

RE Holiday Holdings LLC

161,263 50.00 % 80,631 —  —  —  80,631

RE Pioneer Holdings LLC

97,662 50.00 % 48,831 —  —  —  48,831

RE Barren Ridge 1 Holdings LLC

109,651 50.00 % 54,825 —  —  —  54,825

Solar Philippines Calatagan Corporation

115,923 38.00 % 44,050 —  —  17,063 61,113

PT Barito Wahana Tenaga

737,706 30.61 % 225,828 —  —  —  225,828

Cheongna Energy Co., Ltd.

131,509 50.10 % 65,886 3,137 (1,177 ) —  67,846

Naepo Green Energy Co., Ltd.

191,096 29.20 % 55,800 —  —  3,442 59,242

OneEnergy Asia Limited

1,172,226 40.00 % 468,891 25,512 —  —  494,403

Prime Swedish Holding AB

82,178 45.00 % 36,980 1,684 —  —  38,664

Namyangju Combined Heat and Power Co., Ltd.

209,634 70.10 % 146,953 193 —  —  147,146

Trumbull Development Partners, LLC

690,772 56.23 % 388,421 50,847 —  —  439,268
(*)

The percentage of ownership shown above is an effective percentage of ownership including the treasury stocks and others.

(6)

The share of losses of associates and joint ventures that has not been recognized due to the discontinuation of loss recognition as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won
As of June 30, 2026 As of December 31, 2025
Unrecognized
equity interest
Accumulated
unrecognized
equity interest
Unrecognized
equity interest
Accumulated
unrecognized
equity interest

Boim Combined Heat and Power Generation Co., Ltd.

W (5,199 ) 25,918 2,394 31,117

Samcheok Eco Materials Co., Ltd.

(3 ) 5,318 (5 ) 5,321

Barakah One Company

—  —  (174,713 ) — 

KAPES, Inc.

1,332 12,140 6,877 10,808

ITR Co., Ltd.

30 31 (14 ) 1

SEP Co., Ltd.

—  15 —  15

Noeul Green Energy Co., Ltd.

(895 ) 1,506 (1,434 ) 2,401

PlatformN. Co., Ltd.

—  20 2 20

KEPCO KPS CARABAO Corp.

8 184 (68 ) 176

Bitsolar Energy Co., Ltd.

8 1,628 356 1,620

Green Energy Electricity Generation Co., Ltd.

—  —  (396 ) — 

O2&B Global Co., Ltd.

3 23 14 20

Pulau Indah O&M Sdn. Bhd.

—  —  (1 ) — 

Foresight Iberian Solar Group Holding (*2)

(3,988 ) 5,814 5,407 9,802

Green Radiation Co., Ltd.

—  —  (11 ) — 

Hoenggye Renewable Energy Co., Ltd.

—  —  (266 ) — 

CapMan Lynx SCA, SICAR (*1)

—  —  (31,090 ) — 

G.GURU Co., Ltd.

1 3 2 2

International Offshore Power Transmission Holding Company Limited

(76 ) —  76 76

Jeju Gimnyeong Wind Power Co., Ltd.

(76 ) —  76 76

Korea Energy Data Co., Ltd.

(8 ) —  8 8

Wadi Noor Solar Power Company SAOC

3,559 4,270 711 711

Jaeun Resident Wind Power Plant Co., Ltd.

(759 ) —  759 759

75


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(6)

The share of losses of associates and joint ventures that has not been recognized due to the discontinuation of loss recognition as of June 30, 2026 and December 31, 2025 is as follows, continued:

In millions of won
As of June 30, 2026 As of December 31, 2025
Unrecognized
equity interest
Accumulated
unrecognized
equity interest
Unrecognized
equity interest
Accumulated
unrecognized
equity interest

Lucy Equity Holdings, LLC

W (3,538 ) —  3,538 3,538

Remal First Holding Company

(6,008 ) 1,524 7,532 7,532

Naseem First Holding Company

(5,837 ) 2,333 8,170 8,170

KNOC Nigerian East Oil Co., Ltd. (*2)

1,029 14,876 (333 ) 13,847

KNOC Nigerian West Oil Co., Ltd. (*2)

959 13,691 (306 ) 12,732

Siraj AlTaqa AlNazifa

106 106 —  — 

Luluah SKY Energy Holding Ltd.

633 633 —  — 

Chungsongmeon BongSan wind power Co., Ltd.

99 99 —  — 
(*1)

The entity was liquidated during the year ended December 31, 2025.

(*2)

The unrecognized losses arising from the discontinuation of recognition are additionally recognized against the loans that form part of the net investment in the investee.

76


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(7)

As of June 30, 2026, shareholders’ agreements on investments in associates and joint ventures that may cause future economic resource or cash outflows are as follows:

(i)

HORUS SOLAR, S.A. DE C.V.

Provided that the contractual conditions precedent are satisfied, the Group has the right to acquire the 15.6% equity interest held by Canadian Solar at the point when two years have elapsed after the commencement of commercial operation.

(ii)

RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.

Provided that the contractual conditions precedent are satisfied, the Group has the right to acquire the 15.6% equity interest held by Canadian Solar at the point when two years have elapsed after the commencement of commercial operation.

(iii)

SUNMEX RENOVABLES, S.A. DE C.V.

Provided that the contractual conditions precedent are satisfied, the Group has the right to acquire the 15.6% equity interest held by Canadian Solar at the point when two years have elapsed after the commencement of commercial operation.

(iv)

Noeul Green Energy Co., Ltd.

In accordance with the shareholders’ agreement of Noeul Green Energy Co., Ltd., an associate of the Group, the Group has the right to purchase all or part of the preferred shares held by the financial investors at 100% of the issue price from the day following the tenth anniversary of the issue date of the preferred shares.

(v)

Namyangju Combined Heat and Power Co., Ltd.

The Group has an obligation to purchase certain shares from Narae Energy Co., Ltd. at fair value when Narae Energy Co., Ltd. intends to sell its shares in Namyangju Combined Heat and Power Co., Ltd. on the exercise date agreed upon in accordance with the shareholders’ agreement. If Narae Energy Co., Ltd. becomes the largest shareholder by selling, assigning, or transferring shares in accordance with the shareholders’ agreement, the Group is obligated to guarantee the drag-along right that allows Narae Energy Co., Ltd. to sell the shares held by both shareholders under the same conditions.

(vi)

Taebaek Wind Power Co., Ltd.

In the case where non-controlling shareholders decide to dispose of their shares in Taebaek Wind Power Co., Ltd. after the warrant period in the EPC contract of defect repair for wind power generator has expired, the Group acquires those shares at fair value. The acquisition is to be made after the conditions of the acquisition are discussed among the parties involved, with consideration of various factors such as financial status and business situation.

(vii)

Pyeongchang Wind Power Co., Ltd.

In the case where non-controlling shareholders decide to dispose of their shares in Pyeongchang Wind Power Co., Ltd. after commercial operation of the power plant has started, the Group acquires those shares at fair value. The acquisition is to be made after the conditions of the acquisition are discussed among the parties involved, with consideration of various factors such as financial status and business situation.

(viii)

Daeryun Power Co., Ltd.

The Group reserves the right to participate in the transfer of shares in Daeryun Power Co., Ltd. on the same terms as Daeryun E&S Co., Ltd., if Daeryun E&S Co., Ltd. wishes to transfer its shares in Daeryun Power Co., Ltd.

(ix)

Daegu Green Power Co., Ltd.

The Group has a right to purchase all the shares of Daegu Green Power Co., Ltd. held by the financial investors at the yield-based transfer amount agreed with the shareholders. The Group can exercise its right 5, 10 and 13 years after the date of the investment. Also, the Group has a right to purchase all or part of the shares of Daegu Green Power Co., Ltd. held by Lotte Engineering & Construction Co. at the yield-based transfer amount agreed with the shareholders.

77


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(7)

As of June 30, 2026, shareholders’ agreements on investments in associates and joint ventures that may cause future economic resource or cash outflows are as follows, continued:

(x)

Omisan Wind Power Co., Ltd.

The Group has the right to claim Unison Co., Ltd. to transfer its shares in Omisan Wind Power Co., Ltd. either as a whole or as a part after the completion of the power generation complex, and if the Group exercises its right to claim transfer, Unison Co., Ltd. is obliged to transfer such shares at fair value to the Group or a third party designated by the Group.

(xi)

Geumsungsan Wind Power Co., Ltd.

The Group has a right to purchase shares owned by Daemyung Energy Co., Ltd., within the range of 18%, for 3 years after the commencement of the operation. The Group notified the exercise of the right on June 17, 2026, and the purchase price has not been agreed.

(xii)

Taebaek Guinemi Wind Power Co., Ltd.

If shareholders of Taebaek Guinemi Wind Power Co., Ltd. other than the Group intend to sell their shares after the elapse of warranty period for wind power generators specified in the EPC contract, the Group has preferential right to other parties and third parties to take over the shares that the shareholders want to sell at fair value by reaching agreement with the shareholders on the timing of sales and volume of shares to be sold considering the financial conditions, management conditions and others.

(xiii)

HORANG ENERGY Inc.

The Group has the right to purchase all or partial shares of HORANG ENERGY Inc. held by other shareholders after three years have elapsed from the date of commencing the operations under the unanimous agreement of all shareholders. The Group also has an obligation to sell its shares in HORANG ENERGY Inc. either as a whole or as a part to CNcore Co., Ltd. after three years have elapsed from the date of commencing the operations upon the claim of CNcore Co., Ltd., under the unanimous agreement of all shareholders.

(xiv)

Jeongeup Green Power Co., Ltd.

The Group has the right to acquire the shares held by M Eco Co., Ltd. at fair value on the date when it has been third, seventh, and tenth year from the beginning date of commercial operation. However, if M Eco Co., Ltd. transfers its shares to the entity holding the majority of shares in M Eco Co., Ltd., its right to transfer shares to the shareholder prevails the Group’s right to acquire shares from M Eco Co., Ltd.

(xv)

Yeonggwang Wind Power Co., Ltd.

In case the Group intends to purchase all or part of the shares from Daehan Green Energy Co., Ltd., which is a non-controlling shareholder, Daehan Green Energy Co., Ltd. has an obligation to evaluate the shares at fair value and transfer them to the Group.

(xvi)

Seokmun Green Energy

According to the special conditions of the REC trading contract, the Group may demand the sale of ownership stakes held by other investors to the Group, or the investors may acquire new stakes or modify business documents through a capital increase in Seokmun Green Energy with prior written consent from the trustee. In the event that other investors sell their stakes to the Group, they may demand that the Group purchase their stakes in the future if certain conditions are met.

78


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(8)

Significant restrictions on the Group’s abilities on associates and joint ventures as of June 30, 2026 are as follows:

Company

Nature and extent of any significant restrictions

Nepal Water & Energy Development Company Private Limited

The Group must maintain a minimum percentage of ownership (50%) until the project completion date and thereafter.

Goseong Green Power Co., Ltd.

Shares cannot be either wholly or partially transferred before the final completion date of the project without the consent of the stakeholders.

Gangneung Eco Power Co., Ltd.

Shares cannot be either wholly or partially transferred until two years have elapsed from the final completion date of the project without the consent of the stakeholders.

S-Power Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior consent of the stakeholders.

Dongducheon Dream Power Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid only when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Haeng Bok Do Si Photovoltaic Power Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior consent of the stakeholders.

Shin Pyeongtaek Power Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Seoroseoro Sunny Power Plant Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Anjwa Smart Farm & Solar City Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Muan Solar Park Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions.

YuDang Solar Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Haemodum Solar Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of the financial institutions is obtained. Also, shares cannot be wholly or partially transferred without the prior written consent of the financial institutions.

79


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(8)

Significant restrictions on the Group’s abilities on associates or joint ventures as of June 30, 2026 are as follows, continued:

Company

Nature and extent of any significant restrictions

Cheongna Energy Co., Ltd.

Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions.

Hapcheon Floating Photovoltaic Power Plant Inc.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Yeongwol Eco Wind Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Gurae Resident Power Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Gunsan Land Solar Co., Ltd.

Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained. When the internal rate of return defined in shareholders’ agreement is met, any excessive dividend income must be provided to Gunsan City.

Eumseong Eco Park Co., Ltd.

Dividends and settlement amounts for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions.

PungBack Wind Farm Corporation

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Seobusambo highway photovoltaics Co., Ltd.

Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.

Daegu Green Power Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of financial institutions.

Pyeongchang Wind Power Co., Ltd.

Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions.

Daeryun Power Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions. Shares cannot be wholly or partially transferred without prior consent of the financial institutions.

80


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(8)

Significant restrictions on the Group’s abilities on associates or joint ventures as of June 30, 2026 are as follows, continued:

Company

Nature and extent of any significant restrictions

KNH Solar Co., Ltd.

Shares cannot be wholly or partially transferred without the prior written consent of other shareholders.

Korea Power Engineering Service Co., Ltd.

Shares cannot be wholly or partially transferred without the consent of the board of directors.

Daehan Wind Power PSC

Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.

Daejung Offshore Wind Power Co., Ltd.

Before the commencement of the operation period of the project, shares cannot be wholly or partially transferred without the consent of other shareholders. Also, dividends can only be paid when the conditions of the shareholders’ agreement are satisfied.

Naepo Green Energy Co., Ltd.

Dividends can only be paid to shareholders when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior consent of interested parties. All or part of the stocks held cannot be transferred without the written consent of the financial institution and if the conditions for the O&M utilization rate are not met or if a payment deferment is necessary due to the fulfillment of the obligation to provide funds, the contract amount will be paid in a subordinated order.

Solaseado Solar Power Co., Ltd.

Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of other stakeholders including shareholders and financial institutions.

Samcheok Eco Materials Co., Ltd.

Dividends can only be paid when all conditions of the shareholders’ agreement are satisfied. Also, shares cannot be wholly or partially transferred without the written consent of the other shareholders.

Taebaek Guinemi Wind Power Co., Ltd.

Dividends can only be paid when all conditions of the loan agreement are satisfied and consent of the financial institutions is obtained. Also, shares cannot be wholly or partially transferred without the written consent of the financial institutions.

Indeck Niles Asset Management, LLC

Shares cannot be wholly or partially transferred without the consent of the stakeholders.

Indeck Niles Development, LLC

Shares cannot be wholly or partially transferred without the consent of the stakeholders.

Chester Solar IV SpA

Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.

Chester Solar V SpA

Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.

Diego de Almagro Solar SpA

Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.

Laurel SpA

Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.

81


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(8)

Significant restrictions on the Group’s abilities on associates or joint ventures as of June 30, 2026 are as follows, continued:

Company

Nature and extent of any significant restrictions

Chester Solar I SpA Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Kelar S.A. Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Omisan Wind Power Co., Ltd. Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without the consent of the stakeholders including other shareholders and financial institutions. Also, either of Korea Southern Power Co., Ltd., a subsidiary of the Group, and Unison Co., Ltd. shall not transfer their shares to others wholly or partially until 4 years have passed from the completion of power complex without the written consent from the other party. In case the shares of each party become less than 10% of outstanding shares after the transfer, it also requires the written consent from the other party.
Geumsungsan Wind Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred for 3 years after the commencement of operation, and also cannot be transferred or disposed to the third party in a way not permitted in the financial documents without prior written consent of the financial instituitions.
Trumbull Asset Management, LLC Shares cannot be either wholly or partially transferred without the consent of the stakeholders.
HORANG ENERGY Inc. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred before three years have passed after the commencement of operation, and also cannot be transferred or disposed to the third party in a way not permitted in the financial documents without prior written consent of an agent bank.
Haman Green Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. In addition, the Group cannot transfer all or part of its shares without the consent of other shareholders until five years have elapsed from the date of issuance of the acquisition notice after the comprehensive completion of the EPC contract for the project, and shares cannot be wholly or partially transferred without prior written consent of the financial institutions.
Jeongeup Green Power Co., Ltd. Dividends to investors are only possible when the conditions in the loan agreement are met or prior written consent from the financial institution is obtained, and subordinated loans cannot be paid to investors before the loan principal and interest are fully repaid. Additionally, all or part of the shares held cannot be transferred without the consent of other shareholders before the commencement of commercial operation of this business. The entity’s stocks may not be transferred to a third party or otherwise disposed of in a manner not permitted in the financial documents without the prior written consent of the agent bank.
Rutile BESS Holdings, LLC Shares cannot be either wholly or partially transferred without prior written consent of other stakeholders.
HyChangwon Fuel Cell. Co., Ltd. Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. In addition, the Group cannot transfer all or part of its shares until five years have elapsed from the date of issuance of the acquisition notice. Shares cannot be wholly or partially transferred without obtaining prior written consent of the financial institutions.
Roof One Energy Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be wholly or partially transferred without obtaining prior consent of the stakeholders.
Namjeju Bitdream Energy Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Cheonwang Green Energy Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Haetbyeotgil Solar Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be wholly or partially transferred without obtaining prior consent of the stakeholders.

82


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(8)

Significant restrictions on the Group’s abilities on associates or joint ventures as of June 30, 2026 are as follows, continued:

Company

Nature and extent of any significant restrictions

Luluah SKY Energy Holding Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement are satisfied. Shares cannot be wholly or partially transferred without obtaining prior consent of the stakeholders.
Balgeun Jindo Energy Storage Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior consent of the stakeholders.
Goheung Naro Energy Storage Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior consent of the stakeholders. Unless all conditions of the loan agreement are satisfied, no payment in violation of the subordination terms, including repayment of subordinated loans, can be made.
Goheung New Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of the financial institutions is obtained.
GS Donghae Electric Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Honam Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied.
Seokmun Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when written consent of financial institutions is obtained.
Chun-cheon Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, principals and interests on subordinated loans shall not be paid until the payment conditions are satisfied.
Yeonggwangbaeksu Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when written consent of financial institutions is obtained.
Yeonggwang Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Jamaica Public Service Company Limited Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
PT. Tanjung Power Indonesia Dividends can only be paid when all conditions of the loan agreement are satisfied.
Daesan Green Energy Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Taebaek Gadeoksan Wind Power Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when prior written consent of financial institutions is obtained.

83


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

17.

Investments in Associates and Joint Ventures, Continued

(8)

Significant restrictions on the Group’s abilities on associates or joint ventures as of June 30, 2026 are as follows, continued:

Company

Nature and extent of any significant restrictions

Bitsolar Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied.
Yangyang Wind Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Busan Industrial Solar Power Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
KPE Green Energy Co., Ltd. Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Cheongju Eco Park Co., Ltd. Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied, or permitted by related financing contracts, or prior written consent of financial institutions is obtained.
Seokmun Green Energy Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Hoenggye Renewable Energy Co., Ltd. Dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained.
Busan Shinho Solar Power Co., Ltd. Dividends can only be paid when all conditions prescribed in the loan agreement entered into with the financial institutions are satisfied.
Kumyang Eco Park Co., Ltd. Dividends and payables from settlement for renewable energy certificates can only be paid when all conditions of the loan agreement are satisfied or a prior written consent of financial institutions is obtained.
Yanggu Floating Photovoltaic Power Plant Inc. Payment of dividends or repayment of loans such as subordinated loans to the investors can be made only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
South Jamaica Power Company Limited Dividends can be paid only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Amaala Sustainable Company for Energy Dividends may be payable only when all conditions prescribed in the loan agreement between Amaala Sustainable Company for Energy LLC and financial institution are satisfied.
Jeju Bukchon BES Power Co., Ltd. Interest payments on shareholder loans, dividends to investors and capital reduction with consideration are only possible when all conditions of the loan agreement are satisfied or prior written consent of the financial institutions is obtained.

84


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

18.

Property, Plant and Equipment

(1)

Property, plant and equipment as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Acquisition cost Government
grants
Accumulated
depreciation
Accumulated
impairment

losses
Book
value

Land

W 15,072,760 (27,391 ) —  (33,980 ) 15,011,389

Buildings

28,120,700 (36,143 ) (14,296,389 ) (7,120 ) 13,781,048

Structures

95,590,435 (144,448 ) (42,001,917 ) (18,678 ) 53,425,392

Machinery

130,098,386 (91,532 ) (73,294,506 ) (546,009 ) 56,166,339

Ships

17,870 —  (10,130 ) —  7,740

Vehicles

557,340 (2,790 ) (421,366 ) (164 ) 133,020

Equipment

2,740,426 (938 ) (2,273,962 ) (904 ) 464,622

Tools

1,523,196 (815 ) (1,339,547 ) (1 ) 182,833

Construction-in-progress

39,672,979 (233,939 ) —  (22,795 ) 39,416,245

Right-of-use assets

5,485,196 —  (2,956,346 ) (23 ) 2,528,827

Asset retirement costs

18,493,381 —  (9,610,558 ) (146,423 ) 8,736,400

Others

19,176,921 —  (16,632,356 ) (156 ) 2,544,409
W 356,549,590 (537,996 ) (162,837,077 ) (776,253 ) 192,398,264
In millions of won As of December 31, 2025
Acquisition cost Government
grants
Accumulated
depreciation
Accumulated
impairment

losses
Book
value

Land

W 14,867,112 (27,392 ) —  (30,756 ) 14,808,964

Buildings

27,544,929 (38,077 ) (13,779,225 ) (7,119 ) 13,720,508

Structures

93,340,759 (149,558 ) (40,552,716 ) (18,678 ) 52,619,807

Machinery

126,564,408 (94,337 ) (70,384,493 ) (546,317 ) 55,539,261

Ships

17,870 —  (9,199 ) —  8,671

Vehicles

538,604 (2,683 ) (402,753 ) (116 ) 133,052

Equipment

2,641,393 (1,868 ) (2,191,439 ) (376 ) 447,710

Tools

1,495,250 (982 ) (1,305,965 ) (1 ) 188,302

Construction-in-progress

36,779,508 (230,573 ) —  (22,795 ) 36,526,140

Right-of-use assets

5,441,389 —  (2,809,452 ) —  2,631,937

Asset retirement costs

18,347,513 —  (9,302,981 ) (146,422 ) 8,898,110

Others

18,380,931 —  (16,151,855 ) —  2,229,076
W 345,959,666 (545,470 ) (156,890,078 ) (772,580 ) 187,751,538

85


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

18.

Property, Plant and Equipment, Continued

(2)

Changes in property, plant and equipment for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Acquisition Disposal Depreciation Impairment Others Ending
balance

Land

W 14,836,356 10,647 (411 ) —  (825 ) 193,013 15,038,780

(Government grants)

(27,392 ) —  1 —  —  —  (27,391 )

Buildings

13,758,585 4,158 (5,894 ) (513,638 ) —  573,980 13,817,191

(Government grants)

(38,077 ) —  —  1,934 —  —  (36,143 )

Structures

52,769,365 15,444 (119,410 ) (1,535,071 ) —  2,439,512 53,569,840

(Government grants)

(149,558 ) —  266 4,849 —  (5 ) (144,448 )

Machinery

55,633,598 264,329 (82,356 ) (3,258,158 ) —  3,700,458 56,257,871

(Government grants)

(94,337 ) (272 ) 60 6,777 —  (3,760 ) (91,532 )

Ships

8,671 —  —  (931 ) —  —  7,740

Vehicles

135,735 3,381 (19 ) (29,879 ) —  26,592 135,810

(Government grants)

(2,683 ) (162 ) 2 691 —  (638 ) (2,790 )

Equipment

449,578 65,610 (523 ) (106,086 ) —  56,981 465,560

(Government grants)

(1,868 ) —  —  1,060 —  (130 ) (938 )

Tools

189,284 8,797 (18 ) (40,694 ) —  26,279 183,648

(Government grants)

(982 ) —  —  227 —  (60 ) (815 )

Construction-in-progress

36,756,713 9,531,359 (23 ) (59 ) —  (6,637,806 ) 39,650,184

(Government grants)

(230,573 ) (7,668 ) —  —  —  4,302 (233,939 )

Right-of-use assets

2,631,937 72,587 (10,328 ) (223,134 ) —  57,765 2,528,827

Asset retirement costs

8,898,110 21 —  (582,819 ) —  421,088 8,736,400

Others

2,229,076 3,321 —  (487,945 ) —  799,957 2,544,409
W 187,751,538 9,971,552 (218,653 ) (6,762,876 ) (825 ) 1,657,528 192,398,264

86


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

18.

Property, Plant and Equipment, Continued

(2)

Changes in property, plant and equipment for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows, continued:

In millions of won For the year ended December 31, 2025
Beginning
balance
Acquisition Disposal Depreciation Impairment Others Ending
balance

Land

W 14,548,055 3,397 (14,757 ) —  —  299,661 14,836,356

(Government grants)

(27,403 ) —  11 —  —  —  (27,392 )

Buildings

13,397,461 29,671 (27,419 ) (1,008,638 ) (16 ) 1,367,526 13,758,585

(Government grants)

(41,718 ) —  4 3,937 —  (300 ) (38,077 )

Structures

51,792,939 8,593 (304,274 ) (3,015,461 ) —  4,287,568 52,769,365

(Government grants)

(149,737 ) —  687 9,552 —  (10,060 ) (149,558 )

Machinery

56,955,731 478,592 (238,182 ) (6,371,551 ) (14,246 ) 4,823,254 55,633,598

(Government grants)

(105,546 ) (1,150 ) 384 15,011 —  (3,036 ) (94,337 )

Ships

10,534 —  —  (1,863 ) —  —  8,671

Vehicles

81,451 5,967 (108 ) (49,732 ) —  98,157 135,735

(Government grants)

(2,745 ) (484 ) 6 1,309 —  (769 ) (2,683 )

Equipment

438,096 88,908 (166 ) (212,174 ) —  134,914 449,578

(Government grants)

(3,915 ) (19 ) —  2,119 —  (53 ) (1,868 )

Tools

173,736 36,172 (48 ) (78,791 ) —  58,215 189,284

(Government grants)

(1,306 ) —  —  437 —  (113 ) (982 )

Construction-in-progress

31,284,358 15,755,397 (65 ) —  —  (10,282,977 ) 36,756,713

(Government grants)

(223,566 ) (21,758 ) —  —  —  14,751 (230,573 )

Right-of-use assets

3,046,396 100,430 (5,876 ) (477,663 ) —  (31,350 ) 2,631,937

Asset retirement costs

9,748,444 —  —  (1,437,687 ) —  587,353 8,898,110

Others

2,061,498 2,850 —  (1,007,904 ) —  1,172,632 2,229,076
W 182,982,763 16,486,566 (589,803 ) (13,629,099 ) (14,262 ) 2,515,373 187,751,538
(3)

For the six-month period ended June 30, 2026, the Group’s subsidiaries including Korea Hydro & Nuclear Power Co., Ltd. recognized proceeds and costs from selling items produced before the assets’ intended use. As a result, W85,320 million (W331 million for the six-month period ended June 30, 2025) was recognized as revenue and W113,853 million (W669 million for the six-month period ended June 30, 2025) was recognized as cost of sales in profit or loss, respectively.

87


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2025 and 2024 (unaudited)

19.

Investment Properties

(1)

Investment properties as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Acquisition cost Government grants Accumulated
depreciation
Book
value

Land

W 173,627 —  —  173,627

Buildings

28,249 (21 ) (16,259 ) 11,969
W 201,876 (21 ) (16,259 ) 185,596
In millions of won As of December 31, 2025
Acquisition cost Government grants Accumulated
depreciation
Book
value

Land

W 218,041 —  —  218,041

Buildings

38,311 (22 ) (17,558 ) 20,731
W 256,352 (22 ) (17,558 ) 238,772
(2)

Changes in investment properties for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning balance Disposal Depreciation Others Ending
balance

Land

W 218,041 —  —  (44,414 ) 173,627

Buildings

20,753 —  (474 ) (8,289 ) 11,990

(Government grants)

(22 ) —  1 —  (21 )
W 238,772 —  (473 ) (52,703 ) 185,596
In millions of won For the year ended December 31, 2025
Beginning balance Disposal Depreciation Others Ending
balance

Land

W 210,509 —  —  7,532 218,041

Buildings

18,497 —  (1,082 ) 3,338 20,753

(Government grants)

(22 ) —  —  —  (22 )
W 228,984 —  (1,082 ) 10,870 238,772

88


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

19.

Investment Properties, Continued

(3)

Income and expenses related to investment properties for the six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Rental income

W 3,282 6,417 2,694 5,478

Operating and maintenance expenses related to rental income

(222 ) (484 ) (317 ) (518 )
W 3,060 5,933 2,377 4,960

(4)   Fair values of investment properties as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Book value Fair value Book value Fair value

Land

W 173,627 291,433 218,041 363,922

Buildings

11,969 12,515 20,731 24,126
W 185,596 303,948 238,772 388,048

The Group determined the fair value of investment property on the transition date based on valuations conducted by an independent valuation firm that is independent of the Group. The valuation firm has appropriate qualifications and experience in the valuation of real estate in the Republic of Korea, and the valuation was conducted using a comparison method, which is a method of obtaining economic value based on the marketability of the property. The fair values of the investment properties as of the reporting date were determined in consideration of the fluctuation on the publicly announced individual land price after the KIFRS transition date (January 1, 2010).

(5)

All of the Group’s investment properties are held under freehold interests.

89


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

20.

Construction Contracts

(1)

Changes in the total contract amount in which revenue is not yet recognized for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Increase
(decrease) (*)
Recognized as
revenue
Ending
balance

Nuclear power plant construction in overseas and others

W 34,187,761 1,965,472 (470,018 ) 35,683,215
(*)

For the six-month period ended June 30, 2026, the increased balance of contracts from new orders is W1,974,311 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is W8,839 million.

In millions of won For the year ended December 31, 2025
Beginning
balance
Increase
(decrease) (*)
Recognized as
revenue
Ending
balance

Nuclear power plant construction in overseas and others

W 6,136,773 28,724,681 (673,693 ) 34,187,761
(*)

For the year ended December 31, 2025, the increased balance of contracts from new orders is W29,718,160 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is W993,479 million.

(2)

Accumulated earned revenue, expense and others related to the Group’s construction contracts in progress as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Accumulated
earned revenue
Accumulated
expense
Accumulated
Profit (loss)
Unearned
advance receipts

Nuclear power plant construction in overseas and others

W 24,359,393 25,847,333 (1,487,940 ) 108,743
In millions of won As of December 31, 2025
Accumulated
earned revenue
Accumulated
expense
Accumulated
profit
Unearned
advance receipts

Nuclear power plant construction in overseas and others

W 23,954,612 25,468,062 (1,513,450 ) 102,359

90


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

20.

Construction Contracts, Continued

(3)

The gross amounts due from customers recognized as contract assets and due to customers recognized as contract liabilities for contract works as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Contract assets
(*1)
Contract liabilities
(*2)
Contract assets
(*1)
Contract liabilities
(*2)

Nuclear power plant construction in overseas and others

W 764,623 371,097 538,057 363,521
(*1)

Included in trade and other receivables, net, in the consolidated statements of financial position.

(*2)

Included in non-financial liabilities as advance received in the consolidated statements of financial position. The revenue recognized for the six-month period ended June 30, 2026 from the amounts included in contract liabilities at the end of the prior year was W177,051 million.

(4)

The contracts with customers state that the disclosure of information related to the UAE nuclear power plant project, the Egypt Eldaba nuclear power plant construction project, the Romania Cernavodă Unit 1 refurbishment project and the Czech Dukovany Units 5 and 6 new nuclear power plant project, such as rate of progress, unbilled construction, impairment losses, etc., is not allowed without consent from the customers. The customers did not agree to disclose such information. Accordingly, the Group did not disclose such information based on KIFRS 1115 129.2(2) as it is probable that the purchasers may file a lawsuit for breach of contract if the Group does so. Also, the Group reported to the audit committee of each project company that those items will not be disclosed in the notes to the condensed consolidated financial statements.

Contract date Completion date

Egypt Eldaba nuclear power plant construction projects

August 25, 2022 April 8, 2029

Romania Cernavodă Unit 1 refurbishment project

December 19, 2024 June 15, 2030

Czech Dukovany Units 5 and 6 new nuclear power plant project (*)

June 17, 2025 — 
(*)

The completion date of the Czech Dukovany nuclear power plant project is information excluded from disclosure in accordance with the laws of the relevant country.

(5)

The Group is in discussion with the contracting parties about the prolongation costs and liquidated damages for the UAE nuclear power plant project. As of June 30, 2026, the Group recognized the amount of estimated outflow of resources embodying economic benefits related to the prolongation costs as provisions.

91


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

20.

Construction Contracts, Continued

(6)

The operating segment information related to the contracts for which the Group recognizes revenue based on the percentage-of-completion on a cost-based input method for the six-month period ended June 30, 2026 is as follows:

In millions of won For the six-month period ended June 30, 2026
Effect from changes in accounting estimates Contract assets from
construction contracts
Trade receivables from
construction
contracts
Expected
loss on
construction
contracts
The effect on
profit or loss
of changes in
estimates of
contract
revenue and
contract
costs
Amounts
recognized in
current

profit or loss
Amounts to be
recognized in
future profit
or loss
Changes in
estimated total
contract costs
Revenue
recognized from
performance

obligations satisfied
in previous periods
Gross Allowance
for doubtful
accounts
Gross Allowance
for doubtful
accounts

Transmission and distribution

W 16,473 (168,024 ) (168,058 ) 34 46,794 —  320,732 —  —  — 

Electric power generation (Nuclear)

1,270,441 1,186,731 172,448 1,014,283 624,135 —  355,867 —  45,911 — 

Plant maintenance & engineering Service and others

1,691 106,076 (1,892 ) 107,968 (54,192 ) 5,485 80,168 4 34,558 5,600

Others

—  —  —  —  —  —  7,856 —  13,504 50
W 1,288,605 1,124,783 2,498 1,122,285 616,737 5,485 764,623 4 93,973 5,650

92


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

21.

Intangible Assets other than Goodwill

(1)

Intangible assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Acquisition cost Government
grants
Accumulated
amortization
Accumulated
impairment
losses
Book
value

Software

W 1,271,193 (599 ) (1,103,716 ) (1,134 ) 165,744

Copyrights, patents rights and other industrial rights

57,919 —  (43,373 ) —  14,546

Mining rights

689,292 —  (19,009 ) (661,053 ) 9,230

Development expenditures

1,041,144 (394 ) (978,607 ) —  62,143

Intangible assets under development

114,208 (5,673 ) —  —  108,535

Usage rights of donated assets and others

622,647 —  (477,042 ) (136 ) 145,469

Leasehold rights

28,185 —  (26,265 ) (538 ) 1,382

Greenhouse gas emissions rights

127,456 —  —  —  127,456

Others

644,243 (90 ) (225,121 ) (12,173 ) 406,859
W 4,596,287 (6,756 ) (2,873,133 ) (675,034 ) 1,041,364
In millions of won As of December 31, 2025
Acquisition cost Government
grants
Accumulated
amortization
Accumulated
impairment
losses
Book
value

Software

W 1,237,800 (804 ) (1,064,876 ) (19 ) 172,101

Copyrights, patents rights and other industrial rights

57,100 —  (42,168 ) —  14,932

Mining rights

626,449 —  (16,125 ) (601,636 ) 8,688

Development expenditures

1,033,744 (540 ) (965,175 ) —  68,029

Intangible assets under development

125,687 (5,044 ) —  —  120,643

Usage rights of donated assets and others

602,139 —  (470,762 ) (136 ) 131,241

Leasehold rights

28,185 —  (25,959 ) (538 ) 1,688

Greenhouse gas emissions rights

108,300 —  —  —  108,300

Others

631,396 (136 ) (243,363 ) (12,224 ) 375,673
W 4,450,800 (6,524 ) (2,828,428 ) (614,553 ) 1,001,295

93


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

21.

Intangible Assets other than Goodwill, Continued

(2)

Changes in intangible assets for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Acquisition Disposal Amortization Impairment Others Ending balance

Software

W 172,905 13,688 (1 ) (41,013 ) (1,115 ) 21,879 166,343

(Government grants)

(804 ) —  —  222 —  (17 ) (599 )

Copyrights, patents rights and other industrial rights

14,932 56 —  (1,049 ) —  607 14,546

Mining rights

8,688 —  —  (220 ) —  762 9,230

Development expenditures

68,569 —  —  (13,502 ) —  7,470 62,537

(Government grants)

(540 ) —  —  146 —  —  (394 )

Intangible assets under development

125,687 28,654 —  —  —  (40,133 ) 114,208

(Government grants)

(5,044 ) (683 ) —  —  —  54 (5,673 )

Usage rights of donated assets and others

131,241 —  —  (6,308 ) —  20,536 145,469

Leasehold rights

1,688 —  —  (306 ) —  —  1,382

Greenhouse gas emissions rights

108,300 26,131 —  —  —  (6,975 ) 127,456

Others

375,809 1,635 (172 ) (12,335 ) 47 41,965 406,949

(Government grants)

(136 ) —  —  46 —  —  (90 )
W 1,001,295 69,481 (173 ) (74,319 ) (1,068 ) 46,148 1,041,364
In millions of won For the year ended December 31, 2025
Beginning
balance
Acquisition Disposal Amortization Impairment Others Ending balance

Software

W 179,989 23,008 (2,267 ) (89,309 ) 40 61,444 172,905

(Government grants)

(844 ) —  —  342 —  (302 ) (804 )

Copyrights, patents rights and other industrial rights

26,631 389 (12 ) (4,937 ) (8,348 ) 1,209 14,932

Mining rights

29,422 30 (972 ) (1,569 ) —  (18,223 ) 8,688

Development expenditures

73,673 —  —  (27,901 ) —  22,797 68,569

(Government grants)

(939 ) —  —  496 —  (97 ) (540 )

Intangible assets under development

87,641 76,900 —  —  (30 ) (38,824 ) 125,687

(Government grants)

(3,473 ) (1,608 ) —  —  —  37 (5,044 )

Usage rights of donated assets and others

133,379 —  —  (11,599 ) —  9,461 131,241

Leasehold rights

2,431 —  —  (743 ) —  —  1,688

Greenhouse gas emissions rights

135,534 1,523 —  —  —  (28,757 ) 108,300

Others

383,703 2,251 (1,350 ) (23,483 ) (58 ) 14,746 375,809

(Government grants)

(229 ) —  —  93 —  —  (136 )
W 1,046,918 102,493 (4,601 ) (158,610 ) (8,396 ) 23,491 1,001,295

94


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

21.

Intangible Assets other than Goodwill, Continued

(3)

Significant specific intangible assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won and thousands of Australian dollars

As of June 30, 2026

Type

Description

Currency

Amount

Remaining useful lives

Software

S/4HANA ERP license KRW 2,077 1 year and 5 months

Mining rights

Mining rights of Bylong mine AUD —  —  (*1)

Usage rights of donated assets and others

Sejong Haengbogdosi sharing channel contributions KRW 1,891 5 months
Songdo International City sharing channel contributions KRW 4,217 4 years

Others

Occupancy and use of public waters KRW 57,272 10 years and 7 months
Greenhouse gas emissions rights KRW 127,456 — 
Business rights KRW 172,234 29 years and 11 months

(*1)  The carrying amount of mining rights is nil, because KEPCO Australia Pty., Ltd. and KEPCO Bylong Australia Pty., Ltd. had recognized impairment losses in full.

In millions of won and thousands of Australian dollars

As of December 31, 2025

Type

Description

Currency

Amount

Remaining useful lives

Software

S/4HANA ERP license KRW 2,810 1 year and 11 months

Mining rights

Mining rights of Bylong mine AUD —  —  (*1)

Usage rights of donated assets and others

Sejong Haengbogdosi sharing channel contributions KRW 4,159 11 months
Songdo International City sharing channel contributions KRW 4,745 4 years and 6 months

Others

Occupancy and use of public waters KRW 59,977 11 years and 1 month
Greenhouse gas emissions rights KRW 108,300 — 
Business rights KRW 143,216 24 years and 11 months

(*1)  The carrying amount of mining rights is nil, because KEPCO Australia Pty., Ltd. and KEPCO Bylong Australia Pty., Ltd. had recognized impairment losses in full.

(4)   For the six-month periods ended June 30, 2026 and 2025, the Group recognized research and development expenses of W349,784 million and W357,110 million, respectively.

95


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

22.

Trade and Other Payables

Trade and other payables as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Trade payables

W 4,403,067 —  3,543,008 — 

Non-trade payables

2,820,120 1,352,772 2,413,056 1,298,781

Accrued expenses

2,227,319 40,547 2,066,595 39,309

Leasehold deposits received

3,645 2,691 5,448 956

Other deposits received

86,622 43,486 82,116 38,788

Lease liabilities

525,094 2,609,621 510,105 2,640,775

Dividends payable

234 —  1,319 — 

Others (*1)

25 8,336 24 10,199
W 10,066,126 4,057,453 8,621,671 4,028,808
(*1)

Details of others in trade and other payables as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Advance received from local governments

W —  2,689 —  2,689

Others

25 5,647 24 7,510
W 25 8,336 24 10,199

96


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities

(1)

Borrowings and debt securities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Current liabilities

Short-term borrowings

W 11,302,132 9,979,420

Current portion of long-term borrowings

10,072,961 8,744,156

Current portion of debt securities

29,296,661 27,173,916

Less: current portion of discount on long-term borrowings

(1,977 ) (2,054 )

Less: current portion of discount on debt securities

(9,937 ) (8,468 )
50,659,840 45,886,970

Non-current liabilities

Long-term borrowings

3,243,028 3,317,261

Debt securities

79,619,192 80,769,677

Less: discount on long-term borrowings

(36,655 ) (42,487 )

Less: discount on debt securities

(168,462 ) (162,129 )
82,657,103 83,882,322
W 133,316,943 129,769,292
(2)

Repayment schedules of borrowings and debt securities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

As of June 30, 2026

Type

Borrowings Debt Securities

Less than 1 year

W 21,375,093 29,296,661

1~ 5 years

1,173,806 59,651,193

More than 5 years

2,069,222 19,967,999
W 24,618,121 108,915,853
In millions of won

As of December 31, 2025

Type

Borrowings Debt Securities

Less than 1 year

W 18,723,576 27,173,916

1~ 5 years

1,268,982 59,991,872

More than 5 years

2,048,279 20,777,805
W 22,040,837 107,943,593

97


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(3)

Short-term borrowings as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won and thousands of USD

As of June 30, 2026

Type

Creditor

Interest rate (%)

Maturity Foreign
currency
Local
currency

Local short-term borrowings

Yuanta Securities and others

2.81 ~ 4.31
2026.07.01 ~
2027.04.25

—  W 8,256,000

Local short-term borrowings

Nonghyup Bank and others

3M CD + 0.46 ~ 2.90
2026.07.04 ~
2027.06.24

—  2,604,500

Foreign short-term borrowings

Hana Bank and others

SOFR(1M) + 0.40 ~ 0.90
2026.08.11 ~
2026.11.25

USD 49,224 75,879

Local bank overdrafts

Korea Development Bank

3.37
2026.07.01 ~

2026.07.07


—  100,000

Local bank overdrafts

Nonghyup Bank

3.53 2026.07.01 —  195,000

Local bank overdrafts

Nonghyup Bank

MOR + 0.48

3.72

2026.07.01 —  70,753
W 11,302,132
In millions of won and thousands of USD

As of December 31, 2025

Type

Creditor

Interest rate (%)

Maturity Foreign
currency
Local
currency

Local short-term borrowings

Yuanta Securities and others

2.82 ~ 3.65
2026.01.02 ~
2026.05.18

—  W 7,018,433

Local short-term borrowings

Nonghyup Bank and others

3M CD + 0.62 ~ 0.80
2026.05.27 ~
2026.07.11

—  2,600,000

Local short-term borrowings

Korea Development Bank

short-term loan base rate + 1.03 2026.02.24 —  30,000

Local short-term borrowings

The Export-Import Bank of Korea

2.97 ~ 3.30
2026.09.18 ~
2026.12.29

—  30,000

Foreign short-term borrowings

Hana Bank and others

SOFR(1M) + 0.40 ~ 0.90
2026.08.11 ~
2026.11.25

USD 49,165 70,547

Local bank overdrafts

Nonghyup Bank

3.26 2026.01.08 —  183,300

Local bank overdrafts

Hana Bank

1yr bank debenture rate + 1.07 2026.10.31 —  47,140
W 9,979,420

98


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(4)

Long-term borrowings as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

As of June 30, 2026

Type

Interest rate (%) Maturity Foreign
currency
Local
currency

Local long-term borrowings

Korea Development Bank

Rural development fund loans 0.50 2026~2044 —  W 940
Facility loans 4.60~4.94 2028~2042 —  44,395
Facility loans CB rate+0.90 2029 —  6,463

Hana Bank and others

Commercial paper 3M CD + 0.25~1.20 2026~2030 —  9,750,000
Facility loans 4.60 2028 —  2,905
Facility loans 3yr KTB rate-1.25 2026~2028 —  1,495

The Export-Import Bank of Korea

Facility loans 1.32 2027~2028 —  40,000
Operating funds 3M KEXIM bond
rate+0.66
2026 —  50,000

Korea Energy Agency

Development of overseas resources 3yr KTB rate-2.25 1.75 2028 —  6,076
Project loans 0.00 2033 —  1,197

Shinhan Bank and others

Facility loans CB rate+0.90~1.10 2028~2029 —  8,881

Others

3.95 2034 —  58,778

Others

base rate+1.00 2034 —  58,778

Kookmin Bank

Facility loans 4.58~4.93 91-day CD
rate+1.79
2030~2037 —  156,880

Woori Bank

Facility loans 3M CD+1.90 base
rate+1.60 4.93
2034~2042 —  90,065

IBK

Facility loans 4.00~5.80 2042~2044 —  30,690

Nonghyup Bank

Facility loans 4.58~4.68 2030~2041 —  39,093

Others

Facility loans 3.30~6.80 2028~2042 —  743,777

Facility loans

CB rate+1.10 1.75~4.68 2028~2041 —  18,297

Others

4.40~7.90 2038~2039 —  62,037

Others

2.10~5.41 2031~2034 —  49,817
W 11,220,564

99


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(4)

Long-term borrowings as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won and thousands of foreign currencies

As of June 30, 2026

Type

Interest rate (%) Maturity Foreign
currency
Local
currency

Foreign long-term borrowings

Korea Energy Agency

Project loans —  2026 USD 8,744 W 13,478

The Export-Import Bank of Korea and others

Export-Import Bank

of Korea and others

Fixed+compound SOFR
1.80~3.20
2036 USD 62,064 95,671
Export-Import Bank of Korea and others 6M Synthetic Libor
+2.25~3.70
2027 USD 10,305 15,885
Facility loans TermSOFR(3M)+
26.161bps(adj)+197.5bps
2028 USD 81,858 126,184
Facility loans SOFR+0.43~1.83 2029~2031 USD 121,727 187,643
Facility loans SOFR+0.78 2029 SAR 221,310 90,845

POSCO E&C and others

Shareholder’s Loan 8.00 2026 USD 3,228 4,976
Shareholder’s Loan 8.00 2031 USD 6,845 10,551

NH-Amundi

Syndicated Loan 8.00 2032 JPY 456,419 4,345

SMTB

Syndicated Loan ((0.55%+TIBOR
6M)×40%)+
(1.8225%×60%)
2036 JPY5,605,985 53,368

Kiwoom Solar Power Professional Investor Private Placement Investment Trust V

Senior borrowing 3.90 2029 EUR 36,196 63,744

MUFG Bank and others

Facility loans SOFR(3M)+1.50
SOFR(6M)+CAS+5.00
5.08~5.53
2027~2049 USD 678,641 1,046,125

Hanwha US Solar Private Fund 1 and others

Facility loans 6.00 2038 USD 61,239 94,400

Shinhan Bank

Facility loans 1M BBSY+1.40~2.25 2026 AUD 223,472 237,280

Nonghyup Bank and others

Facility loans 10.40 2039 USD 33,038 50,930
W 2,095,425
W 13,315,989

Less: discount on long-term borrowings

(38,632 )

Less: current portion of long-term borrowings

(10,072,961 )

Add: current portion of discount on long-term borrowings

1,977
W 3,206,373

100


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(4)

Long-term borrowings as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won

As of December 31, 2025

Type

Interest rate (%) Maturity Foreign
currency
Local
currency

Local long-term borrowings

Korea Development Bank

Rural development fund loans

0.50 2025~2044 —  W 1,097

Facility loans

4.60~4.94 2028~2042 —  46,340

Facility loans

CB rate+0.90 2029 —  7,457

Hana Bank and others

Commercial paper

3M CD + 0.31~1.20 2025~2030 —  8,350,000

Facility loans

4.60 2028 —  3,578

Facility loans

3yr KTB rate-1.25 2025~2028 —  1,827

The Export-Import Bank of Korea

Inter-Korean Cooperation Fund

1.00 2026 —  1,473

Facility loans

1.32 2026~2028 —  48,000

Operating funds

3M KEXIM bond
rate+0.66
2026 —  50,000

Korea Energy Agency

Development of overseas resources

3yr KTB rate-2.25 1.75 2028 —  6,438

Project loans

0.00 2033 —  1,197

Shinhan Bank and others

Facility loans

CB rate+0.90~1.10 2028~2029 —  10,586

Others

3.95 2034 —  61,820

Others

base rate+1.00 2034 —  61,820

Kookmin Bank

Facility loans

4.36~5.93 2030~2037 —  161,114

Woori Bank

Facility loans

3M CD+1.90 4.65~5.20 2034~2042 —  92,963

IBK

Facility loans

4.00~5.80 2042~2044 —  30,690

Nonghyup Bank

Facility loans

5.60~5.70 2030~2041 —  39,093

Others

Facility loans

3.30~6.80 2028~2042 —  768,821

Facility loans

CB rate+1.10 1.75~5.70 2028~2041 —  20,549

Others

4.40~7.90 2038~2039 —  79,296

Others

2.00~5.41 2031~2034 —  49,819
W 9,893,978

101


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(4)

Long-term borrowings as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won and thousands of foreign currencies

As of December 31, 2025

Type

Interest rate (%) Maturity Foreign
currency
Local
currency

Foreign long-term borrowings

Korea Energy Agency

Project loans

—  2026 USD 8,744 W 12,546

The Export-Import Bank of Korea and others

Export-Import Bank of Korea and others

6.72~8.12 2036 USD 65,616 94,152

Export-Import Bank of Korea and others

6M Synthetic Libor
+2.25~3.70
2027 USD 32,621 46,808

Facility loans

SOFR+0.43~1.83 2029~2031 USD 125,556 180,160

Facility loans

SOFR+0.78 2029 SAR 517,167 197,847

POSCO E&C and others

Shareholder’s Loan

8.00 2026 USD 4,086 5,863

Shareholder’s Loan

8.00 2031 USD 6,845 9,822

NH-Amundi

Syndicated Loan

8.00 2032 JPY 491,448 4,510

SMTB

Syndicated Loan

((0.55%+TIBOR
6M)×40%)
+(1.8225%×60%)
2036 JPY 5,792,647 53,155

Kiwoom Solar Power Professional Investor Private Placement Investment Trust V

Senior borrowing

3.90 2029 EUR 36,060 60,786

MUFG Bank and others

Facility loans

SOFR(3M)+1.60~1.99
SOFR(6M)+5.00

5.67~6.18

2026~2032 USD 801,862 1,150,592

Hanwha US Solar Private Fund 1 and others

Facility loans

6.00 2038 USD 60,818 87,267

Shinhan Bank

Facility loans

1M BBSY+1.40~2.25 2026 AUD 223,008 214,315

Nonghyup Bank and others

Facility loans

10.40 2039 USD 34,577 49,616
W 2,167,439
W 12,061,417

Less: discount on long-term borrowings

(44,541 )

Less: current portion of long-term borrowings

(8,744,156 )

Add: current portion of discount on long-term borrowings

2,054
W 3,274,774

102


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(5)

Local debt securities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won
Issue date Maturity Interest rate (%) As of June 30,
2026
As of December 31,
2025

Electricity Bonds


2012.03.27

~2026.06.25



2026.07.04

~2052.04.21


1.48~5.69 W 59,390,000 59,850,000

Corporate Bonds (*)


2009.10.16

~2026.06.25



2026.07.06

~2054.06.28


1.29~10.00 32,007,317 29,957,353

Corporate Bonds


2021.05.26

~2023.12.28



2041.05.25

~2043.09.15


1.75~7.00 41,578 41,578
91,438,895 89,848,931

Less: discount on local debt securities

(57,557 ) (52,559 )

Less: current portion of local debt securities

(22,991,558 ) (21,801,584 )

Add: current portion of discount on local debt securities

4,373 2,163
W 68,394,153 67,996,951
(*)

Each holder of the private placement bonds of Heemangbit Power Co., Ltd. (W1,548 million) among the debt securities may exercise an early redemption right on the date five years from the issuance date (March 31, 2021) and on March 31 of each year thereafter until the year immediately preceding the maturity date.

103


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(6)

Foreign debt securities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won and thousands of foreign currencies

June 30, 2026

Type

Issue date Maturity Interest rate (%) Foreign
currency
Local currency

FY-96

1996.04.01~1996.12.06 2026.12.01~2096.04.01 6.00~7.95 USD 278,701 W 429,618

FY-97

1997.01.31~1997.08.04 2027.02.01~2027.08.01 6.75~7.00 USD 314,717 485,136

FY-04

2004.04.23 2034.04.23 5.13 USD 286,920 442,287

FY-14

2014.07.30 2029.07.30 3.57 USD 100,000 154,150

FY-17

2017.07.25 2027.07.25 3.13 USD 300,000 462,450

FY-17

2017.10.30 2037.10.30 1.70 EUR 40,000 70,444

FY-17

2017.11.16 2037.11.16 2.36 SEK 450,000 71,465

FY-18

2018.03.13 2028.03.13 3.35 HKD 1,650,000 324,390

FY-19

2019.07.19 2027.07.19 0.05 CHF 100,000 190,933

FY-19

2019.12.19 2037.12.31 3.30~5.70 USD 300,253 462,840

FY-21

2021.08.09 2026.08.09 1.25 USD 300,000 462,450

FY-21

2021.09.24 2026.09.24 1.13 USD 300,000 462,450

FY-22

2022.04.21 2027.04.21 3.63 USD 300,000 462,450

FY-22

2022.06.14 2027.06.14 4.00 USD 300,000 462,450

FY-22

2022.07.27 2027.07.27 4.25 USD 700,000 1,079,050

FY-22

2022.10.06 2028.04.06 5.50 USD 300,000 462,450

FY-22

2022.10.06~2022.11.01 2032.10.06 5.16 HKD 2,350,000 462,010

FY-23

2023.06.07 2030.06.07 4.51 HKD 1,037,000 203,874

FY-23

2023.07.12 2028.07.12 4.88 USD 350,000 539,525

FY-23

2023.07.18 2028.07.18 5.00 USD 500,000 770,750

FY-23

2023.07.31 2026.07.31 5.38 USD 1,000,000 1,541,500

FY-23

2023.09.21 2026.09.21 5.38 USD 300,000 462,450

FY-24

2024.01.31 2027.01.31 4.88 USD 1,200,000 1,849,800

FY-24

2024.07.29 2029.07.29 4.63 USD 500,000 770,750

FY-25

2025.02.13 2028.02.13 4.75 USD 400,000 616,600

FY-25

2025.03.05 2028.03.05 4.10 HKD 1,166,000 229,236

FY-25

2025.07.30 2030.07.30 SOFR+0.79 USD 500,000 770,750

FY-25

2025.11.04 2031.05.04 4.00 USD 300,000 462,450

FY-25

2025.11.12 2028.11.12 Compounded Daily
SOFR+0.62
USD 600,000 924,900

FY-25

2025.11.12 2030.11.12 4.13 USD 400,000 616,600

FY-26

2026.06.16 2031.06.16 4.50 USD 500,000 770,750
W 17,476,958

Less: discount on foreign debt securities

(120,842 )

Less: current portion of foreign debt securities

(6,305,103 )

Add: current portion of discount on foreign debt securities

5,564
W 11,056,577

104


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

23.

Borrowings and Debt Securities, Continued

(6)

Foreign debt securities as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won and thousands of foreign currencies

As of December 31, 2025

Type

Issue date Maturity Interest rate (%) Foreign
currency
Local currency

FY-96

1996.04.01~1996.12.06 2026.12.01~2096.04.01 6.00~7.95 USD 278,701 W 399,908

FY-97

1997.01.31~1997.08.04 2027.02.01~2027.08.01 6.75~7.00 USD 314,717 451,587

FY-04

2004.04.23 2034.04.23 5.13 USD 286,920 411,702

FY-14

2014.07.30 2029.07.30 3.57 USD 100,000 143,490

FY-17

2017.07.25 2027.07.25 3.13 USD 300,000 430,470

FY-17

2017.10.30 2037.10.30 1.70 EUR 40,000 67,429

FY-17

2017.11.16 2037.11.16 2.36 SEK 450,000 70,187

FY-18

2018.03.13 2028.03.13 3.35 HKD 1,650,000 304,277

FY-19

2019.07.19 2027.07.19 0.05 CHF 100,000 181,197

FY-19

2019.12.19 2037.12.31 3.30~5.70 USD 310,682 445,798

FY-20

2020.08.03 2026.02.03 0.61 USD 300,000 430,470

FY-21

2021.01.27 2026.01.27 0.75 USD 450,000 645,705

FY-21

2021.04.27 2026.04.27 1.25 USD 500,000 717,450

FY-21

2021.08.09 2026.08.09 1.25 USD 300,000 430,470

FY-21

2021.09.24 2026.09.24 1.13 USD 300,000 430,470

FY-22

2022.04.21 2027.04.21 3.63 USD 300,000 430,470

FY-22

2022.06.14 2027.06.14 4.00 USD 300,000 430,470

FY-22

2022.07.27 2027.07.27 4.25 USD 700,000 1,004,430

FY-22

2022.10.06 2026.04.06~2028.04.06 5.38~5.50 USD 800,000 1,147,920

FY-22

2022.10.06~2022.11.01 2032.10.06 5.16 HKD 2,350,000 433,364

FY-23

2023.06.07 2030.06.07 4.51 HKD 1,037,000 191,233

FY-23

2023.07.12 2028.07.12 4.88 USD 350,000 502,215

FY-23

2023.07.18 2028.07.18 5.00 USD 500,000 717,450

FY-23

2023.07.31 2026.07.31 5.38 USD 1,000,000 1,434,900

FY-23

2023.09.21 2026.09.21 5.38 USD 300,000 430,470

FY-24

2024.01.31 2027.01.31 4.88 USD 1,200,000 1,721,880

FY-24

2024.07.29 2029.07.29 4.63 USD 500,000 717,450

FY-25

2025.02.13 2028.02.13 4.75 USD 400,000 573,960

FY-25

2025.03.05 2028.03.05 4.10 HKD 1,166,000 215,022

FY-25

2025.07.30 2030.07.30 SOFR+0.79 USD 500,000 717,450

FY-25

2025.11.04 2031.05.04 4.00 USD 300,000 430,470

FY-25

2025.11.12 2028.11.12 Compounded Daily
SOFR+0.62
USD 600,000 860,939

FY-25

2025.11.12 2030.11.12 4.13 USD 400,000 573,959
W 18,094,662

Less: discount on foreign debt securities

(118,038 )

Less: current portion of foreign debt securities

(5,372,332 )

Add: current portion of discount on foreign debt securities

6,305
W 12,610,597
(7)

Changes in borrowings and debt securities for the six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026 For the six-month period ended June 30, 2025
Borrowings Debt
Securities
Total Borrowings Debt
Securities
Total

Beginning balance

W 21,996,296 107,772,996 129,769,292 20,659,381 111,874,019 132,533,400

Cash flow

2,540,963 (263,005 ) 2,277,958 4,047,550 (3,315,584 ) 731,966

Effect of exchange rate fluctuations

36,321 1,235,265 1,271,586 (148,978 ) (1,251,911 ) (1,400,889 )

Others

5,909 (7,802 ) (1,893 ) (19,540 ) 16,656 (2,884 )
W  24,579,489 108,737,454 133,316,943 24,538,413 107,323,180 131,861,593

105


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

24.

Lease

1)

Group as a lessee

(1)

Lease contracts

The Group applies the short-term leases recognition exemption to its lease contracts that have a lease term of 12 months or less from the commencement date, and recognized W125,170 million and W53,916 million respectively, as expense for the six-month periods ended June 30, 2026 and 2025. The Group also applies the leases of low-value assets recognition exemption to lease contracts with underlying assets considered to be low value (i.e., approximately less than W5 million), and recognized W1,711 million and W1,827 million respectively, as expense for the six-month periods ended June 30, 2026 and 2025. The Group has lease contracts for various items such as consecutive voyage charter contracts, real estate lease contracts including buildings, switchyard, and land for electric substation, vehicles, and other equipment.

(2)

Right-of-use assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026
Acquisition
Cost
Accumulated
depreciation
Accumulated
impairment
losses
Book
value

Land

W 1,057,684 (429,678 ) —  628,006

Buildings

238,117 (133,978 ) (23 ) 104,116

Structures

55,982 (16,742 ) —  39,240

Machinery

56,791 (36,533 ) —  20,258

Ships

3,620,505 (2,170,640 ) —  1,449,865

Vehicles

64,361 (41,532 ) —  22,829

Others

391,756 (127,243 ) —  264,513
W 5,485,196 (2,956,346 ) (23 ) 2,528,827
In millions of won As of December 31, 2025
Acquisition
Cost
Accumulated
depreciation
Book
value

Land

W 1,025,978 (401,002 ) 624,976

Buildings

220,277 (126,636 ) 93,641

Structures

54,310 (15,125 ) 39,185

Machinery

56,211 (33,535 ) 22,676

Ships

3,630,728 (2,066,439 ) 1,564,289

Vehicles

72,416 (47,670 ) 24,746

Others (*)

381,469 (119,045 ) 262,424
W 5,441,389 (2,809,452 ) 2,631,937
(*)

During the year ended December 31, 2025, the power purchase agreement (“PPA”) with CGN Yulchon Generation Co., Ltd., an LNG combined-cycle power project operator, was terminated.

106


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

24.

Lease, Continued

1)

Group as a lessee, Continued

(3)

Changes in right-of-use assets for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Increase Decrease Depreciation Others Ending balance

Land

W 624,976 11,633 (29,637 ) (8,907 ) 29,941 628,006

Buildings

93,641 25,832 (21,194 ) (1,303 ) 7,140 104,116

Structures

39,185 313 (4,162 ) —  3,904 39,240

Machinery

22,676 342 (3,170 ) (7 ) 417 20,258

Ships

1,564,289 21,698 (147,014 ) —  10,892 1,449,865

Vehicles

24,746 4,708 (7,094 ) (111 ) 580 22,829

Others

262,424 8,061 (10,863 ) —  4,891 264,513
W 2,631,937 72,587 (223,134 ) (10,328 ) 57,765 2,528,827
In millions of won For the year ended December 31, 2025
Beginning
balance
Increase Decrease Depreciation Others Ending balance

Land

W 677,602 9,402 (59,793 ) (2,035 ) (200 ) 624,976

Buildings

105,841 25,783 (41,921 ) (2,282 ) 6,220 93,641

Structures

40,859 1,889 (8,433 ) (96 ) 4,966 39,185

Machinery

27,060 1,364 (6,515 ) (19 ) 786 22,676

Ships

1,931,093 9,688 (316,823 ) —  (59,669 ) 1,564,289

Vehicles

20,920 21,280 (15,498 ) (1,444 ) (512 ) 24,746

Others

243,021 31,024 (28,680 ) —  17,059 262,424
W  3,046,396 100,430 (477,663 ) (5,876 ) (31,350 ) 2,631,937

107


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

24.

Lease, Continued

1)

Group as a lessee, Continued

(4)

Lease liabilities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Less than 1 year

W 541,120 526,324

1 ~ 5 years

1,720,070 1,614,003

More than 5 years

1,191,029 1,407,310
3,452,219 3,547,637

Less: present value discounts and others

(317,504 ) (396,757 )

Present value of lease payment

W 3,134,715 3,150,880
(5)

Details of the liquidity classification of lease liabilities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Current lease liabilities

W 525,094 510,105

Non-current lease liabilities

2,609,621 2,640,775
W 3,134,715 3,150,880
(6)

Changes in lease liabilities for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Increase Decrease Interest
expenses
Others (*) Ending balance

Lease liabilities

W  3,150,880 67,712 (322,188 ) 34,941 203,370 3,134,715
(*)

Other changes include the effect of translation of lease liabilities denominated in foreign currencies.

In millions of won For the year ended December 31, 2025
Beginning
balance
Increase Decrease Interest
expenses
Others (*) Ending balance

Lease liabilities

W  3,699,456 90,362 (626,586 ) 76,935 (89,287 ) 3,150,880
(*)

Other changes include the effect of translation of lease liabilities denominated in foreign currencies.

108


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

24.

Lease, Continued

1)

Group as a lessee, Continued

(7)

Details of expense relating to lease contracts as lessee for the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Depreciation of right-of-use assets

W 109,701 223,134 126,449 253,460

Interest expenses of lease liabilities

17,508 34,941 19,194 40,015

Lease expenses for short-term leases

68,089 125,170 32,913 53,916

Lease expenses for leases of low-value assets

795 1,711 991 1,827

Variable lease payments

17,518 22,681 (6,454 ) (2,744 )
W 213,611 407,637 173,093 346,474
(8)

The total cash outflow related to the lease contracts amounts to W471,750 million and W422,908 million, for the six-month periods ended June 30, 2026 and 2025, respectively.

109


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

24.

Lease, Continued

2)

Group as a lessor

(1)

Finance lease contracts

The Group entered into power purchase agreements (“PPA”) with Jordan Electric Power Company to provide a 373MW level Qatrana gas combined power plant over a 25-year lease term, and an 89.1MW level Fujeij wind power plant over a 20-year lease term. In addition, the Group provides 7 energy storage system installation projects and 317 energy efficiency contracts as finance leases with a lease term of 3 to 11 years. Also, the Group entered into a PPA with the Comision Federal de Electricidad in Mexico to provide for 25 years (from December 2013 to November 2038) all electricity generated from the power plant after completion of its construction and collect rates consisting of fixed costs (to recover the capital) and variable costs during the contracted period.

(2)

Profits and losses related to finance leases for the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Finance income on the net investment in the lease

W 30,569 61,354 30,550 60,379
(3)

The maturity analysis of the lease payments receivable and reconciliation of the undiscounted lease payments to the net investment in the lease as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Less than 1 year

W 238,012 217,872

1 ~ 2 years

215,337 206,023

2 ~ 3 years

203,440 194,195

3 ~ 4 years

205,973 184,626

4 ~ 5 years

185,310 187,851

More than 5 years

1,220,457 1,218,793
2,268,529 2,209,360

Less: unearned finance income

(929,611 ) (932,072 )

Net investment in the lease (*1)

W 1,338,918 1,277,288
(*1)

The present value of unguaranteed residual value of W38,273 million (December 31, 2025: W34,047 million) is included as of June 30, 2026.

The implicit interest rate for a lease term is determined on the lease contract date. The implicit interest rate of the finance lease contracts is from 3.46% up to 17.85% per year as of June 30, 2026 (0.00%~17.37% as of December 31, 2025).

110


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

24.

Lease, Continued

2)

Group as a lessor, Continued

(4)

Changes in the allowance for doubtful accounts of finance lease receivables for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period
ended June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W 7,002 5,255

Bad debt expense

26 1,977

Write-off

—  (230 )

Ending balance

W 7,028 7,002

111


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

25.

Employment Benefits

(1)

Employment benefit obligations as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Net defined benefit asset

W 179,051 104,344

Net defined benefit obligations

1,002,579 1,380,352

Other long-term employee benefit obligations

23,577 1,500
(2)

Principal assumptions used for actuarial valuation as of June 30, 2026 and December 31, 2025 are as follows:

As of June 30, 2026 As of December 31, 2025

Discount rate

3.80% ~ 6.20 % 3.38% ~ 5.44 %

Future salary and benefit levels

4.83 % 4.83 %

Weighted average duration

9.34 years 9.65 years
(3)

Details of expense relating to defined benefit plans for the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Current service cost

W 108,846 220,072 115,824 228,692

Interest cost

44,412 89,983 42,465 83,412

Expected return on plan assets

(34,697 ) (67,939 ) (30,551 ) (59,882 )
W 118,561 242,116 127,738 252,222

Expenses described above are recognized in those items below in the condensed consolidated financial statements.

In millions of Won June 30, 2026 June 30, 2025
Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Cost of sales

W 85,707 174,614 91,058 179,554

Selling and administrative expenses

21,705 44,247 24,428 48,375

Others including construction-in-progress

11,149 23,255 12,252 24,293
W 118,561 242,116 127,738 252,222

In addition, for the six-month periods ended June 30, 2026 and 2025, benefit expenses which the Group paid for the defined contribution plan in accordance with ratio defined in the Group’s retirement benefit plan are classified as follows: W60,187 million and W49,043 million as cost of sales; W9,066 million and W7,138 million as selling and administrative expenses; and W9,910 million and W8,589 million as construction-in-progress and others.

112


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

25.

Employment Benefits, Continued

(4)

Details of defined benefit obligations as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Present value of defined benefit obligation from funded plans

W 4,360,579 4,978,795

Fair value of plan assets

(3,537,051 ) (3,702,787 )

Net liabilities incurred from defined benefit plans

W 823,528 1,276,008
(5)

Changes in the present value of defined benefit obligations for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended
June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W  4,978,795 4,960,645

Current service cost

220,072 486,139

Interest cost

89,983 173,362

Remeasurement component

(209,331 ) 32,568

Actual payments

(719,078 ) (673,863 )

Others

138 (56 )

Ending balance

W 4,360,579 4,978,795
(6)

Changes in the fair value of plan assets for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended
June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W  3,702,787 3,551,233

Expected return

67,939 124,639

Remeasurement component

(15,672 ) (12,236 )

Contributions by the employers

22,892 350,970

Actual payments

(240,895 ) (311,819 )

Ending balance

W 3,537,051 3,702,787

113


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

25.

Employment Benefits, Continued

(7)

Details of the fair value of plan assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Equity instruments

W 1,739 879

Debt instruments

506,939 527,278

Bank deposits

227,851 275,590

Others (*)

2,800,522 2,899,040
W 3,537,051 3,702,787
(*)

Other plan assets consist of various financial assets managed by external asset management companies.

For the six-month period ended June 30, 2026 and for the year ended December 31, 2025, actual returns on plan assets amounted to W52,267 million and W112,403 million, respectively.

(8)

Remeasurement components recognized in other comprehensive income (loss) for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended
June 30, 2026
For the year ended
December 31, 2025

Actuarial loss from changes in financial assumptions

W (250,592 ) (172,587 )

Actuarial loss from experience adjustments, etc.

41,261 205,155

Expected loss

15,672 12,236
W (193,659 ) 44,804

Remeasurement component recognized as other comprehensive income or loss is included in retained earnings.

In addition, gain on accumulated remeasurement component amounting to W143,091 million and W8,027 million have been recognized as other comprehensive income as of June 30, 2026 and December 31, 2025, respectively.

114


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

26.

Provisions

(1)

Provisions as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Employment benefits

Provisions for employment benefits

W 1,266,932 —  1,145,049 — 

Litigation

Litigation provisions

4,563 285,654 10,114 342,213

Decommissioning cost

Nuclear plants

55,874 24,444,628 55,874 24,121,023

Spent fuel

879,085 2,021,986 700,694 2,044,650

Radioactive waste

86,937 1,746,084 72,616 1,699,429

PCBs

—  8,727 —  14,073

Other recovery provisions

—  57,380 —  55,843

Others

Power plant regional support program

166,197 —  132,818 — 

Transmission regional support program

223,367 —  344,824 — 

Provisions for financial guarantee

17,366 29,361 21,815 28,894

Provisions for RPS

12,973 —  —  — 

Provisions for greenhouse gas emissions obligations

194,379 —  151,187 — 

Provision for Onerous Contracts

1,288,202 66 1,448,037 1,656

Provision for defects liability

376 99,297 311 111,885

Provision for product warranties

960 —  977 — 

Others

79,217 456,640 85,927 444,034
W  4,276,428 29,149,823 4,170,243 28,863,700
(2)

Changes in provisions for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning balance Increase in
provision
Payment Reversal Others Ending
balance

Employment benefits

Provisions for employment benefits

W 1,145,049 603,059 (481,148 ) (28 ) —  1,266,932

Litigation

Litigation provisions

352,327 16,746 (70,029 ) (5,055 ) (3,772 ) 290,217

Decommissioning cost

Nuclear plants

24,176,897 355,577 (31,972 ) —  —  24,500,502

Spent fuel

2,745,344 421,631 (265,904 ) —  —  2,901,071

Radioactive waste

1,772,045 65,346 (4,370 ) —  —  1,833,021

PCBs

14,073 228 (5,574 ) —  —  8,727

Other recovery provisions

55,843 904 —  —  633 57,380

Others

Power plant regional support program

132,818 60,126 (26,747 ) —  —  166,197

Transmission regional support program

344,824 5,367 (126,824 ) —  —  223,367

Provisions for financial guarantee

50,709 3,357 (5,345 ) (2,421 ) 427 46,727

Provisions for RPS

—  642,857 (611,849 ) (18,035 ) —  12,973

Provisions for greenhouse gas emissions obligations

151,187 44,307 —  (1,115 ) —  194,379

Provision for Onerous Contracts

1,449,693 7,859 —  (169,284 ) —  1,288,268

Provision for defects liability

112,196 13,929 (26,421 ) (31 ) —  99,673

Provision for product warranties

977 4 (5 ) (16 ) —  960

Others

529,961 62,832 (59,709 ) 2,270 503 535,857
W  33,033,943 2,304,129 (1,715,897 ) (193,715 ) (2,209 ) 33,426,251

115


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

26.

Provisions, Continued

(2)

Changes in provisions for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows, continued:

In millions of won For the year ended December 31, 2025
Beginning balance Increase in
provision
Payment Reversal Others Ending
balance

Employment benefits

Provisions for employment benefits

W 1,093,625 1,364,058 (1,301,555 ) (11,079 ) —  1,145,049

Litigation

Litigation provisions

488,421 44,700 (167,170 ) (13,638 ) 14 352,327

Decommissioning cost

Nuclear plants

23,272,373 1,005,286 (63,355 ) (37,407 ) —  24,176,897

Spent fuel

2,923,745 578,601 (411,377 ) (345,625 ) —  2,745,344

Radioactive waste

1,761,791 108,910 (56,879 ) (41,777 ) —  1,772,045

PCBs

39,389 1,144 (19,958 ) (6,502 ) —  14,073

Other recovery provisions

50,407 18,963 (1,290 ) (280 ) (11,957 ) 55,843

Others

Power plant regional support program

130,256 59,769 (57,207 ) —  —  132,818

Transmission regional support program

302,631 212,701 (170,508 ) —  —  344,824

Provisions for financial guarantee

30,924 45,864 (22,553 ) (3,347 ) (179 ) 50,709

Provisions for RPS

—  1,107,704 (1,101,002 ) (6,702 ) —  — 

Provisions for greenhouse gas emissions obligations

156,463 247,135 (241,024 ) (7,204 ) (4,183 ) 151,187

Provision for Onerous Contracts

1,767 1,448,691 —  (765 ) —  1,449,693

Provision for defects liability

121,402 30,329 (39,416 ) (119 ) —  112,196

Provision for product warranties

967 50 (9 ) (28 ) (3 ) 977

Others

256,844 278,428 (5,195 ) —  (116 ) 529,961
W  30,631,005 6,552,333 (3,658,498 ) (474,473 ) (16,424 ) 33,033,943

116


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

27.

Government Grants

(1)

Government grants as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Land

W 27,391 27,392

Buildings

36,143 38,077

Structures

144,448 149,558

Machinery

91,532 94,337

Vehicles

2,790 2,683

Equipment

938 1,868

Tools

815 982

Construction-in-progress

233,939 230,573

Investment properties

21 22

Software

599 804

Development expenditures

394 540

Intangible assets under development

5,673 5,044

Other intangible assets

90 136
W  544,773 552,016

117


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

27.

Government Grants, Continued

(2)

Changes in government grants for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Receipt Acquisition Offset the
items of
depreciation
expense and
others
Disposal Revenue Others Ending
balance

Cash

W —  8,905 (8,785 ) —  —  (120 ) —  — 

Land

27,392 —  —  —  (1 ) —  —  27,391

Buildings

38,077 —  —  (1,934 ) —  —  —  36,143

Structures

149,558 —  —  (4,849 ) (266 ) —  5 144,448

Machinery

94,337 —  272 (6,777 ) (60 ) —  3,760 91,532

Vehicles

2,683 —  162 (691 ) (2 ) —  638 2,790

Equipment

1,868 —  —  (1,060 ) —  —  130 938

Tools

982 —  —  (227 ) —  —  60 815

Construction-in-progress

230,573 —  7,668 —  —  —  (4,302 ) 233,939

Investment properties

22 —  —  (1 ) —  —  —  21

Software

804 —  —  (222 ) —  —  17 599

Development expenditures

540 —  —  (146 ) —  —  —  394

Intangible assets under development

5,044 —  683 —  —  —  (54 ) 5,673

Other intangible assets

136 —  —  (46 ) —  —  —  90
W  552,016 8,905 —  (15,953 ) (329 ) (120 ) 254 544,773
In millions of won For the year ended December 31, 2025
Beginning
balance
Receipt Acquisition Offset the
items of
depreciation
expense and
others
Disposal Revenue Others Ending
balance

Cash

W —  25,243 (25,019 ) —  —  (224 ) —  — 

Land

27,403 —  —  —  (11 ) —  —  27,392

Buildings

41,718 —  —  (3,937 ) (4 ) —  300 38,077

Structures

149,737 —  —  (9,552 ) (687 ) —  10,060 149,558

Machinery

105,546 —  1,150 (15,011 ) (384 ) —  3,036 94,337

Vehicles

2,745 —  484 (1,309 ) (6 ) —  769 2,683

Equipment

3,915 —  19 (2,119 ) —  —  53 1,868

Tools

1,306 —  —  (437 ) —  —  113 982

Construction-in-progress

223,566 —  21,758 —  —  —  (14,751 ) 230,573

Investment properties

22 —  —  —  —  —  —  22

Software

844 —  —  (342 ) —  —  302 804

Development expenditures

939 —  —  (496 ) —  —  97 540

Intangible assets under development

3,473 —  1,608 —  —  —  (37 ) 5,044

Other intangible assets

229 —  —  (93 ) —  —  —  136
W  561,443 25,243 —  (33,296 ) (1,092 ) (224 ) (58 ) 552,016

118


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

28.

Deferred Revenue

Changes in deferred revenues for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows which are included in current and non-current non-financial liabilities in the consolidated statements of financial position:

In millions of won For the six-month period ended
June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W 14,099,143 13,652,565

Increase

777,322 1,308,338

Recognized as revenue

(451,157 ) (861,760 )

Ending balance

W 14,425,308 14,099,143
29.

Non-financial Liabilities

Non-financial liabilities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Current Non-current Current Non-current

Advance received

W 3,765,681 643,228 3,742,661 423,445

Unearned revenue

62,731 14,786 56,306 18,364

Deferred revenue

853,949 13,571,359 826,003 13,273,140

Withholdings

382,825 1,024 300,016 1,024

Others

1,680,425 11,029 1,880,185 10,186
W 6,745,611 14,241,426 6,805,171 13,726,159

119


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

30.

Contributed Capital

(1)

Details of share capital as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won except share information
As of June 30, 2026
Shares
authorized
(in shares)
Shares issued
(in shares)
Par value
per share
(in won)
Owned by
government (*1)
Owned by
others
Total

Common shares

1,200,000,000 641,964,077 W 5,000 1,640,385 1,569,435 3,209,820
(*1)

Equity of W1,056,176 million held by Korea Development Bank is included.

In millions of won except share information
As of December 31, 2025
Shares
authorized
(in shares)
Shares issued
(in shares)
Par value
per share
(in won)
Owned by
government (*1)
Owned by
others
Total

Common shares

1,200,000,000 641,964,077 W 5,000 1,640,385 1,569,435 3,209,820
(*1)

Equity of W1,056,176 million held by Korea Development Bank is included.

(2)

Details in the number of floating capital stock for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

Number of shares For the six-month period
ended June 30, 2026
For the year ended
December 31, 2025

Beginning balance

641,964,077 641,964,077

Ending balance

641,964,077 641,964,077
(3)

Details of share premium as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Share premium

W 843,758 843,758

120


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

31.

Retained Earnings and Dividends Paid

(1)

Details of retained earnings as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Legal reserve (*1)

W 1,604,910 1,604,910

Voluntary reserves

6,807,034 567,469

Retained earnings before appropriations

22,000,850 26,328,205

Retained earnings

W 30,412,794 28,500,584
(*1)

In accordance with Article 14 of the Korea Electric Power Corporation Act, the Group is required to appropriate at least 20% of its net income as a legal reserve each year until the reserve reaches 50% of its share capital. The legal reserve may not be distributed as cash dividends and may only be used to offset accumulated deficits or be transferred to capital through a resolution of the shareholders’ meeting.

(2)

Details of voluntary reserves as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Reserve for business expansion

W 6,807,034 567,469
(3)

Changes in retained earnings for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period
ended June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W 28,500,584 20,128,247

Profit for the year attributed to owners of the controlling company

2,760,052 8,544,918

Changes in equity method retained earnings

25,390 (5,944 )

Remeasurements of defined benefit liability, net of tax

116,677 (29,899 )

Dividend paid

(989,909 ) (136,738 )

Ending balance

W 30,412,794 28,500,584

121


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

31.

Retained Earnings and Dividends Paid, Continued

(4)

Dividends paid for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Number of
shares issued
(in shares)
Number of
treasury stocks
(in shares)
Number of
shares eligible for
dividends (in shares)
Dividends paid
per share
(in won)
Dividends
paid

Common shares

641,964,077 —  641,964,077 W 1,542 989,909
In millions of won For the year ended December 31, 2025
Number of
shares issued
(in shares)
Number of
treasury stocks
(in shares)
Number of
shares eligible for
dividends (in shares)
Dividends paid
per share
(in won)
Dividends
paid

Common shares

641,964,077 —  641,964,077 W 213 136,738
(5)

Changes in retained earnings of investments in associates and joint ventures for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period
ended June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W (23,364 ) (17,420 )

Changes

25,390 (5,944 )

Ending balance

W 2,026 (23,364 )
(6)

Changes in remeasurement components related to defined benefit liability for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period
ended June 30, 2026
For the year ended
December 31, 2025

Beginning balance

W 8,027 (95,694 )

Changes

188,913 (47,266 )

Income tax effect

(72,236 ) 17,367

Transfer to reserve for business expansion

18,387 133,620

Ending balance

W 143,091 8,027

122


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

32.

Hybrid Bonds

The 2nd hybrid bond issued by Korea South-East Power Co., Ltd., a subsidiary of the Group, was fully redeemed during the year ended December 31, 2025. Accordingly, there are no outstanding hybrid bonds classified as non-controlling interests as of June 30, 2026 and December 31, 2025.

33.

Other Components of Equity

(1)

Other components of equity as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Other capital surplus

W 1,568,699 1,566,635

Accumulated other comprehensive income

1,932,167 1,340,560

Other equity

12,708,585 12,708,585
W 16,209,451 15,615,780
(2)

Changes in other capital surplus for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026 For the year ended December 31, 2025
Gains on
disposal of
treasury
stocks
Others Total Gains on
disposal of
treasury
stocks
Others Total

Beginning balance

W 387,524 1,179,111 1,566,635 387,524 1,213,288 1,600,812

Additional paid-in capital of subsidiaries

—  (64 ) (64 ) —  (855 ) (855 )

Equity transaction within the consolidated entity

—  2,128 2,128 —  (33,322 ) (33,322 )

Ending balance

W 387,524 1,181,175 1,568,699 387,524 1,179,111 1,566,635

123


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

33.

Other Components of Equity, Continued

(3)

Changes in accumulated other comprehensive income (loss) for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Financial assets at
fair value
through other
comprehensive
income valuation
reserve
Shares of other
comprehensive

income of
investments in
associates and
joint ventures
Reserve for
overseas operations
translation credit
Reserve for
gain (loss) on
valuation of

derivatives
Total

Beginning balance

W 224,645 1,340,165 (236,978 ) 12,728 1,340,560

Changes in the unrealized fair value of financial assets at FVOCI, net of tax

9,590 —  —  —  9,590

Shares of other comprehensive loss of associates and joint ventures, net of tax

—  534,049 —  —  534,049

Foreign currency translation of foreign operations, net of tax

—  —  34,120 —  34,120

Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax

—  —  —  13,848 13,848

Ending balance

W 234,235 1,874,214 (202,858 ) 26,576 1,932,167
In millions of won For the year ended December 31, 2025
Financial assets at
fair value
through other
comprehensive
income valuation
reserve
Shares of other
comprehensive

income of
investments in
associates and
joint ventures
Reserve for
overseas operations
translation credit
Reserve for
gain (loss) on
valuation of

derivatives
Total

Beginning balance

W 80,757 1,597,958 (231,946 ) (22,755 ) 1,424,014

Changes in the unrealized fair value of financial assets at FVOCI, net of tax

143,888 —  —  —  143,888

Shares of other comprehensive loss of associates and joint ventures, net of tax

—  (257,793 ) —  —  (257,793 )

Foreign currency translation of foreign operations, net of tax

—  —  (5,032 ) —  (5,032 )

Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax

—  —  —  35,483 35,483

Ending balance

W 224,645 1,340,165 (236,978 ) 12,728 1,340,560
(4)

Other equity as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won

As of June 30, 2026 As of December 31, 2025

Statutory revaluation reserve

W 12,708,704 12,708,704

Changes in other equity

(119 ) (119 )
W 12,708,585 12,708,585

124


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

34.

Sales

Details of sales for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026
Domestic Overseas Total
Three-
month
period
ended
Six-
month
period

ended
Three-
month
period

ended
Six-
month
period

ended
Three-
month
period

ended
Six-
month
period

ended

[Type of goods and services]

Sale of goods

W 21,188,212 44,847,073 79,853 195,917 21,268,065 45,042,990

Electricity

20,740,787 43,964,066 —  —  20,740,787 43,964,066

Heat supply

27,435 180,212 —  —  27,435 180,212

Others

419,990 702,795 79,853 195,917 499,843 898,712

Sales related to rendering of services

121,747 196,367 58,964 156,807 180,711 353,174

Sales related to construction services

48,060 92,564 196,680 377,454 244,740 470,018

Revenue related to transfer of assets from customers

225,336 451,157 —  —  225,336 451,157
W 21,583,355 45,587,161 335,497 730,178 21,918,852 46,317,339

[Timing of revenue recognition]

Performance obligations satisfied at a point in time

W 21,188,212 44,847,073 79,853 195,917 21,268,065 45,042,990

Performance obligations satisfied over time

395,143 740,088 255,644 534,261 650,787 1,274,349
W 21,583,355 45,587,161 335,497 730,178 21,918,852 46,317,339
In millions of Won June 30, 2025
Domestic Overseas Total
Three-
month
period
ended
Six-
month
period

ended
Three-
month
period

ended
Six-
month
period

ended
Three-
month
period

ended
Six-
month
period

ended

[Type of goods and services]

Sale of goods

W 21,295,111 44,994,678 97,885 207,767 21,392,996 45,202,445

Electricity

20,946,333 44,157,533 —  —  20,946,333 44,157,533

Heat supply

54,495 241,183 —  —  54,495 241,183

Others

294,283 595,962 97,885 207,767 392,168 803,729

Sales related to rendering of services

112,928 199,518 43,954 104,056 156,882 303,574

Sales related to construction services

71,331 90,587 109,940 146,881 181,271 237,468

Revenue related to transfer of assets from customers

218,989 430,635 —  —  218,989 430,635
W 21,698,359 45,715,418 251,779 458,704 21,950,138 46,174,122

[Timing of revenue recognition]

Performance obligations satisfied at a point in time

W 21,295,111 44,994,678 97,885 207,767 21,392,996 45,202,445

Performance obligations satisfied over time

403,248 720,740 153,894 250,937 557,142 971,677
W 21,698,359 45,715,418 251,779 458,704 21,950,138 46,174,122

125


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

35.

Selling and Administrative Expenses

Selling and administrative expenses for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Salaries

W 294,100 587,259 293,934 579,663

Retirement benefit expense

25,941 53,313 27,406 55,513

Contributions to employee welfare fund

5 5 4 4

Welfare and benefit expense

41,606 82,851 40,915 73,739

Insurance expense

2,383 15,498 8,499 16,215

Depreciation

60,998 121,547 58,753 116,264

Amortization of intangible assets

17,082 37,287 23,072 45,390

Bad debt expense

9,609 25,491 14,171 31,544

Commission

107,419 213,614 99,019 205,026

Advertising expense

7,673 17,957 6,292 16,776

Training expense

2,530 4,656 2,329 4,315

Vehicle maintenance expense

2,619 4,580 2,280 4,318

Publishing expense

781 1,464 805 1,516

Business promotion expense

726 1,486 679 1,387

Rent expense

13,914 26,470 14,393 26,165

Telecommunication expense

2,321 5,312 2,309 5,147

Transportation expense

307 661 297 542

Taxes and dues

80,509 90,289 74,296 84,447

Expendable supplies expense

2,933 5,438 2,376 4,228

Water, light and heating expense

3,358 7,776 3,316 7,941

Repairs and maintenance expense

21,297 38,033 37,771 66,832

Ordinary development expense

43,269 76,295 47,363 90,963

Travel expense

5,957 11,785 5,821 10,728

Clothing expense

3,265 3,709 2,326 2,872

Survey and analysis expense

212 409 211 397

Membership fee

801 1,370 790 1,423

Others

32,192 65,299 25,297 54,802
W 783,807 1,499,854 794,724 1,508,157

126


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

36.

Other Income and Expenses Continued

(1)

Other income for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Reversal of other provisions

W 3,675 5,906 970 4,083

Reversal of other bad debt allowance

(22,910 ) 2,659 (757 ) 5,743

Gains on government grants

58 120 55 102

Gains on assets contributed

71 2,894 1,332 1,513

Gains on liabilities exempted

929 981 427 707

Compensation and reparations revenue

20,561 46,204 25,688 45,895

Revenue from foundation fund

25 36 9 163

Rental income

50,223 103,078 52,340 105,189

Others

7,771 55,160 13,309 22,785
W60,403 217,038 93,373 186,180
(2)

Other expenses for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Compensation and indemnification expense

W —  —  1,309 1,310

Accretion expenses of other provisions

625 672 315 755

Depreciation expenses on investment properties

217 473 313 508

Depreciation expenses on idle assets

896 1,797 903 1,807

Other bad debt expense

69,275 69,275 —  2

Donations

11,692 84,764 64,634 76,745

Others

7,689 11,453 7,746 13,971
W90,394 168,434 75,220 95,098

127


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

37.

Other Gains (Losses)

Composition of other gains (losses) for each of the three and six-month periods ended June 30, 2026 and 2025 is as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Other gains

Gains on disposal of property, plant and equipment

W 1,926 3,627 2,712 8,075

Gains on disposal of intangible assets

—  —  16 16

Reversal of impairment loss on property, plant and equipment

—  1 —  — 

Reversal of impairment loss on intangible assets

47 47 40 40

Gains on foreign currency translation

16,634 57,417 9,677 13,839

Gains on foreign currency transactions

27,726 47,812 31,125 75,738

Gains on insurance proceeds

1,281 2,081 1,015 1,015

Others

92,376 192,363 109,052 281,516

Other losses

Losses on disposal of property, plant and equipment

(19,253 ) (39,202 ) (12,982 ) (50,140 )

Losses on disposal of intangible assets

(1 ) (1 ) —  (13 )

Loss on impairment of property, plant and equipment

—  (825 ) —  — 

Loss on impairment of intangible assets

—  (1,115 ) (30 ) (30 )

Losses on foreign currency translation

(4,176 ) (31,100 ) (36,974 ) (47,056 )

Losses on foreign currency transactions

(44,916 ) (85,578 ) (17,706 ) (37,394 )

Others

(14,913 ) (77,092 ) (65,334 ) (126,423 )
W 56,731 68,435 20,611 119,183

128


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

38.

Finance Income

Finance income for each of the three and six-month periods ended June 30, 2026 and 2025 is as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Interest income

W 97,450 194,405 103,058 215,046

Dividends income

5,887 25,962 9,770 23,321

Gains on disposal of financial assets

13,063 28,109 8,932 19,496

Gains on valuation of financial assets at fair value through profit or loss

24,204 40,525 20,180 34,789

Gains on valuation of derivatives

236,210 1,189,821 —  31,735

Gains on transaction of derivatives

95,197 209,464 60,048 139,178

Gains on foreign currency translation

36,399 111,934 1,329,479 1,391,376

Gains on foreign currency transactions

4,185 8,673 253,818 293,741

Others

571 1,352 681 1,510
W 513,166 1,810,245 1,785,966 2,150,192

129


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

39.

Finance Expenses

Finance expenses for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won June 30, 2026 June 30, 2025
Three-
month
period
ended
Six-
month

period
ended
Three-
month
period
ended
Six-
month
period
ended

Interest expense

W 1,049,395 2,079,121 1,094,132 2,211,256

Losses on valuation of derivatives

9,366 13,868 1,029,015 1,023,742

Losses on transaction of derivatives

35,602 47,274 227,745 262,194

Losses on foreign currency translation

268,797 1,272,709 65,639 95,129

Losses on foreign currency transactions

62,640 79,862 42,597 45,112

Others

16,932 28,383 4,570 8,845
W 1,442,732 3,521,217 2,463,698 3,646,278

Capitalization rates for the six-month periods ended June 30, 2026 and 2025 are 2.27%~5.80% and 2.31%~3.29%, respectively.

130


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

40.

Income Taxes

(1)

Income tax expense is calculated by adjusting prior year adjustments, changes in deferred tax assets and liabilities resulting from temporary differences, and income tax expense related to items recognized as other than profit or loss. The average effective tax rate for each of the six-month periods ended June 30, 2026 and 2025 is 26.81% and 27.75%, respectively.

(2)

Pillar two model rules

The Group has assessed the potential exposure arising from the Pillar Two legislation based on the financial information. Based on the assessment carried out so far, the Group has identified its potential exposure to Pillar Two income taxes on profits earned from its constituent entities operating in Nepal, Pakistan, Vietnam, and other jurisdictions where the expected Pillar Two effective tax rate is likely to be lower than 15%. As a result, the Group expects that KEPCO and its constituent entities operating therein will pay additional Pillar Two income taxes on the profit from such constituent entities.

The current income tax expense recognized for the six-month period ended June 30, 2026 in relation with the additional Pillar Two income taxes amounts to W3,363 million (W1,421 million for the six-month period ended June 30, 2025). The Group has applied the mandatory exception to recognition and disclosure of deferred taxes arising from Pillar Two income taxes.

41.

Assets Held-for-Sale

Although the Group entered into a contract to sell the site of the Majang Materials Center during the year ended December 31, 2025, the asset was not classified as assets held-for-sale as of June 30, 2026, as it was not considered highly probable that the sale would be completed within one year.

131


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

42.

Expenses Classified by Nature

Expenses classified by nature for the six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Selling and
administrative
expenses
Cost of sales Total

Raw materials used

W —  9,837,734 9,837,734

Power purchase

—  17,206,862 17,206,862

Salaries

587,259 2,393,280 2,980,539

Retirement benefit expense

53,313 234,801 288,114

Contributions to employee welfare fund

5 100 105

Welfare and benefit expense

82,851 313,699 396,550

Insurance expense

15,498 71,349 86,847

Depreciation

121,547 6,639,532 6,761,079

Amortization of intangible assets

37,287 37,032 74,319

Bad debt expense

25,491 —  25,491

Commission

213,614 181,306 394,920

Advertising expense

17,957 4,942 22,899

Training expense

4,656 7,740 12,396

Vehicle maintenance expense

4,580 4,203 8,783

Publishing expense

1,464 1,215 2,679

Business promotion expense

1,486 1,328 2,814

Rent expense

26,470 84,961 111,431

Telecommunication expense

5,312 5,326 10,638

Transportation expense

661 23,922 24,583

Taxes and dues

90,289 401,274 491,563

Expendable supplies expense

5,438 25,878 31,316

Water, light and heating expense

7,776 19,086 26,862

Repairs and maintenance expense

38,033 1,402,031 1,440,064

Ordinary development expense

76,295 273,489 349,784

Travel expense

11,785 36,923 48,708

Clothing expense

3,709 3,463 7,172

Survey and analysis expense

409 2,193 2,602

Membership fee

1,370 5,857 7,227

Others

65,299 685,238 750,537
W 1,499,854 39,904,764 41,404,618

132


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

42.

Expenses Classified by Nature, Continued

Expenses classified by nature for the six-month periods ended June 30, 2026 and 2025 are as follows, continued:

In millions of won For the six-month period ended June 30, 2025
Selling and
administrative
expenses
Cost of sales Total

Raw materials used

W —  8,718,869 8,718,869

Power purchase

—  17,357,843 17,357,843

Salaries

579,663 2,349,931 2,929,594

Retirement benefit expense

55,513 228,597 284,110

Contributions to employee welfare fund

4 122 126

Welfare and benefit expense

73,739 271,721 345,460

Insurance expense

16,215 71,501 87,716

Depreciation

116,264 6,792,839 6,909,103

Amortization of intangible assets

45,390 37,076 82,466

Bad debt expense

31,544 —  31,544

Commission

205,026 153,795 358,821

Advertising expense

16,776 4,299 21,075

Training expense

4,315 7,119 11,434

Vehicle maintenance expense

4,318 4,255 8,573

Publishing expense

1,516 1,245 2,761

Business promotion expense

1,387 1,238 2,625

Rent expense

26,165 80,351 106,516

Telecommunication expense

5,147 5,433 10,580

Transportation expense

542 34,168 34,710

Taxes and dues

84,447 377,524 461,971

Expendable supplies expense

4,228 23,246 27,474

Water, light and heating expense

7,941 18,810 26,751

Repairs and maintenance expense

66,832 1,221,685 1,288,517

Ordinary development expense

90,963 266,147 357,110

Travel expense

10,728 37,291 48,019

Clothing expense

2,872 2,482 5,354

Survey and analysis expense

397 1,965 2,362

Membership fee

1,423 12,799 14,222

Others

54,802 694,135 748,937
W 1,508,157 38,776,486 40,284,643

133


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

43.

Earnings Per Share

(1)

Basic earnings per share for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In Won June 30, 2026 June 30, 2025

Type

Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Basic earnings per share

W 416 4,299 1,771 5,397
(2)

Profits for the periods and the weighted average number of common shares used in the calculation of basic earnings per share for each of the three and six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of Won except number of shares June 30, 2026 June 30, 2025

Type

Three-
month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

Profit attributable to controlling interest

W 267,306 2,760,052 1,136,712 3,464,958

Profit used in the calculation of total basic earnings per share

267,306 2,760,052 1,136,712 3,464,958

Weighted average number of common shares (in shares)

641,964,077 641,964,077 641,964,077 641,964,077
(3)

The weighted average number of common shares used in the calculation of basic earnings per share for each of the three and six-month periods ended June 30, 2026 and 2025 is as follows:

In number of shares June 30, 2026 June 30, 2025

Type

Three-
Month
period
ended
Six-
month
period
ended
Three-
month
period
ended
Six-
month
period
ended

The number of common shares issued at beginning of the year

641,964,077 641,964,077 641,964,077 641,964,077

Weighted average number of common shares

641,964,077 641,964,077 641,964,077 641,964,077
(4)

There are no potential dilutive instruments, thus diluted earnings per share are same as basic earnings per share for each of the three and six-month periods ended June 30, 2026 and 2025.

134


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management

The Group manages various risks that may arise from each business segment, primarily focusing on credit risk, market risk, interest rate risk, and liquidity risk. These risks are identified, measured, controlled, and reported in accordance with the Group’s established basic policy for risk management.

(1)

Capital risk management

The Group manages its capital to ensure the ability to continue as a going concern while minimizing the cost of capital and maximizing returns to shareholders. The management of the Group periodically reviews the capital structure and maintains an optimal capital mix through short and long-term borrowings and equity issuances. The capital structure consists of net debt (calculated as borrowings less cash and cash equivalents) and equity. The Group’s overall capital risk management policy remains consistent with the prior year.

Details of the Group’s capital management accounts as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Total borrowings and debt securities

W 133,316,943 129,769,292

Cash and cash equivalents

2,622,064 2,240,811

Net borrowings and debt securities

130,694,879 127,528,481

Total equity

51,845,207 49,322,944

Ratio of net borrowings and debt securities to total equity

252.09 % 258.56 %
(2)

Financial risk management

The Group is exposed to various risks related to its financial instruments, such as, market risk (currency risk, interest rate risk, price risk), and credit risk. The Group monitors and manages the financial risks relating to the operations of the Group through internal risk reports which analyze exposures by degree and magnitude of risks. The Group uses derivative financial instruments to hedge certain risk exposures. The Group’s overall financial risk management strategy remains consistent with the prior year.

(i)

Credit risk

Credit risk is the risk of finance loss to the Group if a customer or counterparty to a financial instrument fails to meet its contractual obligations, and arises primarily from the sales activities, securities and derivatives. In addition, credit risk exposure may exist within financial guarantees and unused line of credits. As these financial institutions the Group makes transactions with are reputable financial institutions, the credit risk from them is considered limited. The Group decides credit transaction limits based on evaluation of client’s credit, through information obtained from the credit bureau and disclosed financial position at committing contracts.

①

Credit risk management

Electricity sales, the main operations of the Group are the necessity for daily life and industrial activities of Korean nationals and have importance as one of the national key industries. The Group dominates the domestic market supplying electricity to customers. The Group is not exposed to significant credit risk as customers of the Group are diverse and are from various industries and areas. The Group uses publicly available information and its own internal data related to trade receivables, to rate its major customers and to measure the credit risk that a counter party will default on a contractual obligation. For the incurred but not recognized loss, it is measured considering overdue period.

②

Impairment and allowance account

In accordance with the Group’s policies, individual financial assets over the materiality threshold are reviewed on a regular basis. Allowances for doubtful accounts on individually reviewed trade receivables are determined by assessing, on a case-by-case basis, whether an incurred loss exists at the end of the reporting period, and this applies to all individually material trade receivables. The assessments usually include the collateral obtained on the individual accounts (including reconfirmation of its enforceability) and the expected collections.

Allowances for doubtful accounts assessed on a collective basis are established for (i) groups of homogeneous assets that are individually below the materiality threshold, and (ii) losses that have been incurred but not yet identified, by overdue period based on the due dates, using available historical experience, judgment and statistical techniques.

135


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

Book values of the financial assets represent the maximum exposed amounts of the credit risk. Details of the Group’s level of maximum exposure to credit risk as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Cash and cash equivalents

W 2,622,064 2,240,811

Financial assets at fair value through profit or loss (*1)

2,319,012 1,800,539

Derivative assets (trading)

2,328,011 1,548,015

Financial assets at fair value through other comprehensive income (debt securities)

4,794 4,794

Financial assets at amortized cost

30,786 31,117

Loans

1,088,155 986,528

Long-term/short-term financial instruments

2,252,785 2,882,131

Derivative assets (applying hedge accounting)

461,170 487,535

Trade and other receivables

15,354,084 15,742,665

Financial guarantee contracts (*2)

3,743,906 4,091,813
(*1)

Equity investments held by the Group are excluded.

(*2)

Maximum exposure associated with the financial guarantee contracts is the maximum amounts of the obligation.

For the six-month period ended June 30, 2026, there are no financial assets and non-financial assets that were acquired through the exercise of the right of collateralized assets and reinforcement of credit arrangement.

(ii)

Market risk

Market risk is the risk that the Group’s fair values of the financial instruments or future cash flows are affected by the changes in the market. Market risk consists of interest rate risk, currency risk and other price risk.

136


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

(iii)

Sensitivity analysis

Significant assets and liabilities with uncertainties in underlying assumptions.

①

Defined benefit obligation

A sensitivity analysis of defined benefit obligation assuming a 1%p increase and decrease in the actuarial valuation assumptions as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Type

Accounts

1%p
Increase
1%p
Decrease
1%p
Increase
1%p
Decrease

Future salary increases

Increase (decrease) in defined benefit obligation W 415,270 (366,388 ) 460,237 (412,611 )

Discount rate

Increase (decrease) in defined benefit obligation (360,452 ) 420,524 (427,236 ) 491,119

Changes in retirement benefit costs assuming a 1%p increase and decrease in discount rate on plan asset for the six-month periods ended June 30, 2026 and 2025 are W17,337 million and W16,506 million, respectively.

②

Provisions

The underlying assumptions to estimate provisions as of June 30, 2026 and December 31, 2025 are as follows:

Accounts

Type

As of June 30, 2026 As of December 31, 2025

PCBs

Inflation rate 3.29 % 3.29 %
Discount rate 3.24 % 3.24 %

Nuclear plants

Inflation rate 2.04 % 2.04 %
Discount rate 2.89 % 2.89 %

Spent fuel

Inflation rate 2.04 % 2.04 %
Discount rate 2.47 % 2.47 %

Radioactive waste

Inflation rate 2.45 % 2.45 %
Discount rate 4.03 % 4.03 %

A sensitivity analysis of provisions assuming a 0.1%p increase and decrease in the underlying assumptions as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Type

Accounts

0.1%p
Increase
0.1%p
Decrease
0.1%p
Increase
0.1%p
Decrease

Discount rate

PCBs W (14 ) 14 (17 ) 17
Nuclear plants (473,738 ) 490,380 (478,760 ) 495,645
Spent fuel (155,392 ) 166,417 (147,517 ) 157,989
Radioactive waste (13,454 ) 14,762 (13,625 ) 14,951

Inflation rate

PCBs 14 (14 ) 17 (17 )
Nuclear plants 531,471 (514,058 ) 523,954 (506,787 )
Spent fuel 166,982 (156,177 ) 158,525 (148,263 )
Radioactive waste 15,501 (14,203 ) 14,868 (13,625 )

137


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

Management judgment effected by uncertainties in underlying assumptions.

①

Foreign currency risk

The Group undertakes transactions denominated in foreign currencies; consequently, exposures to exchange rate fluctuations arise. The carrying amounts of the Group’s foreign currency denominated monetary assets and monetary liabilities as of June 30, 2026 and December 31, 2025 are as follows:

In thousands of foreign currencies Assets Liabilities

Type

As of June 30, 2026 As of December 31, 2025 As of June 30, 2026 As of December 31, 2025

AED

52,882 51,617 3,452 4,927

AUD

30 49 —  — 

BDT

2,247 2,251 —  — 

BWP

725 726 —  — 

CAD

1 579 —  — 

CHF

—  —  99,995 99,946

CZK

605 —  —  — 

DOP

4,783 6,378 —  — 

EGP

1,878,455 759,561 —  — 

EUR

209,877 89,734 87,450 44,482

GBP

143 90 —  — 

HKD

—  —  6,300,061 6,286,899

IDR

70,662,548 37,788,922 2,361,755 49,014,235

INR

1,045,332 1,175,785 148,977 161,578

JOD

1,472 646 198 433

JPY

986,070 60,443 837,942 746,066

KZT

—  1,485 —  — 

MGA

6,346,981 7,038,637 360,566 577,908

MMK

188,021 188,021 —  — 

MYR

1,202 2,805 —  — 

PHP

94,772 71,400 —  — 

PKR

63,777,268 64,839,210 10,418 10,418

RON

1,463 748 4 — 

SAR

1,034 1,069 —  — 

SEK

—  —  449,372 449,349

SGD

268 1,783 —  — 

USD

1,398,053 1,356,230 12,362,370 13,851,077

UYU

223,889 93,414 789 1,285

VND

1,168,489 772,198 —  — 

ZAR

65,736 84,167 —  — 

A sensitivity analysis on the Group’s profit before income tax and equity assuming a 10% increase and decrease in currency exchange rates as of June 30, 2026 and December 31, 2025 is as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Type

10% Increase 10% Decrease 10% Increase 10% Decrease

Increase (decrease) of profit before income tax

W (1,770,526) 1,770,526 (1,885,349 ) 1,885,349

Increase (decrease) of shareholder’s equity (*1)

(1,770,526 ) 1,770,526 (1,885,349 ) 1,885,349
(*1)

The effect on the shareholder’s equity excluding the impact of income taxes.

138


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

The sensitivity analysis above is conducted for monetary assets and liabilities denominated in foreign currencies other than functional currency, without consideration of hedge effect of related derivatives, as of June 30, 2026 and December 31, 2025.

To manage its foreign currency risk related to foreign currency denominated receivables and payables, the Group has a policy to enter into currency swap agreements. In addition, to manage its foreign currency risk related to foreign currency denominated expected sales transactions and purchase transactions, the Group enters into currency forward agreements.

There is an economic relationship between the hedged item and the hedging instrument as the terms of cross-currency swap agreement is consistent with the terms of expected transaction (repayment of foreign debt securities and others). The hedging ratio is 1:1 as the risk of cross-currency swap agreement matches the hedged item. As of June 30, 2026, the hedging instrument (cross-currency swap) hedges the risk of the hedged item (repayment of foreign debt securities and others).

②

Interest rate risk

The Group is exposed to interest rate risk due to its borrowing with floating interest rates. A 1%p increase or decrease is used when reporting interest rate risk internally to key management personnel and represents management’s assessment of the reasonably possible change in interest rates.

The Group’s borrowings and debt securities with floating interest rates as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

Type

As of June 30, 2026 As of December 31, 2025

Short-term borrowings

W 2,851,132 2,747,687

Long-term borrowings

12,088,846 10,787,203

Debt securities

1,737,228 1,619,967
W 16,677,206 15,154,857

A sensitivity analysis on the Group’s borrowings and debt securities assuming a 1%p increase and decrease in interest rates for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 is as follows:

In millions of won For the six-month period ended
June 30, 2026
For the year ended
December 31, 2025

Type

1%p Increase 1%p Decrease 1%p Increase 1%p Decrease

Increase (decrease) of profit before income tax

W (83,386) 83,386 (151,549 ) 151,549

Increase (decrease) of shareholder’s equity (*1)

(83,386) 83,386 (151,549 ) 151,549
(*1)

The effect on the shareholder’s equity excluding the impact of income taxes.

The Group manages its interest rate risk by having a balanced portfolio of fixed and variable rate loans and borrowings. To manage this, the Group enters into interest rate swaps, in which it agrees to exchange, at specified intervals, the difference between fixed and variable rate interest amounts calculated by reference to an agreed-upon notional principal amount. The above analysis measures the interest rate risk before reflecting the hedge effect by related derivatives.

139


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

③

Electricity rates risk

The Group is exposed to electricity rates risk due to changes in government regulations and policies on national power supply schemes and electricity billing rates, in consideration of the national economy.

A sensitivity analysis on the Group’s profit before income tax and equity assuming a 1% increase and decrease in price of electricity for the six-month periods ended June 30, 2026 and 2025 is as follows:

In millions of won For the six-month period ended
June 30, 2026
For the six-month period ended
June 30, 2025

Type

1% Increase 1% Decrease 1% Increase 1% Decrease

Increase (decrease) of profit before income tax

W  439,641 (439,641 ) 441,575 (441,575 )

Increase (decrease) of shareholder’s equity (*1)

439,641 (439,641 ) 441,575 (441,575 )
(*1)

The effect on the shareholder’s equity excluding the impact of income taxes.

(iv)

Liquidity risk

The Group has established an appropriate liquidity risk management framework for the management of the Group’s short, medium and long-term funding and liquidity management requirements. The Group manages liquidity risk by continuously monitoring forecasted and actual cash flows, and by matching the maturity profiles of financial assets and liabilities.

In addition, the Group has established credit lines on its trade financing and bank overdrafts, and through payment guarantees it has received, it maintains an adequate credit (borrowing) line. In addition, the Group has the ability to utilize excess cash or long-term borrowings for major construction investments.

The expected maturities of non-derivative financial liabilities as of June 30, 2026 and December 31, 2025 in detail are as follows:

In millions of won As of June 30, 2026

Type

Less than
1 year
1~2 Years 2~5 Years More than
5 years
Total

Borrowings

W  22,998,986 574,485 745,549 2,756,745 27,075,765

Debt securities

31,522,365 26,805,295 39,382,873 26,810,411 124,520,944

Lease liabilities

541,120 516,425 1,203,645 1,191,029 3,452,219

Trade and other payables (*1)

9,541,031 380,883 531,466 535,484 10,988,864

Financial guarantee contracts (*2)

3,743,906 —  —  —  3,743,906
W 68,347,408 28,277,088 41,863,533 31,293,669 169,781,698
(*1)

Excludes lease liabilities.

(*2)

The total amount represents the maximum exposure that the Group would be obliged to bear in the event of a financial guarantee occurrence, allocated to the earliest period in which the guarantee may be called upon. As of June 30, 2026, the Group has recognized W 46,727 million as a provision for financial guarantee contracts.

140


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

In millions of won As of December 31, 2025

Type

Less than
1 year
1~2 Years 2~5 Years More than
5 years
Total

Borrowings

W  20,100,531 597,717 792,513 2,512,018 24,002,779

Debt securities

29,172,320 28,897,889 37,383,870 24,539,981 119,994,060

Lease liabilities

526,324 473,319 1,140,684 1,407,310 3,547,637

Trade and other payables (*1)

8,111,566 343,906 618,231 425,896 9,499,599

Financial guarantee contracts (*2)

4,091,813 —  —  —  4,091,813
W 62,002,554 30,312,831 39,935,298 28,885,205 161,135,888
(*1)

Excludes lease liabilities.

(*2)

The total amount represents the maximum exposure that the Group would be obliged to bear in the event of a financial guarantee occurrence, allocated to the earliest period in which the guarantee may be called upon. As of December 31, 2025, the Group has recognized W 50,709 million as a provision for financial guarantee contracts.

As the Group manages liquidity based on net assets and net liabilities, information about non-derivative financial assets should be included in the disclosure for better understanding of liquidity risk management.

The expected maturities of non-derivative financial assets as of June 30, 2026 and December 31, 2025 in detail are as follows:

In millions of won As of June 30, 2026

Type

Less than
1 year
1~5 Years More than
5 years
Other (*) Total

Cash and cash equivalents

W 2,622,064 —  —  —  2,622,064

Financial assets at fair value through other comprehensive income

—  —  —  881,210 881,210

Financial assets at amortized cost

22,480 8,306 —  —  30,786

Loans and receivables

260,686 381,273 339,135 144,427 1,125,521

Long-term/short-term financial Instruments

1,356,293 15,035 9,322 872,135 2,252,785

Financial assets at fair value through profit or loss

1,798,808 328,544 661,954 495,547 3,284,853

Trade and other receivables

12,333,289 2,099,444 4,912,377 —  19,345,110
W  18,393,620 2,832,602 5,922,788 2,393,319 29,542,329
(*)

The maturities cannot be presently determined.

In millions of won As of December 31, 2025

Type

Less than
1 year
1~5 Years More than
5 years
Other (*) Total

Cash and cash equivalents

W 2,240,811 —  —  —  2,240,811

Financial assets at fair value through other comprehensive income

—  —  —  885,173 885,173

Financial assets at amortized cost

21,663 9,454 —  —  31,117

Loans and receivables

96,582 420,903 344,853 159,449 1,021,787

Long-term/short-term financial Instruments

1,997,644 19,423 —  865,064 2,882,131

Financial assets at fair value through profit or loss

1,309,159 325,496 681,967 487,841 2,804,463

Trade and other receivables

12,840,965 2,063,420 4,768,062 —  19,672,447
W  18,506,824 2,838,696 5,794,882 2,397,527 29,537,929
(*)

The maturities cannot be presently determined.

141


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(2)

Financial risk management, continued

Derivative liabilities classified by maturity periods from reporting date to maturity dates as per the contracts as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026

Type

Less than
1 year
1~2 Years 2~5 Years More than
5 years
Total

Net settlement

- Trading

W —  —  —  —  — 

Gross settlement

- Trading and others

(48,846 ) (18,987 ) 15,747 (57,924 ) (110,010 )

- Hedging

—  —  —  (135 ) (135 )
W (48,846) (18,987 ) 15,747 (58,059 ) (110,145 )
In millions of won As of December 31, 2025

Type

Less than
1 year
1~2 Years 2~5 Years More than
5 years
Total

Net settlement

- Trading

W —  —  —  —  — 

Gross settlement

- Trading and others

(53,973 ) (14,327 ) (10,395 ) (89,024 ) (167,719 )

- Hedging

—  —  —  (126 ) (126 )
W (53,973) (14,327 ) (10,395 ) (89,150 ) (167,845 )

142


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(3)

Fair value measurement

The fair value of financial instruments traded in active markets (such as financial assets at fair value through profit or loss and financial assets at fair value through other comprehensive income) is based on quoted market prices at the end of the reporting period. The quoted market price used for financial assets held by the Group is the current bid price.

The fair value of financial instruments that are not traded in an active market (e.g., over-the-counter derivatives) is determined by using valuation techniques. The Group uses a variety of valuation techniques and makes assumptions that are based on market conditions existing at the end of each reporting period.

For trade receivables and payables, the Group considers the carrying value net of impairment as fair value. While for disclosure purposes, the fair value of financial liabilities is estimated by discounting the future contractual cash flows based on current market interest rates applied to similar financial instruments.

(i)

Fair values and book values of financial assets and liabilities as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Type

Book value Fair value Book value Fair value

Assets recognized at fair value

Financial assets at fair value through other comprehensive income

W 881,210 881,210 885,173 885,173

Derivative assets (trading)

2,328,011 2,328,011 1,548,015 1,548,015

Derivative assets (applying hedge accounting)

461,170 461,170 487,535 487,535

Financial assets at fair value through profit or loss

2,501,966 2,501,966 1,995,226 1,995,226
W 6,172,357 6,172,357 4,915,949 4,915,949

Assets carried at amortized cost

Financial assets at amortized cost

W 30,786 30,786 31,117 31,117

Loans and receivables

1,088,155 1,088,155 986,528 986,528

Trade and other receivables

15,354,084 15,354,084 15,742,665 15,742,665

Long-term financial instruments

896,492 896,492 884,487 884,487

Short-term financial instruments

1,356,293 1,356,293 1,997,644 1,997,644

Cash and cash equivalents

2,622,064 2,622,064 2,240,811 2,240,811
W 21,347,874 21,347,874 21,883,252 21,883,252

Liabilities recognized at fair value

Derivative liabilities (trading)

W 125,967 125,967 165,373 165,373

Derivative liabilities (applying hedge accounting)

134 134 126 126
W 126,101 126,101 165,499 165,499

Liabilities carried at amortized cost

Secured borrowings

W 1,265,717 1,265,717 1,245,289 1,245,289

Unsecured bond

108,737,454 108,814,599 107,772,996 106,751,304

Lease liabilities

3,134,715 3,134,715 3,150,880 3,150,880

Unsecured borrowings

22,948,019 22,892,482 20,520,567 20,473,189

Trade and other payables (*1)

10,988,864 10,988,864 9,499,599 9,499,599

Overdraft

365,753 365,753 230,440 230,440
W 147,440,522 147,462,130 142,419,771 141,350,701
(*1)

Excludes lease liabilities

143


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(3)

Fair value measurement, continued

(ii)

Interest rates used for determining fair value

The interest rates used to discount estimated cash flows, when applicable, are based on the government yield curve at the reporting date plus an adequate credit spread.

The discount rates used for calculating fair value as of June 30, 2026 and December 31, 2025 are as follows:

Type

As of June 30, 2026 As of December 31, 2025

Derivatives

0.00% ~ 5.02% 0.00% ~ 4.88%

Borrowings and debt securities

0.39% ~ 5.84% 0.33% ~ 5.50%

Leases

3.46% ~ 17.85% 0.00% ~ 17.37%
(iii)

Fair value hierarchy

The following table provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, classified as Level 1, 2 or 3, based on the degree to which the fair value is observable.

Level 1: Unadjusted quoted prices in active markets for identical assets or liabilities;
Level 2: Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
Level 3: Inputs that are not based on observable market data.

Fair values of financial instruments by hierarchy level as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026

Type

Level 1 Level 2 Level 3 Total

Financial assets at fair value

Financial assets at fair value through other comprehensive income

W 517,447 —  363,763 881,210

Derivative assets

—  2,684,290 104,891 2,789,181

Financial assets at fair value through profit or loss

19,667 2,300,544 181,755 2,501,966
W 537,114 4,984,834 650,409 6,172,357

Financial liabilities at fair value

Derivative liabilities

W —  33,059 93,042 126,101
In millions of won As of December 31, 2025

Type

Level 1 Level 2 Level 3 Total

Financial assets at fair value

Financial assets at fair value through other comprehensive income

W 517,251 —  367,922 885,173

Derivative assets

—  1,937,554 97,996 2,035,550

Financial assets at fair value through profit or loss

—  1,988,813 6,413 1,995,226
W 517,251 3,926,367 472,331 4,915,949

Financial liabilities at fair value

Derivative liabilities

W —  75,185 90,314 165,499

The fair value of financial assets traded in the market (including those measured at FVTPL and FVOCI) is measured at the closing bid price quoted at the end of the reporting period. Meanwhile, the fair value of unmarketable financial assets (including those measured at FVTPL and FVOCI) is calculated using the fair value measurement performed by external pricing service agents. In addition, the Group considered the major economic indicators and economic environment of the derivatives to be evaluated, and measured the fair value of the derivatives using a discounted cash flow model that reflects the Group’s credit risk.

144


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

44.

Risk Management, Continued

(3)

Fair value measurement, continued

Changes in financial assets and liabilities which are classified as level 3 for the six-month period ended June 30, 2026 and for the year ended December 31, 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Beginning
balance
Acquisitions Reclassified
category
Valuation Disposal Foreign
currency
translation
and others
Ending
balance

Financial assets at fair value:

Financial assets at fair value through profit or loss

Cooperative

W 6,413 —  —  167 (21 ) —  6,559

Unlisted securities

—  3,323 35,501 5,802 (15,209 ) 19,098 48,515

Debt securities

—  7,000 4,909 —  —  —  11,909

Compound financial instruments

—  7,500 108,272 —  (1,000 ) —  114,772

Financial assets at fair value through other comprehensive income

Unlisted securities

363,128 —  —  3,244 (8,805 ) 1,402 358,969

Debt securities

4,794 —  —  —  —  —  4,794

Derivatives

Other derivative assets

97,996 —  —  —  —  6,896 104,892

Financial liabilities at fair value:

Derivatives

Other derivative liabilities

90,314 —  —  —  —  2,729 93,043
In millions of won For the year ended December 31, 2025
Beginning
balance
Acquisitions Reclassified
category
Valuation Disposal Foreign
currency
translation
and others
Ending
balance

Financial assets at fair value:

Financial assets at fair value through profit or loss

Cooperative

W 6,872 —  —  (459 ) —  —  6,413

Financial assets at fair value through other comprehensive income

Unlisted securities

309,709 —  —  52,343 (10 ) 1,086 363,128

Debt securities

5,045 —  —  (251 ) —  —  4,794

Derivatives

Other derivative assets

—  7,496 129,359 8,293 (53,373 ) 6,221 97,996

Financial liabilities at fair value:

Derivatives

Other derivative liabilities

—  3 170,244 (11,282 ) (67,752 ) (899 ) 90,314

145


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

45.

Service Concession Arrangements

(1)

Hydroelectric Power Generation at Semangka, Indonesia

(i)

Significant terms and concession period of the arrangement

Regarding Semangka hydroelectric power-generation business in Indonesia, the Group has entered into a contract with PT. Perusahaan Listrik Negara (the “PT PLN”) whereby the Group shall provide electricity generated for about 30 years (2018 – 2048) subsequent to the completion of plant construction and shall receive tariffs consisting of capital cost recovery tariff, fixed O&M cost recovery tariff, river water usage fee recovery tariff, variable O&M cost recovery tariff and transmission-line investment recovery tariff during the concession period.

(ii)

Rights to use the specified assets

The Group has the rights to use, own and operate the power plant during the concession period from 2018 to 2048. At the end of the concession period, PT PLN has an option to take over the ownership of the power plant from the Group.

(iii)

Classification method

This project allows PT PLN to acquire ownership of the plant after the end of the 30 years concession period.

(iv)

The Group’s expected future collections of service concession arrangements as of June 30, 2026 are as follows:

In millions of won

Type

Amounts

Less than 1 year

W 35,596

1 ~ 2 years

35,596

2 ~ 3 years

35,596

Over 3 years

521,725
W 628,513

146


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

45.

Service Concession Arrangements, Continued

(2)

Pakistan Gulpur Hydropower Project

(i)

Significant terms and concession period of the arrangement

The Group has entered into a contract with CPPAg (Central Power Purchasing Agency Guarantee Limited) whereby the Group shall provide electricity generated for approximately 30 years (2020 – 2050) subsequent to the completion of plant construction and shall receive tariffs consisting of capital cost recovery tariff, borrowing cost recovery tariff, variable O&M cost recovery tariff, fixed O&M cost recovery tariff, water usage fee recovery tariff and insurance cost recovery tariff during the contract period.

(ii)

Rights to use the specified assets

The Group has the rights to use, own and operate the power plant during the concession period from 2020 to 2050. The Government of Pakistan has an option to take over the ownership of the power plant from the Group after the concession period has elapsed.

(iii)

Classification method

This project allows the Government of Pakistan to acquire ownership of the plant after the end of the concession period.

(iv)

The Group’s expected future collections of service concession arrangements as of June 30, 2026 are as follows:

In millions of won

Type

Amounts

Less than 1 year

W 81,654

1 ~ 2 years

81,654

2 ~ 3 years

81,654

Over 3 years

824,430
W 1,069,392

147


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

45.

Service Concession Arrangements, Continued

(3)

Guam Ukudu Combined thermal power plant Project

(i)

Significant terms and concession period of the arrangement

The Group has entered into a contract with Guam Power Authority whereby the Group shall provide electricity generated for approximately 25 years (from 2025 to 2050) subsequent to the completion of plant construction and shall receive charge tariff rates designed to recover variable O&M cost, fixed O&M cost and others during the concession period.

(ii)

Rights to use the specified assets

The Group has the rights to use, own and operate the power plant during the concession period from 2025 to 2050. The Guam Power Authority takes over the ownership of the power plant from the Group after the concession period has elapsed.

(iii)

Classification method

This project allows the Guam Power Authority to acquire ownership of the plant after the end of the concession period.

(iv)

The Group’s expected future collections of service concession arrangements as of June 30, 2026 are as follows:

In millions of won

Type

Amounts

Less than 1 year

W 123,806

1 ~ 2 years

124,938

2 ~ 3 years

115,494

Over 3 years

2,946,779
W 3,311,017

148


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties

(1)

The Group’s related parties as of June 30, 2026 are as follows:

Type

Related party

Parent

Republic of Korea government

Subsidiaries

(169 subsidiaries)

Korea Hydro & Nuclear Power Co., Ltd., Korea South-East Power Co., Ltd., Korea Midland Power Co., Ltd., Korea Western Power Co., Ltd., Korea Southern Power Co., Ltd., Korea East-West Power Co., Ltd., KEPCO Engineering & Construction Company, Inc., KEPCO Plant Service & Engineering Co., Ltd., KEPCO Nuclear Fuel Co., Ltd., KEPCO KDN Co., Ltd., Gyeonggi Green Energy Co., Ltd., Korea Offshore Wind Power Co., Ltd., KOSEP Material Co., Ltd., KEPCO International HongKong Ltd., KEPCO International Philippines Inc., KEPCO Philippines Corporation, KEPCO Ilijan Corporation, KEPCO Gansu International Ltd., KEPCO Philippines Holdings Inc., KEPCO Neimenggu International Ltd., KEPCO Australia Pty., Ltd., KEPCO Shanxi International Ltd., KOMIPO Global Pte Ltd., KOSEP Australia Pty., Ltd., KOMIPO Australia Pty., Ltd., KOWEPO Australia Pty., Ltd., KOSPO Australia Pty., Ltd., KEPCO Netherlands B.V., KEPCO Middle East Holding Company, Qatrana Electric Power Company, KOWEPO International Corporation, KOSPO Jordan LLC, Korea Waterbury Uranium Limited Partnership, PT. Cirebon Power Service, EWP America Inc., KHNP Canada Energy Ltd., KEPCO Bylong Australia Pty., Ltd., KNF Canada Energy Limited, KEPCO Holdings de Mexico, KST Electric Power Company, S.A.P.I. de C.V., KEPCO Energy Service Company, KEPCO Netherlands S3 B.V., PT. KOMIPO Pembangkitan Jawa Bali, EWP Barbados 1 SRL, PT. Tanggamus Electric Power, KOMIPO America Inc., PT. EWP Indonesia, KEPCO Netherlands J3 B.V., Global One Pioneer B.V., Global Energy Pioneer B.V., Mira Power Limited, KEPCO KPS Philippines Corp., KOSPO Chile SpA, Gyeongju Wind Power Co., Ltd., California Power Holdings, LLC, EWP Renewable Corporation, Hee Mang Sunlight Power Co., Ltd., Fujeij Wind Power Company, KOSPO Youngnam Power Co., Ltd., Chitose Solar Power Plant LLC., KEPCO Solar Co., Ltd., KEPCO ES Co., Ltd., KOSPO Power Services Ltda., KOEN Bylong Pty., Ltd., KOWEPO Bylong Pty., Ltd., KOSPO Bylong Pty., Ltd., EWP Bylong Pty., Ltd., KOWEPO Lao International, KOMIPO Bylong Pty., Ltd., Energy New Industry Specialized Investment Private Investment Trust., KEPCO Mangilao Holdings LLC, Mangilao Investment LLC, KEPCO Mangilao Solar, LLC, Jeju Hanlim Offshore Wind Co., Ltd., PT. Siborpa Eco Power, e-New Industry LB Fund 1, BSK E-New Industry Fund VII, PT. Korea Energy Indonesia, KOLAT SpA, KEPCO California, LLC, KEPCO Mojave Holdings, LLC, Incheon Fuel Cell Co., Ltd., KOEN Service Co., Ltd., KOMIPO Service Co., Ltd., KOWEPO Service Co., Ltd., KOSPO Service Co., Ltd., EWP Service Co., Ltd., PT. KOMIPO Energy Indonesia, KNF Partners Co., Ltd., KOSPO USA Inc., KOSPO Niles LLC (formerly, Nambu USA LLC), Tamra Offshore Wind Power Co., Ltd., KEPCO MCS Co., Ltd., KEPCO FMS Co., Ltd., Firstkeepers Co., Ltd., Secutec Co., Ltd., SE Green Energy Co., Ltd., Mangilao Intermediate Holdings LLC, KEPCO CSC Co., Ltd., KOAK Power Limited, KOMIPO Europe B.V., Haenanum Energy Fund, Paju Ecoenergy Co., Ltd., Guam Ukudu Power LLC, K-SOLAR SHINAN Co., Ltd., KPS Partners Co., Ltd., KEPCO E&C Service Co., Ltd., Moha solar Co., Ltd., KHNP USA LLC, KOMIPO Vanphong Power Service LLC, Ogiri Solar Power Co., Ltd., BSK E-New Industry Fund X, Energy Innovation Fund I, KHNP Chile SpA, Yeong Yang Apollon Photovoltaic Co., Ltd., Yeong Yang Corporation Co., Ltd., SolarVader Co., Ltd., Yeong Yang Innovation Co., Ltd., Yeong Yang Horus Photovoltaic Co., Ltd., Yeong Yang Solar Management Co., Ltd., LSG Hydro Power Limited, KOEN Bio Co., Ltd., KOMIPO Energy Solution America, LLC, Elara Investment Holdings, LLC, Elara Equity Holdings, LLC, Elara Class B Holdings, LLC, Elara Class B Member, LLC, Elara Development Holdings, LLC, KOMIPO Development, LLC, Elara Energy Holdings, LLC, Elara Energy Project, LLC, KOMIPO Iberian Solar Group, S.L.U., KOWEPO Europe B.V., CVS Equity Holdings, LLC, CVS Class B Holdings, LLC, CVS Development Holdings, LLC, CVS Development, LLC, CVS Class B Member, LLC, CVS Energy Holdings, LLC, Concho Valley Energy, LLC, Concho Valley Solar, LLC, Jeongam Wind Power Co., Ltd., Yeongdeok Sunrise Wind Power Co., Ltd., UI Carbon-Neutrality Fund, KA Power Limited, Western Power Changgi Solar Co., Ltd., EWP Australia Pty., Ltd., Columboola Solar Farm Hold Co Pty., Ltd., Digital Innovation Growth Fund, KEPCO Holding Company, KEPCO for Maintenance Company, KOSPO Trumbull LLC, Changjuk Wind Power Co., Ltd., KEPCO KPS South Africa Pty., Ltd., Chile Solar JV SpA, KOWEPO Holding Limited, Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust, Columboola Solar Farm Fin Co Pty., Ltd., Magna Energy New Industrial Fund, EWP ESS Holdings, LLC, Fairhaven ESS LLC, KOSPO Rutile, LLC, KEPCO Yona America LLC, EWP Yona America LLC, KEPCO SADAWI – FZCO, KOMIPO Middle East Energy L.L.C-FZ, Nuclear Energy Industry Growth Fund II, UI Carbon-Neutrality Fund II

149


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(1)

The Group’s related parties as of June 30, 2026 are as follows, continued:

Type

Related party

Associates

(110 entities)

(*1)

Dongducheon Dream Power Co., Ltd., Korea Gas Corporation, Daegu Photovoltaic Co., Ltd., Haeng Bok Do Si Photovoltaic Power Co., Ltd., Korea Electric Power Industrial Development Co., Ltd., Goseong Green Power Co., Ltd., Gangneung Eco Power Co., Ltd., Shin Pyeongtaek Power Co., Ltd., Noeul Green Energy Co., Ltd., Gangwon Wind Power Co., Ltd., Gwangyang Green Energy Co., Ltd., Hyundai Green Power Co., Ltd., Korea Power Exchange, Taebaek Guinemi Wind Power Co., Ltd., Daeryun Power Co., Ltd., KNH Solar Co., Ltd., S-Power Co., Ltd., SPC Power Corporation, Gemeng International Energy Co., Ltd., PT. Cirebon Electric Power, KNOC Nigerian East Oil Co., Ltd., KNOC Nigerian West Oil Co., Ltd., PT Wampu Electric Power, PT. Bayan Resources TBK, Nepal Water & Energy Development Company Private Limited, Xe-Pian Xe-Namnoy Power Co., Ltd., PT. Mutiara Jawa, Jinbhuvish Power Generation Pvt. Ltd., Daejung Offshore Wind Power Co., Ltd., GS Donghae Electric Power Co., Ltd., Busan Green Energy Co., Ltd., Hansuwon KNP Co., Ltd., Korea Electric Power Corporation Fund, Energy Infra Asset Management Co., Ltd., Yaksu ESS Co., Ltd., PND Solar Co., Ltd., Hyundai Eco Energy Co., Ltd., YeongGwang Yaksu Wind Electric Co., Ltd., Green Energy Electricity Generation Co., Ltd., Korea Energy Solutions Co., Ltd., ITR Co., Ltd., STN Co., Ltd., Indeck Niles Development, LLC, Indeck Niles Asset Management, LLC, Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1, Gwangbaek Solar Power Investment Co., Ltd., Godeok Clean Energy Co., Ltd., SureDataLab Co., Ltd., SEP Co., Ltd., Hankook Electric Power Information Co., Ltd., Tronix Co., Ltd., O2&B Global Co., Ltd., Muan Sunshine Solar Power Plant Co., Ltd., Bigeum Resident Photovoltaic Power Co., Ltd., Goesan Solar park Co., Ltd., Saemangeum Heemang Photovoltaic Co., Ltd., Bitgoel Eco Energy Co., Ltd., Jeju Gimnyeong Wind Power Co., Ltd., Seoroseoro Sunny Power Plant Co., Ltd., Muan Solar Park Co., Ltd., YuDang Solar Co., Ltd., Anjwa Smart Farm & Solar City Co., Ltd., KPE Green Energy Co., Ltd., G.GURU Co., Ltd., UD4M Co., Ltd., Dongbu Highway Solar Co., Ltd., Seobu Highway Solar Co., Ltd., Korea Energy Data Co., Ltd., Gangneung Sacheon Fuel Cell Co., Ltd., Taebaek Gadeoksan Wind Power Co., Ltd., Chuncheon Green Energy Co., Ltd., Yeomsubong Wind Power Co., Ltd., Yeongyang Wind Power Corporation II, Haeparang Energy Co., Ltd., Saemangeum Sebit Power Plant Co., Ltd., PlatformN. Co., Ltd., PT. Cirebon Energi Prasarana, Future Convergence Technology Laboratory. Co., Ltd., ECO Motion Co., Ltd., REC’s Innovation Co., Ltd., ACE, Co., Ltd., Environment and Energy Co., Ltd., Green Radiation Co., Ltd., Santiago Solar Power SpA, Yanggu Floating Photovoltaic Power Plant Inc., Changwon SG energy Co., Ltd., Donpyung Technology. Co., Ltd., Power Embedded, HORANG ENERGY Inc., Hoenggye Renewable Energy Co., Ltd., Haman Green Energy Co., Ltd., Songsan Green Energy Co., Ltd., SkyPic Inc., HyChangwon Fuel Cell. Co., Ltd., Dreams Co., Ltd., DEEPAI Co., Ltd., Amaala Sustainable Company for Energy LLC, Remal First Holding Company, Naseem First Holding Company, Cheonwang Green Energy Co., Ltd., Namjeju Bitdream Energy Co., Ltd., Jeju Bukchon BES Power Co., Ltd., Commerce and Industry Energy Co., Ltd., Gunsan Green Energy Co., Ltd., KI Tech Co., Ltd., Enlight Energy Advanced Industry Venture Fund, Shinan-Ui Offshore Wind Power Co., Ltd., Daebul Green Power Co., Ltd., Hapcheon Floating Photovoltaic Power Plant II Inc., VL Gustav Private Equity Limited Partnership

Joint ventures

(127 entities)

(*1)

Daegu Green Power Co., Ltd., KEPCO SPC Power Corporation, KAPES, Inc., Honam Wind Power Co., Ltd., Korea Power Engineering Service Co., Ltd., Seokmun Energy Co., Ltd., Incheon New Power Co., Ltd., Chun-cheon Energy Co., Ltd., Yeonggwangbaeksu Wind Power Co., Ltd., KW Nuclear Components Co., Ltd., Busan Shinho Solar Power Co., Ltd., Global Trade Of Power System Co., Ltd., Expressway Solar-light Power Generation Co., Ltd., Gansu Datang Yumen Wind Power Co., Ltd., Datang Chifeng Renewable Power Co., Ltd., Rabigh Electricity Company, Rabigh Operation & Maintenance Company Limited, Datang KEPCO Chaoyang Renewable Power Co., Ltd., Shuweihat Asia Power Investment B.V., Shuweihat Asia Operation & Maintenance Company, Waterbury Lake Uranium L.P., ASM-BG Investicii AD, RES Technology AD, Jamaica Public Service Company Limited, KV Holdings, Inc., Amman Asia Electric Power Company, Kelar S.A., PT. Tanjung Power Indonesia, Nghi Son 2 Power LLC, Daehan Wind Power PSC, MOMENTUM, Barakah One Company, Nawah Energy Company, Yeonggwang Wind Power Co., Ltd., Chester Solar IV SpA, Chester Solar V SpA, Diego de Almagro Solar SpA, South Jamaica Power Company Limited, Daesan Green Energy Co., Ltd., RE Holiday Holdings LLC, RE Pioneer Holdings LLC, RE Barren Ridge 1 Holdings LLC, RE Astoria 2 LandCo LLC, RE Barren Ridge LandCo LLC, Laurel SpA, KIAMCO KOWEPO Bannerton Hold Co Pty Ltd, Cheong-Song Noraesan Wind Power Co., Ltd., Chester Solar I SpA, Solar Philippines Calatagan Corporation, Saemangeum Solar Power Co., Ltd., Chungsongmeon BongSan wind power Co., Ltd., Jaeun Resident Wind Power Plant Co., Ltd., Dangjin Eco Power Co., Ltd., Haemodum Solar Co., Ltd., Yangyang Wind Power Co., Ltd., Horus Solar, S.A. de C.V., Recursos Solares PV de Mexico II, S.A. de C.V., Sunmex Renovables, S.A. de C.V., Stavro Holding II A.B., Solaseado Solar Power Co., Ltd., Yeongam Solar Power Co., Ltd., Samsu Wind Power Co., Ltd., Pulau Indah Power Plant Sdn. Bhd., NH-Amundi Global Infrastructure Investment Private Investment Trust 21, Shin-han BNPP Private Investment Trust for East-West Sunlight Dream, PT Barito Wahana Tenaga, Cheongna Energy Co., Ltd., Boim Combined Heat and Power Generation Co., Ltd., OneEnergy Asia Limited, KAS INVESTMENT I LLC, KAS INVESTMENT II LLC, Energyco Co., Ltd., CAES, LLC, Hapcheon Floating Photovoltaic Power Plant Inc., Busan Industrial Solar Power Co., Ltd., Bitsolar Energy Co., Ltd., Naepo Green Energy Co., Ltd., Pulau Indah O&M Sdn. Bhd., Guadalupe Solar SpA, Omisan Wind Power Co., Ltd., Foresight Iberian Solar Group Holding, S.L., Yeongwol Eco Wind Co., Ltd., Gurae Resident Power Co., Ltd., Cheongju Eco Park Co., Ltd., Prime Swedish Holding AB, Enel X Midland Photovoltaic, LLC, Geumsungsan Wind Power Co., Ltd., KEPCO KPS CARABAO Corp., Goheung New Energy Co., Ltd., Gunsan Land Solar Co., Ltd., International Offshore Power Transmission Holding Company Limited, Eumseong Eco Park Co., Ltd., Changwon Nu-ri Energy Co., Ltd., PungBack Wind Farm Corporation, Seobusambo highway photovoltaics Co., Ltd., Seokmun Green Energy, Pyeongchang Wind Power Co., Ltd., Trumbull Asset Management, LLC, S-Power Chile SpA, Taebaek Wind Power Co., Ltd., Yangyang Suri Wind Power Co., Ltd., KEPCO for Power Company, Kumyang Eco Park Co., Ltd., Jeongeup Green Power Co., Ltd., Namyangju Combined Heat and Power Co., Ltd., Wadi Noor Solar Power Company SAOC, Rutile BESS Holdings, LLC, Trumbull Development Partners, LLC, Samcheok Eco Materials Co., Ltd., Imha Floating Photovoltaic Power Plant Inc., Roof One Energy Co., Ltd., EDFR KOWEPO AJBAN PV HOLDING LIMITED, Taean Haetdeulwon Solar Co., Ltd., Haetbyeotgil Solar Co., Ltd., KES Yona Holdings L.L.C, Siraj AlTaqa AlNazifa, Seongseo Neulpureun Energy Co., Ltd., Luluah SKY Energy Holding Ltd., Nour Ibri Solar Power Company, Lucy Equity Holdings, LLC, Grove Energy Capital IV, LLC, Gwangju Solarlink Co., Ltd., Solarlink Inverter Co., Ltd., Balgeun Jindo Energy Storage Co., Ltd., Goheung Naro Energy Storage Co., Ltd., Coastal Power SAOC, EDFPS KOWEPO ZARRAF PV HOLDING LIMITED

Others

(1 entity)

Korea Development Bank
(*1)

Subsidiaries of associates and joint ventures are included.

150


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(2)

Transactions between the Group and its subsidiaries are eliminated during the consolidation and are not disclosed in notes.

(3)

The related party transactions for the six-month periods ended June 30, 2026 and 2025 are as follows:

<Sales and Others>

In millions of won Sales and others

Company name

Transaction type

June 30, 2026 June 30, 2025

<Associates>

Korea Gas Corporation

Fuel purchase and others W 172,395 109,605

Goseong Green Power Co., Ltd.

Electricity sales 264,654 224,912

Dongducheon Dream Power Co., Ltd.

Electricity sales 5,096 12,062

S-Power Co., Ltd.

Service 1,257 1,022

GS Donghae Electric Power Co., Ltd.

Electricity sales 4,990 17,537

Shin Pyeongtaek Power Co., Ltd.

Electricity sales 28,459 11,799

Gangneung Eco Power Co., Ltd.

Fuel sales 228,517 223,458

Korea Electric Power Industrial Development Co., Ltd.

Service 6,614 6,729

PT. Bayan Resources TBK

Dividends income and others 153,194 — 

Indeck Niles Development, LLC

Dividends income 125,149 5,871

Korea Power Exchange

Service 15,101 16,943

Gemeng International Energy Co., Ltd.

Dividends income 40,867 20,644

Chuncheon Green Energy Co., Ltd.

Electricity sales 11,927 10,447

Gangneung Sacheon Fuel Cell Co., Ltd.

Electricity sales 6,968 6,039

Taebaek Gadeoksan Wind Power Co., Ltd.

Electricity sales 5,904 3,411

KPE Green Energy Co., Ltd.

Others 108 100

Yeongyang Wind Power Corporation II

Commission 2,405 — 

Gangwon Wind Power Co., Ltd.

Electricity sales 1,512 1,480

Godeok Clean Energy Co., Ltd.

Electricity sales 1,889 615

Bitgoel Eco Energy Co., Ltd.

Service and others 577 1,069

Noeul Green Energy Co., Ltd.

REC purchase and others 3,768 3,725

Others (Hyundai Eco Energy Co., Ltd. and 56 others)

Electricity sales 30,430 33,546

151


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(3)

The related party transactions for the six-month periods ended June 30, 2026 and 2025 are as follows, continued:

In millions of won Sales and others

Company name

Transaction type

June 30, 2026 June 30, 2025

<Joint ventures>

Chun-cheon Energy Co., Ltd.

Electricity sales

W 1,460 482

Daegu Green Power Co., Ltd.

Electricity sales

973 999

Daesan Green Energy Co., Ltd.

Electricity sales

227 81

KAPES, Inc.

Others

134 2,060

Amman Asia Electric Power Company

Construction revenue and others

44,289 12,729

Solaseado Solar Power Co., Ltd.

Electricity sales

8,705 502

Seokmun Energy Co., Ltd.

REC purchase and others

1,099 1,031

Cheongju Eco Park Co., Ltd.

Electricity sales

89 93

Yeongam Solar Power Co., Ltd.

Electricity sales

1,422 245

Datang Chifeng Renewable Power Co., Ltd.

Dividends income

13,830 — 

Naepo Green Energy Co., Ltd.

Electricity sales

13,791 15,122

Yeonggwang Wind Power Co., Ltd.

Electricity sales

543 534

Cheongna Energy Co., Ltd.

Others

12,787 26,031

Kelar S.A.

Service and interest income

12,122 10,070

Boim Combined Heat and Power Generation Co., Ltd.

Power generation service revenue and others

5,074 1,363

Eumseong Eco Park Co., Ltd.

Electricity sales

10 10

Seokmun Green Energy Co., Ltd.

Electricity sales

31 30

Goheung New Energy Co., Ltd.

Electricity sales

3,189 108

Yeonggwangbaeksu Wind Power Co., Ltd.

Electricity sales

1,037 1,009

KEPCO SPC Power Corporation

Dividends income and others

7,828 818

Others (Namyangju Combined Heat and Power Co., Ltd. and 61 others)

Electricity sales

123,568 144,883

<Others>

Korea Development Bank

Electricity fees and others

2,653 2,544

Interest income

1,961 3,728
W 1,368,603 935,486

152


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(3)

The related party transactions for each of the six-month periods ended June 30, 2026 and 2025 are as follows, continued:

<Purchase and Others>

In millions of won Purchase and others

Company name

Transaction type June 30, 2026 June 30, 2025

<Associates>

Korea Gas Corporation

Fuel purchase and others W  2,808,452 2,834,688

Goseong Green Power Co., Ltd.

Electricity sales 546,763 504,481

Dongducheon Dream Power Co., Ltd.

Electricity sales 517,812 614,531

S-Power Co., Ltd.

Service 306,920 344,711

GS Donghae Electric Power Co., Ltd.

Electricity sales 268,252 244,817

Shin Pyeongtaek Power Co., Ltd.

Electricity sales 215,453 368,957

Gangneung Eco Power Co., Ltd.

Fuel sales 106 70

Korea Electric Power Industrial Development Co., Ltd.

Service 186,915 162,675

PT. Bayan Resources TBK

Dividends income and others 39,237 34,835

Daeryun Power Co., Ltd.

Electricity sales 156,627 143,442

Korea Power Exchange

Service 78,126 10,687

Chuncheon Green Energy Co., Ltd.

Electricity sales 26,487 35,812

Gangneung Sacheon Fuel Cell Co., Ltd.

Electricity sales 17,391 24,014

Taebaek Gadeoksan Wind Power Co., Ltd.

Electricity sales 14,138 16,928

KPE Green Energy Co., Ltd.

Others 18,702 20,525

Yeongyang Wind Power Corporation II

Commission 12,000 12,367

Gangwon Wind Power Co., Ltd.

Electricity sales 13,064 15,463

Godeok Clean Energy Co., Ltd.

Electricity sales 12,336 14,988

Bitgoel Eco Energy Co., Ltd.

Service and others 13,275 6,533

Noeul Green Energy Co., Ltd.

REC purchase and others 9,967 14,008

Haman Green Energy Co., Ltd.

REC purchase 13,596 4,408

Others (Hyundai Eco Energy Co., Ltd. and 56 others)

Electricity sales 136,549 141,757

153


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(3)

The related party transactions for each of the six-month periods ended June 30, 2026 and 2025 are as follows, Continued

In millions of won Purchase and others

Company name

Transaction type June 30, 2026 June 30, 2025

< Joint ventures >

Chun-cheon Energy Co., Ltd.

Electricity sales W 190,083 190,770

Daegu Green Power Co., Ltd.

Electricity sales 131,578 152,187

Daesan Green Energy Co., Ltd.

Electricity sales 83,299 87,046

KAPES, Inc.

Others 46,892 102,054

Solaseado Solar Power Co., Ltd.

Electricity sales 17,098 16,564

Seokmun Energy Co., Ltd.

REC purchase and others 24,314 28,504

Cheongju Eco Park Co., Ltd.

Electricity sales 19,842 20,200

Yeongam Solar Power Co., Ltd.

Electricity sales 15,379 16,201

Datang Chifeng Renewable Power Co., Ltd.

Dividends income —  — 

Yeonggwang Wind Power Co., Ltd.

Electricity sales 12,785 16,779

Cheongna Energy Co., Ltd.

Others 63 63

Boim Combined Heat and Power Generation Co., Ltd.


Power generation service
revenue and others

6,232 2,062

Eumseong Eco Park Co., Ltd.

Electricity sales 10,736 11,446

Seokmun Green Energy Co., Ltd.

Electricity sales 10,524 14,883

Goheung New Energy Co., Ltd.

Electricity sales 7,152 5,805

Yeonggwangbaeksu Wind Power Co., Ltd.

Electricity sales 7,100 6,380

KEPCO SPC Power Corporation

Dividends income and others —  — 

Others (Namyangju Combined Heat and Power Co., Ltd. and 61 others)

Electricity sales 55,351 79,081

<Others>

Korea Development Bank

Electricity fees and others —  — 
Interest income —  — 
Interest expense 1,374 4,862
Dividends paid 325,725 — 
W  6,377,695 6,325,584

154


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(4)

Receivables and payables arising from the related party transactions as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won Receivables Payables

Company name

Type

June 30,
2026
December 31,
2025
June 30,
2026
December 31,
2025

<Associates>

Korea Gas Corporation

Trade receivables W  110,498 15,486 —  — 
Non-trade receivables and others 21,811 447 —  — 
Trade payables —  —  415,596 381,353
Non-trade payables and others —  —  60 466

Goseong Green Power Co., Ltd.

Trade receivables 25,083 69,535 —  — 
Non-trade receivables and others 719 16 —  — 
Trade payables —  —  81,928 112,314
Non-trade payables and others —  —  39,388 41,070

GS Donghae Electric Power Co., Ltd.

Trade receivables 702 975 —  — 
Non-trade receivables and others 101 109 —  — 
Trade payables —  —  191,115 154,984
Non-trade payables and others —  —  55 17

Dongducheon Dream Power Co., Ltd.

Trade receivables 609 1,254 —  — 
Non-trade receivables and others 413 637 —  — 
Trade payables —  —  96,788 58,610

PT. Bayan Resources TBK

Non-trade receivables and others 82,634 —  —  — 
Trade payables —  —  7,737 5,899

S-Power Co., Ltd.

Trade receivables 112 360 —  — 
Non-trade receivables and others 64 60 —  — 
Trade payables —  —  58,002 49,089

Busan Green Energy Co., Ltd.

Trade receivables 1 2 —  — 
Non-trade receivables and others 53,429 50,846 —  — 
Non-trade payables and others —  —  4,051 3,688

Chuncheon Green Energy Co., Ltd.

Non-trade receivables and others 43,302 31,676 —  — 
Non-trade payables and others —  —  9,415 14,305

Gangneung Eco Power Co., Ltd.

Trade receivables 29,223 29,354 —  — 
Trade payables —  —  13,936 — 
Non-trade payables and others —  —  271 1,071

Others (Noeul Green Energy Co., Ltd. and 50 others)

Trade receivables 14,297 13,572 —  — 
Non-trade receivables and others 124,712 96,771 —  — 
Trade payables —  —  72,514 106,174
Non-trade payables and others —  —  64,585 38,017

155


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(4)

Receivables and payables arising from the related party transactions as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won Receivables Payables

Company name

Type

June 30,
2026
December 31,
2025
June 30,
2026
December 31,
2025

<Joint ventures>

KEPCO for Power Company

Non-trade receivables and others W 60,392 1,011 —  — 

Kelar S.A.

Trade receivables 3,845 3,504 —  — 
Non-trade receivables and others 43,935 38,193 —  — 

Chun-cheon Energy Co., Ltd.

Trade receivables 138 307 —  — 
Non-trade receivables and others 165 222 —  — 
Trade payables —  —  34,853 23,654
Non-trade payables and others —  —  2 — 

Boim Combined Heat and Power Generation Co., Ltd.

Trade receivables 46 46 —  — 
Non-trade receivables and others 4,132 5,045 —  — 
Trade payables —  —  1,182 861
Non-trade payables and others —  —  27,449 27,834

SUNMEX RENOVABLES, S.A. DE C.V.

Non-trade receivables and others 29,673 3,856 —  — 

Others (Daegu Green Power Co., Ltd. and 66 others)

Trade receivables 315,351 363,580 —  — 
Non-trade receivables and others 77,880 218,113 —  — 
Trade payables —  —  50,655 41,392
Non-trade payables and others —  —  74,360 63,207

<Others>

Korea Development Bank

Accrued Interest Receivable 243 1,642 —  — 
Non-trade receivables and others 32,984 32,354 —  — 
Non-trade payables and others —  —  325,769 44
Derivatives 298,375 183,662 —  1,085
W  1,374,869 1,162,635 1,569,711 1,125,134

156


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(5)

Loans and others arising from the related party transactions as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

Type

Company name

Beginning
balance
Loans Collection Others Ending
balance

Associates

KNOC Nigerian East Oil Co., Ltd.,

KNOC Nigerian West Oil Co., Ltd.

W 33,776 597 —  —  34,373
(Allowance for doubtful accounts) (33,776 ) (597 ) —  —  (34,373 )

Associates

Xe-Pian Xe-Namnoy Power Co., Ltd. 25,971 —  —  1,929 27,900

Associates

PT. Cirebon Energi Prasarana 50,674 3,043 (17,956 ) 3,754 39,515

Associates

Daejung Offshore Wind Power Co., Ltd. 1,000 —  —  —  1,000

Associates

Bitgoel Eco Energy Co., Ltd. 22,507 —  (1,953 ) —  20,554

Associates

Saemangeum Sebit Power Plant Co., Ltd. 21,802 —  (760 ) —  21,042

Associates

Remal First Holding Company 1 —  —  —  1

Associates

Naseem First Holding Company 1 —  —  —  1

Associates

Jeju Bukchon BES Power Co., Ltd. 7,380 —  —  —  7,380

Associates

Gunsan Green Energy Co., Ltd. 627 —  —  —  627

Associates

Hoenggye Renewable Energy Co., Ltd. —  2,407 —  —  2,407

Joint ventures

Solaseado Solar Power Co., Ltd. 33,930 —  (509 ) —  33,421

Joint ventures

Recursos Solares PV de Mexico II, S.A. de C.V. 15,550 —  —  1,156 16,706
(Allowance for doubtful accounts) —  (16,706 ) —  —  (16,706 )

Joint ventures

Horus Solar, S.A. de C.V. 16,794 —  (3,600 ) 1,160 14,354
(Allowance for doubtful accounts) —  (14,343 ) —  —  (14,343 )

Joint ventures

Sunmex Renovables, S.A. de C.V. 23,859 —  —  1,773 25,632
(Allowance for doubtful accounts) —  (25,632 ) —  —  (25,632 )

Joint ventures

Kelar S.A. 18,320 —  —  1,919 20,239

Joint ventures

Daehan Wind Power PSC 14,778 —  (1,773 ) 966 13,971

Joint ventures

Bitsolar Energy Co., Ltd. 3,165 —  —  —  3,165

Joint ventures

Daesan Green Energy Co., Ltd. 3,302 —  —  —  3,302

Joint ventures

Yangyang Wind Power Co., Ltd. 3,257 —  —  —  3,257

Joint ventures

Nghi Son 2 Power LLC 144,927 —  (10,799 ) 9,913 144,041

Joint ventures

Guadalupe Solar SpA 3,073 —  (97 ) 325 3,301

Joint ventures

Foresight Iberian Solar Group Holding,

S.L.

72,211 2,729 —  1,941 76,881

Joint ventures

S-Power Chile SpA 287 —  —  21 308

Joint ventures

Omisan Wind Power Co., Ltd. 8,894 —  —  —  8,894

Joint ventures

Gurae Resident Power Co., Ltd. 106 —  —  —  106

Joint ventures

Yeongwol Eco Wind Co., Ltd. 2,178 —  —  —  2,178

Joint ventures

KAS Investment I LLC 7,333 6,163 —  878 14,374

Joint ventures

KAS Investment II LLC 7,391 6,213 —  885 14,489

Joint ventures

Chungsongmeon BongSan wind power Co., Ltd. 5,563 —  —  —  5,563

Joint ventures

KEPCO for Power Company —  58,077 —  2,350 60,427

Joint ventures

Luluah SKY Energy Holding Ltd. —  84,319 —  2,122 86,441
W  514,881 106,270 (37,447 ) 31,092 614,796

157


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(6)

Borrowings arising from the related party transactions as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won

Related parties

Type

Beginning
balance
Borrowings Repayment Others Ending
balance

Korea Development

Facility W 74,942 —  (3,459 ) 4,432 75,915

Bank

Others 1,097 —  (157 ) —  940
Operating funds 130,000 782,137 (812,137 ) —  100,000
EBL and others 99,690 5,174 (2,052 ) 4,751 107,563
W  305,729 787,311 (817,805 ) 9,183 284,418

158


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Electric Power Corporation Shuweihat Asia Operation & Maintenance Company Performance guarantees USD 11,000 Shuweihat Asia Power Investment B.V.
Korea Electric Power Corporation Rabigh Operation & Maintenance Company Limited Performance guarantees USD 1,387 Rabigh Electricity Company
Korea Electric Power Corporation Rabigh Electricity Company Performance guarantees SAR 4,151 Hana Bank
Korea Electric Power Corporation Nghi Son 2 Power LLC Certification of payment on L/C USD 44,350 SMBC Singapore and others
Korea Electric Power Corporation Barakah One Company Performance guarantees and others USD 3,691,065 First Abu Dhabi Bank and others
Korea Electric Power Corporation RE Holiday Holdings LLC Performance guarantees (*9) USD 203,981 EFS Renewables Holdings, LLC, CA-CIB and others
Korea Electric Power Corporation RE Pioneer Holdings LLC Performance guarantees USD 106,873 EFS Renewables Holdings, LLC
Korea Electric Power Corporation Shuweihat Asia Power Investment B.V. Certification of payment on L/C USD 9,800 Hana Bank
Korea Electric Power Corporation Amman Asia Electric Power Company Certification of payment on L/C USD 12,000 Hana Bank
Korea Electric Power Corporation Horus Solar S.A. De C.V. Other performance guarantees USD 1,331 CENACE
Korea Electric Power Corporation Other performance guarantees MXN 17,362 CFE Transmission and others
Korea Electric Power Corporation Recursos Solares PV de Mexico II S.A. de C.V. Other performance guarantees MXN 1,518 SEMARNAT
Korea Electric Power Corporation Sunmex Renovables S.A. de C.V. Other performance guarantees USD 9,078 CENACE
Korea Electric Power Corporation Other performance guarantees MXN 3,666 CFE Transmission and others
Korea Electric Power Corporation International Offshore Power Transmission Holding Company Limited Performance guarantees USD 52,500 Mizuho bank
Korea Electric Power Corporation Other performance guarantees USD 7,000 Credit Agricole
Korea Electric Power Corporation Pulau Indah Power Plant Sdn. Bhd. Other guarantees MYR 30,889 Mizuho Bank
Korea Electric Power Corporation KEPCO for Power Company Debt guarantees USD 108,000 Shinhan Bank

159


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Electric Power Corporation Other performance guarantees USD 70,000 SMBC Seoul
Korea Electric Power Corporation Remal Energy Company Debt guarantees (*16) USD 146,400 DBS BANK Ltd. (Hong Kong)
Korea Electric Power Corporation Naseem Energy Company Debt guarantees (*17) USD 146,400 DBS BANK Ltd. (Hong Kong)
Korea Electric Power Corporation Yona Intermediate Holdings LLC Debt guarantees (*19) USD 69,460 KEXIM, DBS Bank Ltd.
Korea Western Power Co., Ltd. Cheongna Energy Co., Ltd. Collateralized money invested KRW 28,202 Kookmin Bank and others
Korea Western Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea Western Power Co., Ltd. Dongducheon Dream Power Co., Ltd. Collateralized money invested (*5) KRW 53,233 Kookmin Bank and others
Korea Western Power Co., Ltd. Loan payment guarantee KRW 18,200 HY Seobu Jeilcha Co., Ltd.
Korea Western Power Co., Ltd. PT.Mutiara Jawa Collateralized money invested —  Woori Bank
Korea Western Power Co., Ltd. Rabigh Operation & Maintenance Company Limited Performance guarantees and others SAR 11,200 National Bank of Kuwait
Korea Western Power Co., Ltd. Xe-Pian Xe-Namnoy Power Co.,Ltd Collateralized money invested KRW 80,452 Krung Thai Bank
Korea Western Power Co., Ltd. Impounding bonus guarantees (*10) USD 5,000 SK Eco Plant Co., Ltd.
Korea Western Power Co., Ltd. Haeng Bok Do Si Photovoltaic Power Co., Ltd. Collateralized money invested KRW 194 Nonghyup Bank
Korea Western Power Co., Ltd. Shin Pyeongtaek Power Co., Ltd. Collateralized money invested KRW 72,000 Kookmin Bank and others
Korea Western Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea Western Power Co., Ltd. Haemodum Solar Co., Ltd. Collateralized money invested KRW 1,225 Nonghyup Bank
Korea Western Power Co., Ltd. Seoroseoro Sunny Power Plant Co., Ltd. Collateralized money invested KRW 706 Hana Bank and others
Korea Western Power Co., Ltd. Muan Solar Park Co., Ltd. Collateralized money invested KRW 4,400 IBK and others

160


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Western Power Co., Ltd. YuDang Solar Co., Ltd. Collateralized money invested KRW 360 Hana Bank and others
Korea Western Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea Western Power Co., Ltd. Anjwa Smart Farm & Solar City Co., Ltd. Collateralized money invested KRW 5,651 Hana Bank and others
Korea Western Power Co., Ltd. Hapcheon Floating Photovoltaic Power Plant Inc. Collateralized money invested KRW 7,512 Nonghyup Bank
Korea Western Power Co., Ltd. Gurae Resident Power Co., Ltd. Collateralized money invested KRW 386 Hana Bank and others
Korea Western Power Co., Ltd. Yeongwol Eco Wind Co., Ltd. Collateralized money invested KRW 3,089 Hana Bank and others
Korea Western Power Co., Ltd. Gunsan Land Solar Co., Ltd. Collateralized money invested KRW 19,091 Hana Bank and others
Korea Western Power Co., Ltd. Seobusambo highway photovoltaics Co., Ltd. Collateralized money invested KRW 3,020 Hana Bank and others
Korea Western Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea Western Power Co., Ltd. Eumseong Eco Park Co., Ltd. Collateralized money invested KRW 5,741 Kyobo Life Insurance Co., Ltd. and others
Korea Western Power Co., Ltd. PungBack Wind Farm Corporation Collateralized money invested KRW 7,885 Hanwha Life Insurance Co., Ltd. and others
Korea Western Power Co., Ltd. Wadi Noor Solar Power Loan payment guarantee USD 54,855 DBS Bank
Korea Western Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea Western Power Co., Ltd. EDFR KOWEPO Ajban PV Holding Limited Loan payment guarantee USD 57,090 First Abu Dhabi Bank
Korea Western Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea Western Power Co., Ltd. Taean Haetdeulwon Solar Co., Ltd. Collateralized money invested KRW 7,992 Kookmin Bank and others
Korea Western Power Co., Ltd. Hapcheon Floating Photovoltaic Power Plant 2nd Inc. Collateralized money invested KRW 1,811 Woori Bank and others
Korea Western Power Co., Ltd. Coastal Power SAOC Loan payment guarantee USD 73,150 DBS Bank

161


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea East-West Power Co., Ltd. Seokmun Energy Co., Ltd. Collateralized money invested KRW 13,959 Kookmin Bank and others
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea East-West Power Co., Ltd. Chun-cheon Energy Co., Ltd. Collateralized money invested KRW 36,669 Kookmin Bank and others
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea East-West Power Co., Ltd. Honam Wind Power Co., Ltd. Collateralized money invested KRW 4,632 Shinhan Bank and others
Korea East-West Power Co., Ltd. GS Donghae Electric Power Co., Ltd. Collateralized money invested KRW 296,081 Korea Development Bank and others
Korea East-West Power Co., Ltd. Yeonggwangbaeksu Wind Power Co., Ltd. Collateralized money invested KRW 3,698 Kookmin Bank and others
Korea East-West Power Co., Ltd. Daesan Green Energy Co., Ltd. Collateralized money invested KRW 23,125 IBK
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) —  IBK
Korea East-West Power Co., Ltd. Taebaek Gadeoksan Wind Power Co., Ltd. Collateralized money invested KRW 21,491 Samsung Fire & Marine Insurance Co., Ltd. and others
Korea East-West Power Co., Ltd. PT.Tanjung Power Indonesia Collateralized money invested KRW 105,495 MUFG Bank Ltd. and others
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) — 
Korea East-West Power Co., Ltd. South Jamaica Power Company Limited Performance guarantees (*13) USD 14,400 Credit Agricole Corporate and Investment Bank Seoul, Hana Bank
Korea East-West Power Co., Ltd. Collateralized money invested KRW 53,378 JCSD Trustee Services Ltd. and others
Korea East-West Power Co., Ltd. Cheongju Eco Park Co., Ltd. Collateralized money invested KRW 10,423 Kyobo Life Insurance Co., Ltd. and others
Korea East-West Power Co., Ltd. Busan Industrial Solar Co., Ltd. Collateralized money invested KRW 1,341 Shinhan Bank and others
Korea East-West Power Co., Ltd. Yangyang Wind Power Co., Ltd. Collateralized money invested KRW 15,896 Hana Bank and others

162


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea East-West Power Co., Ltd. Goheung New Energy Co., Ltd. Collateralized money invested KRW 5,547 Woori Bank and others
Korea East-West Power Co., Ltd. Yanggu Floating Photovoltaic Power Co., Ltd. Collateralized money invested KRW 940 Korea Development Bank
Korea East-West Power Co., Ltd. Hoenggye Renewable Energy Co., Ltd. Collateralized money invested KRW 2,375 IBK
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) — IBK
Korea East-West Power Co., Ltd. Kumyang Eco Park Co., Ltd. Collateralized money invested KRW 6,024 Woori Bank and others
Korea East-West Power Co., Ltd. Amaala Sustainable Company for Energy LLC Loan payment guarantee (*7) USD 38,054 First Abu Dhabi Bank PJSC
Korea East-West Power Co., Ltd. Collateralized money invested KRW 7,692
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea East-West Power Co., Ltd. KPE Green Energy Co., Ltd. Collateralized money invested KRW 10,677 Hana Bank and others
Korea East-West Power Co., Ltd. Yeonggwang Wind Power Co., Ltd. Collateralized money invested KRW 27,958 KDB Capital and others
Korea East-West Power Co., Ltd. Bitsolar Energy Co., Ltd. Collateralized money invested — Mirae Asset Life Insurance Co., Ltd. and others
Korea East-West Power Co., Ltd. Jeju Bukchon BES Power Co., Ltd. Collateralized money invested KRW 1,696 Woori Bank and others
Korea East-West Power Co., Ltd. Guarantees for supplemental funding (*1) — Woori Bank and others
Korea Southern Power Co., Ltd. Daeryun Power Co., Ltd. Collateralized money invested KRW 36,803 Korea Development Bank and others
Korea Southern Power Co., Ltd. Daegu Green Power Co., Ltd. Collateralized money invested KRW 32,962 Shinhan Bank and others
Korea Southern Power Co., Ltd. Performance guarantees —
Korea Southern Power Co., Ltd. Kelar S.A. Performance guarantees USD 26,520 Hana Bank and MUFG
Korea Southern Power Co., Ltd. Payment guarantees (*11) USD 11,707 Hana Bank
Korea Southern Power Co., Ltd. Daehan Wind Power PSC Payment guarantees (*6) USD 2,000 Hana Bank
Korea Southern Power Co., Ltd. Performance guarantees (*14) USD 1,800 Shinhan Bank
Korea Southern Power Co., Ltd. Collateralized money invested KRW 28,620 Standard Chartered Bank
Korea Southern Power Co., Ltd. Pyeongchang Wind Power Co., Ltd. Collateralized money invested KRW 12,245 Woori Bank, Shinhan Bank and others
Korea Southern Power Co., Ltd. Performance guarantees —
Korea Southern Power Co., Ltd. Taebaek Guinemi Wind Power Co., Ltd. Collateralized money invested KRW 15,202 IBK
Korea Southern Power Co., Ltd. Samcheok Eco Materials Co., Ltd. Payment guarantees (*2) — KIS SF Jeisipicha Co., Ltd.
Korea Southern Power Co., Ltd. Performance guarantees — HC Base Materials Co., Ltd.
Korea Southern Power Co., Ltd. Solaseado Solar Power Co., Ltd. Collateralized money invested KRW 15,153 Kookmin Bank and others
Korea Southern Power Co., Ltd. Naepo Green Energy Co., Ltd. Collateralized money invested KRW 70,984 IBK and others

163


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Southern Power Co., Ltd. Omisan Wind Power Co., Ltd. Collateralized money invested KRW 12,752 Shinhan Bank and others
Korea Southern Power Co., Ltd. Performance guarantees and guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Geumsungsan Wind Power Co., Ltd. Collateralized money invested KRW 8,639 Kookmin Bank and others
Korea Southern Power Co., Ltd. HORANG ENERGY Inc. Collateralized money invested KRW 3,911 Woori Bank and others
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Haman Green Energy Co., Ltd. Collateralized money invested KRW 6,729 Hana Bank and others
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Jeongeup Green Power Co., Ltd. Collateralized money invested KRW 6,369 Mirae Asset Securities Co., Ltd.
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. HyChangwon Fuel Cell. Co., Ltd. Collateralized money invested KRW 8,722 Woori Bank and others
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Roof One Energy Co., Ltd. Collateralized money invested KRW 2,332 Woori Bank
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Namjeju Bitdream Energy Co., Ltd. Collateralized money invested KRW 4,819 Woori Bank and others
Korea Southern Power Co., Ltd. Cheonwang Green Energy Co., Ltd. Collateralized money invested KRW 492 Samsung Fire & Marine Insurance Co., Ltd. and others
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Haetbyeotgil Sunlight Co., Ltd. Collateralized money invested KRW 730 Kyobo Life Insurance Co., Ltd. and Heungkuk Asset Management Co., Ltd.
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Rutile BESS. LLC Payment guarantees USD 17,700 Nonghyup Bank and JPMorgan Chase Bank
Korea Southern Power Co., Ltd. Luluah SKY Energy Holding Ltd Collateralized money invested — Export-Import Bank of Korea and others
Korea Southern Power Co., Ltd. Goheung Naro Energy Storage Co., Ltd. Collateralized equity invested KRW 8,460 Kyobo Life Insurance Co., Ltd. and others
Korea Southern Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Southern Power Co., Ltd. Balgeun Jindo Energy Storage Co., Ltd. Collateralized equity invested KRW 8,040 IBK Asset Management Co., Ltd.
KOSPO Chile SpA Kelar S.A. Collateralized money invested KRW 174,582 Export-Import Bank of Korea and others
KOSPO Chile SpA Chester Solar I SpA Collateralized money invested KRW 3,052 IBK
KOSPO Chile SpA Chester Solar IV SpA Collateralized money invested KRW 6,825 IBK
KOSPO Chile SpA Chester Solar V SpA Collateralized money invested KRW 630 IBK
KOSPO Chile SpA Diego de Almagro Solar SpA Collateralized money invested KRW 4,727 IBK
KOSPO Chile SpA Laurel SpA Collateralized money invested KRW 2,466 IBK

164


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Midland Power Co., Ltd. YeongGwang Yaksu Wind Electric Co., Ltd. Collateralized money invested KRW 31 IBK and others
Korea Midland Power Co., Ltd. Hyundai Green Power Co., Ltd. Collateralized money invested KRW 83,816 Korea Development Bank and others
Korea Midland Power Co., Ltd. PT Cirebon Electric Power Debt guarantees USD 3,795 Mizuho Bank
Korea Midland Power Co., Ltd. PT Wampu Electric Power Debt guarantees USD 4,253 PT. Bank KB Bukopin
Korea Midland Power Co., Ltd. Green Energy Power Co., Ltd. Collateralized money invested KRW 251 IBK
Korea Midland Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Midland Power Co., Ltd. Yaksu ESS Co., Ltd. Collateralized money invested KRW 57 IBK
Korea Midland Power Co., Ltd. Gwangbaek Solar Power Investment Co., Ltd. Collateralized money invested KRW 5,657 Kyobo Life Insurance Co., Ltd. and others
Korea Midland Power Co., Ltd. Muan Haetbit Power Plant Co., Ltd. Collateralized money invested KRW 2,745 IBK
Korea Midland Power Co., Ltd. Goesan Solar park Co., Ltd. Collateralized money invested KRW 2,874 IBK
Korea Midland Power Co., Ltd. Bitgoel Eco Energy Co., Ltd. Collateralized money invested KRW 8,045 IBK and others

165


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Midland Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Midland Power Co., Ltd. Energyco Co., Ltd. Collateralized money invested KRW 2,622 Nonghyup Bank
Korea Midland Power Co., Ltd. Jeju Gimnyeong Wind Power Co., Ltd. Collateralized money invested KRW 7 Nonghyup Bank
Korea Midland Power Co., Ltd. Dongbu Highway Solar Co., Ltd. Collateralized money invested KRW 603 Shinhan Bank
Korea Midland Power Co., Ltd. Seobu Highway Solar Co., Ltd. Collateralized money invested KRW 745 Shinhan Bank
Korea Midland Power Co., Ltd. Yeongyang Wind Power Corporation II Collateralized money invested KRW 11,931 Korea Development Bank and others
Korea Midland Power Co., Ltd. Haeparang Energy Co., Ltd. Collateralized money invested KRW 2,346 Templeton Hana Asset Management Co., Ltd.
Korea Midland Power Co., Ltd. Guarantees for supplemental funding (*1) —
Korea Midland Power Co., Ltd. Saemangeum Sebit Power Plant Co., Ltd. Collateralized money invested KRW 28,857 IBK and others
Korea Midland Power Co., Ltd. Yeomsubong Wind Power Co., Ltd. Collateralized money invested KRW 430 Korea Development Bank
Korea Midland Power Co., Ltd. Guarantees for supplemental funding (*1) — Korea Development Bank
Korea Midland Power Co., Ltd. Commerce and Industry Energy Co., Ltd. Collateralized money invested KRW 498 IBK and others

166


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea Midland Power Co., Ltd. Nour Ibri Solar Power SAOC Performance guarantees OMR 2,750 Oman Power and Water Procurement Company SAOC
Korea Midland Power Co., Ltd. Loan payment guarantee USD 17,300 Shinhan Bank
Korea Midland Power Co., Ltd. Debt guarantees USD 600
Korea Midland Power Co., Ltd. Shinan-Ui Offshore Wind Power Co., Ltd. Collateralized money invested KRW 92,678 Korea Development Bank and others
Korea Midland Power Co., Ltd. Gubbaberget Vindkraft AB Performance guarantees EUR 7,031 Microsoft Ireland Operations Limited
Korea Midland Power Co., Ltd. Concho County Solar 1, LLC Performance guarantees USD 15,038 Deutsche Bank Trust Company Americas and others
Korea South-East Power Co., Ltd. Boim Cogeneration Co., Ltd. Collateralized money invested (*3,4) — IBK
Korea South-East Power Co., Ltd. Guarantees for supplemental funding and others (*1,15) KRW 76,800 NH Investment & Securities Co., Ltd. and others
Korea South-East Power Co., Ltd. RES Technology AD Collateralized money invested (*4) EUR 7,210 UniCredit Bulbank and others
Korea South-East Power Co., Ltd. ASM-BG investicii AD Collateralized money invested (*4) EUR 5,735 UniCredit Bulbank and others
Korea South-East Power Co., Ltd. Goseong Green Power Co., Ltd. Collateralized money invested (*4) KRW 266,317 Kyobo Life Insurance Co., Ltd. and others
Korea South-East Power Co., Ltd. Gangneung Eco Power Co., Ltd. Collateralized money invested (*4) KRW 228,099 Kyobo Life Insurance Co., Ltd. and others

167


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

In millions of won and thousands of foreign currencies

Primary guarantor

Principal obligor

Type of guarantees

Credit limit

Creditor

Korea South-East Power Co., Ltd. PND Solar Co., Ltd. Collateralized money invested (*4) KRW 1,711 IBK
Korea South-East Power Co., Ltd. Hyundai Eco Energy Co., Ltd. Collateralized money invested (*4) KRW 9,114 Samsung Life Insurance Co., Ltd. and others
Korea South-East Power Co., Ltd. Jaeun Jumin Baram Power Plant Co., Ltd. Collateralized money invested (*4) KRW 45 IBK
Korea South-East Power Co., Ltd. Chungsongmeon BongSan wind power Co., Ltd. Collateralized money invested (*4) —  Kyobo Life Insurance Co., Ltd. and others
Korea South-East Power Co., Ltd. Yeongam Solar Power Co., Ltd. Collateralized money invested (*4) KRW 12,224 Kookmin Bank and others
Korea South-East Power Co., Ltd. Samsu Wind Power Co., Ltd. Collateralized money invested (*4) KRW 3,507 Shinhan Bank and others
Korea South-East Power Co., Ltd. Saemangeum Heemang Photovoltaic Co., Ltd. Collateralized money invested (*4) KRW 17,001 Woori Bank and others
Korea South-East Power Co., Ltd. Nepal Water & Energy Development Company Pty.,Ltd. Collateralized money invested (*4) USD 95,960 International Finance Corporation and others
Korea South-East Power Co., Ltd. Business reserve payment guarantee USD 33,333
Korea South-East Power Co., Ltd. Santiago Solar Power SpA Debt guarantees (*8) USD 8,000 Nonghyup Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Noeul Green Energy Co., Ltd. Collateralized money invested —  Hana Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Busan Green Energy Co., Ltd. Collateralized money invested KRW 1,392 Shinhan Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Godeok Clean Energy Co., Ltd. Collateralized money invested KRW 5,578 Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Guarantees for supplemental funding (*18) — 
Korea Hydro & Nuclear Power Co., Ltd. Cheong-Song Noraesan Wind Power Co., Ltd. Collateralized money invested KRW 3,742 Woori Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Gwangyang Green Energy Co., Ltd. Collateralized money invested KRW 23,526 Shinhan Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Gangneung Sacheon Fuel Cell Co., Ltd. Collateralized money invested KRW 8,994 Hana Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Chuncheon Green Energy Co., Ltd. Collateralized money invested KRW 14,917 Hana Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Yangyang Suri Wind Power Co., Ltd. Collateralized money invested KRW 9,396 Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Bigeum Jumin Photovoltaic Power Co., Ltd. Collateralized money invested KRW 7,106 Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd. Songsan Green Energy Co., Ltd. Collateralized money invested KRW 11,865 Hana Bank
Korea Hydro & Nuclear Power Co., Ltd. Changwon Nu-ri Energy Co., Ltd. Collateralized money invested KRW 9,652 Hana Bank
Korea Hydro & Nuclear Power Co., Ltd. Imha Floating Photovoltaic Power Co., Ltd. Collateralized money invested KRW 7,501 Hana Bank
KHNP USA LLC KAS INVESTMENT I LLC Payment guarantees (*12) USD 9,770 WOORI AMERICA BANK
KHNP USA LLC KAS INVESTMENT II LLC Payment guarantees (*12) USD 9,730 WOORI AMERICA BANK
(*1)

The Group guarantees to provide supplemental funding for business with respect to excessive business expenses or insufficient repayment of borrowings.

(*2)

Samcheok Eco Materials Co., Ltd., a joint venture of the Group has issued the hybrid bonds. If the bonds are not repaid by December 8, 2026, the parent company and shareholders except the parent company must purchase the bonds from the acquirer. As of June 30, 2026, derivative liabilities of W23,494 million were recognized in relation to this obligation. Meanwhile, the Group has entered into an agreement to compensate for potential losses in connection with the fulfillment of the obligated supply volume under the coal ash supply obligation agreement.

(*3)

The Group recognized an impairment loss on all of the equity securities of Boim Combined Heat and Power Generation Co., Ltd. before the prior year, and the acquisition cost of the securities provided as collateral is W47,067 million.

(*4)

The agreement includes an obligation to contribute, in proportion to the equity interest, any excess amount over the threshold in the event that the non-recognized portion of the guaranteed company’s capital expenditure exceeds the prescribed limit.

(*5)

The common stocks of Dongducheon Dream Power Co., Ltd. held by the Group were pledged as collateral.

(*6)

The Group provided a payment guarantee to Jordan Tafila wind power project for opening L/C for Debt Service Reserve Account (DSRA).

168


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(7)

Guarantees provided to the related parties as of June 30, 2026 are as follows, continued:

(*7)

The Group provided EBL payment and EBL hedging guarantee to Amaala Sustainable Company for Energy LLC, an associate of the Group.

(*8)

The Group has issued a guaranteed letter of credit in the amount of USD 8,000 thousand under the interlender loan agreement with Santiago Solar Power SpA.

(*9)

The credit limits of guarantees to RE Holiday Holdings LLC include the credit limits of guarantees to their subsidiaries.

(*10)

Xe-Pian Xe-Namnoy Power Co., Ltd., an associate of the Group, has entered a contract to pay an incentive-type impounding bonus to SK Eco Plant Co., Ltd. when the Xe-Pian Xe-Namnoy Dam is completed. If Xe-Pian Xe-Namnoy Power Co., Ltd. fails to pay SK Eco Plant Co., Ltd., the Group guarantees the payment, and the amount is USD 5,000 thousand.

(*11)

The Group provided a payment guarantee to the Chile Kelar project for opening L/C for Debt Service Reserve Account (DSRA), and others.

(*12)

The credit limits of guarantees to KAS INVESTMENT I LLC, KAS INVESTMENT II LLC include the credit limits of guarantees to their subsidiaries.

(*13)

The payment guarantee is related to the gas combined cycle power project of South Jamaica Power Company Limited, a joint venture of the Group.

(*14)

The Group has provided a performance guarantee in connection with the Tafila Wind Power Project in Jordan.

(*15)

In accordance with the agreement, as an outflow of cash is probable and the amount required for the fulfillment of the obligation can be reliably estimated, the Group has recognized the estimated amount as other provisions, amounting to W12,093 million.

(*16)

This represents guarantees provided to Remal Energy Company, a subsidiary of Remal First Holding Company, an associate of the Group, in connection with the gas combined cycle power project.

(*17)

This represents guarantees provided to Naseem Energy Company, a subsidiary of Naseem First Holding Company, an associate of the Group, in connection with the gas combined cycle power project.

(*18)

The payment guarantee is a supplemental funding agreement for excessive construction costs and others of Chuncheon Green Energy Co., Ltd. The Group is obligated to pay, in proportion to its equity interest, for the excessive business expenses of the guaranteed company incurred before the completion date, and the debt guarantee is released after the date of overall completion.

(*19)

This represents guarantees provided to Yona Intermediate Holdings LLC, a joint venture of KEPCO Yona America LLC, a subsidiary of the Group, in connection with the solar power generation business.

169


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(8)

Guarantees received from the related parties as of June 30, 2026 are as follows:

In millions of won

Primary Guarantor

Type of
guarantees

Credit limit

KAPES, Inc.

Defect guarantees W 16,106
Performance guarantees 38,231
Advance payment guarantee 241,826
(9)

Derivatives transactions with the related parties as of June 30, 2026 are as follows:

(i) Currency Swap

In millions of won and thousands of foreign currencies except contract exchange rate information
Contract
amounts
Contract interest rate
per annum
Contract
exchange
rate

Counterparty

Contract year Pay Receive Pay Receive (in won)

Korea Development Bank

2021~2026 W 118,170 USD 100,000 1.11 % 1.13 % W 1,181.70
2022~2028 283,820 USD 200,000 5.12 % 5.50 % 1,419.10
2023~2026 256,000 USD 200,000 4.04 % 5.38 % 1,280.00
2024~2027 864,890 USD 650,000 3.53 % 4.88 % 1,330.60
2025~2028 73,160 USD 50,000 3.02 %

Compounded
Daily SOFR
+ 0.62


%
1,463.20
2017~2027 111,610 USD 100,000 2.31 % 3.13 % 1,116.10
2018~2028 108,600 HKD 800,000 2.69 % 3.35 % 135.75
2019~2027 119,978 CHF 100,000 1.43 % 0.05 % 1,199.78
2022~2027 262,000 USD 200,000 3.63 % 4.25 % 1,310.00
2024~2028 257,880 USD 200,000 3.80 % 5.00 % 1,289.40
2024~2028 128,940 USD 100,000 3.69 % 5.00 % 1,289.40
2024~2029 138,540 USD 100,000 3.19 % 4.63 % 1,385.40
2025~2030 556,560 USD 400,000 2.75 % SOFR + 0.79 % 1,391.40
2026~2031 302,000 USD 200,000 4.09 % 4.50 % 1,510.00
2021~2026 114,230 USD 100,000 1.27 % 1.25 % 1,142.30
2022~2027 123,710 USD 100,000 3.41 % 3.63 % 1,237.10
2023~2028 129,500 USD 100,000 3.85 % 4.88 % 1,295.00

(ii) Currency forward

In millions of Won and thousands of foreign currencies except contract exchange rate information
Contract amounts Contract
exchange
rate

Counterparty

Contract date Maturity date Pay Receive (in Won)

Korea Development Bank

2026.06.16 2026.07.07 W 13,615 USD 9,000 W 1,512.78
2026.06.29 2026.07.23 10,791 USD 7,000 1,541.62

170


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

46.

Related Parties, Continued

(10)

The Group acquired financial instruments of W120,000 million from Korea Development Bank, an other related party, and disposed of W80,000 million of them during the year ended December 31, 2025.

(11)

The Group considers all standing directors of the Board who serve as executive officers responsible for planning, operations and/or control of business activities, as key management personnel. The Group recorded salaries and other compensations related to the key management personnel as follows:

In millions of Won June 30, 2026 June 30, 2025

Type

Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Salaries

W 715 932 722 954

Employee benefits

13 30 15 32
W 728 962 737 986

171


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

47.

Statement of Cash Flows

(1)

Significant non-cash transactions for each of the six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of won

Transactions

For the six-month
period ended
June 30, 2026
For the six-month
period ended

June 30, 2025

Transfer from construction-in-progress to other assets

W 6,637,806 3,455,156

Recognition of asset retirement cost and related provision for decommissioning costs

421,072 252,052

Transfer from provision for disposal of used nuclear fuel to accrued expenses

265,905 207,685

Transfer from long-term borrowings to current portion of long-term borrowings

1,456,634 868,639

Transfer from debt securities to current portion of debt securities

15,371,779 12,379,107

Transfer from inventory to stored nuclear fuel

814,931 627,304

Recognition of right-of-use assets and others

72,587 43,906
(2)

Changes in liabilities incurred from financing activities for each of the six-month periods ended June 30, 2026 and 2025 are as follows:

In millions of won For the six-month period ended June 30, 2026
Non-cash changes
Beginning
balance
Cash flows Increase Effect of exchange rate
fluctuations and others
Ending
balance

Borrowings

W 21,996,296 2,540,963 —  42,230 24,579,489

Debt securities

107,772,996 (263,005 ) —  1,227,463 108,737,454

Lease liabilities

3,150,880 (287,247 ) 67,712 203,370 3,134,715

Dividends Payable

1,319 (1,052,853 ) —  1,051,768 234

Derivative liabilities (assets), net

(1,870,050 ) 583,316 —  (1,376,346 ) (2,663,080 )
W 131,051,441 1,521,174 67,712 1,148,485 133,788,812
In millions of won For the six-month period ended June 30, 2025
Non-cash changes
Beginning
balance
Cash flows Increase Effect of exchange rate
fluctuations and others
Ending
balance

Borrowings

W 20,659,381 4,047,550 —  (168,518 ) 24,538,413

Debt securities

111,874,019 (3,315,584 ) —  (1,235,255 ) 107,323,180

Lease liabilities

3,699,456 (329,894 ) 37,195 (157,398 ) 3,249,359

Dividends Payable

5,063 (211,453 ) —  213,174 6,784

Derivative liabilities (assets), net

(2,406,338 ) 539,303 —  1,131,167 (735,868 )
W 133,831,581 729,922 37,195 (216,830 ) 134,381,868

172


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

48.

Commitments for Expenditure

(1)

The commitments for acquisition of property, plant and equipment as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025

Contracts

Commitment
amounts
Remaining
liability balances
Commitment
amounts
Remaining
liability balances

Purchase of cable (PVC, 1C, 2000SQ) 153,000M and others (Shin-Bupyung-Youngseo)

W 57,235 425 57,226 417

Purchase of GIS (362kV, 6300A, 63kA) 23CB – Youngseo S/S

36,970 —  37,081 8,394

Purchase of GIS (362kV, 6300A, 63kA) 27CB – Gwangyang S/S

37,744 140 37,744 140

Purchase of cable (PVC, 1C, 2500SQ) 100,548M and others (Kyungin Construction)

58,271 746 58,271 746

Purchase of GIS (362kV, 6300A, 63kA) 25CB – Migeum S/S

35,282 224 35,282 4,749

Purchase of cable (PVC, 1C, 2000SQ) 5,862M and others (Baekun-Gwangyanghang)

35,016 703 35,016 703

Purchase of cable (PVC, 1C, 2500SQ) 57,868M and others (Goduk-Seoansung)

40,937 654 40,937 654

Purchase of cable (PE, 1C, 2000SQ) 87,732M and others (Eulwangboonki)

36,446 1,015 36,446 1,015

Purchase of GIS (362kV,6300A,63kA) Type 18 – Wolsung S/Y

33,057 16,045 33,057 16,045

System stabilization ESS equipment (Bubuk S/S) Type 1

221,939 42,137 221,939 42,137

System stabilization ESS equipment (Yeongcheon S/S) Type 1

72,779 16,975 72,779 16,975

System stabilization ESS equipment (Yesan S/S) Type 1

56,174 11,471 56,174 11,471

System stabilization ESS equipment (Hamyang S/S) Type 1

35,764 11,468 35,764 11,468

Purchase of GIS (362kV, 6300A, 63kA) Type 31 – East Seoul S/S

39,345 39,275 38,520 38,520

Purchase of cable (PVC, 1C, 2000SQ) 68,613M and others (Dongducheon-Yangju)

41,249 —  40,933 15,651

Purchase of HVDC cable (PE, 2500SQ) 31,551M and others

39,664 10,644 40,323 31,810

Purchase of HVDC cable (PE, 2500SQ) 30,883M and others

40,059 10,564 40,130 31,505

Stationary reactive power compensation device (Phase 3, ±500MVAR) – Shin Jecheon S/S

39,300 39,300 39,300 39,300

Stationary reactive power compensation device (STATCOM, phase 3, ±500MVAR) – East coast #1C/S

37,756 37,756 37,600 37,600

Stationary reactive power compensation device (STATCOM/Phase 3, ±500MVAR) – Shin Gapyeong S/S

40,590 40,590 40,590 40,590

Stationary reactive power compensation device (STATCOM/Phase 3, ±500MVAR) – Shin Namwon S/S

37,100 37,100 37,100 37,100

Steel Pipe Towers (500kV HVDC), 6,105 tons – Donghae–Shingapyeong (Section 2)

32,381 2,261 32,381 11,453

Steel pipe towers (500KV HVDC) 6,143 tons – East Coast-Singapyeong (Section 3)

33,078 12 31,184 14,490

Purchase of GIS (362kV, 6300A, 63kA) Type 16 and others -East coast #1C/S

42,535 —  41,000 40,700

Purchase of cable (PVC, 1C, 2500SQ) 55,593M and others (Shin Anseong–Dong Yongin)

—  —  38,086 10,334

Concrete pole (10M, general purpose, 500KGF) 70,000 ea and five other equipment

—  —  31,838 18,411

AMIGO, 1P2W, 60(5)A, Electronic, Class 1.0, 220V, 709,616 units – Annual Unit Price (General)

54,544 6,022 40,475 29,546

AMIGO, 3P4W, 120(10)A, Electronic, Class 1.0, 220V, 422,751 units – Annual Unit Price (General)

47,476 2,133 42,252 12,262

Purchase of cable (PVC, 1C, 2000SQ) 74,647M and others (East Seoul#2-Tancheon)

31,352 31,352 30,471 30,471

154KV power cable (PE,1C,2500SQ) and 1 other type, 69,720M and accessories (Saemangeum-Dongbieung)

31,514 11,423 30,607 20,679

Static VAR compensator (3-phase, ±500MVAR), 1 unit – East Coast #2 converter station

36,400 36,400 36,400 36,400

GIS (800KV,8000A,50KA), 7 units – Dangjin Thermal Power Plant

65,264 65,264 63,903 63,903

765kV power transformers, 3 banks (15 tanks) – Dangjin Thermal Power Plant

62,332 61,100 61,100 61,100

345KV power cable (PVC,1C,2000SQ) 61,641M and accessories (Singangseo branch)

52,204 52,204 52,204 52,204

Static VAR compensator (STATCOM, 3-phase, ±500MVAR), 2 units – Sinokcheon S/S

61,844 61,844 58,650 58,650

Static VAR compensator (STATCOM, 3-phase, ±500MVAR), 1 unit – Sinjeongeup S/S

31,212 31,212 29,600 29,600

173


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

48.

Commitments for Expenditure, Continued

(1)

The commitments for acquisition of property, plant and equipment as of June 30, 2026 and December 31, 2025 are as follows, continued:

In millions of won As of June 30, 2026 As of December 31, 2025

Contracts

Commitment
amounts
Remaining
liability balances
Commitment
amounts
Remaining
liability balances

Insulated vinyl sheathed cable (600V,CV,1C,240SQ) 964,800M (annual unit price)

W 36,981 23,051 —  — 

GIS (362KV 6300A/550KV 2000A,63KA), 22 units – East Coast #2 C/S

31,800 31,800 —  — 

AMIGO, 1P2W, 60(5)A, electronic type, class 1.0, 220V 1,250,725EA – annual unit price (general)

34,695 34,695 —  — 

[Re-announcement of remaining quantity] AMIGO, 1P2W, 60(5)A, electronic type, class 1.0, 220V 1,250,725EA – annual unit price (general) / remaining quantity: 750,435EA

34,695 34,695 —  — 

Power cable (PVC,1C,2000SQ) 60,438M and accessories (154kV Sani branch)

39,405 39,405 —  — 

154kV power cable (PE,1C,2000SQ) and 1 other type, 113,712M and accessories (Gook-Deukryang underground TL)

72,480 72,480 —  — 

HVDC XLPE power cable (HFFR,2500SQ) 86,209M and accessories [Section 2]

133,025 133,025 —  — 

HVDC (70kV, XLPE, HFFR 2,500SQ) 86,158M and accessories [Section 3]

82,000 82,000 —  — 

HVDC XLPE power cable (HFFR,2500SQ) 86,158M and accessories [Section 1]

132,538 132,538 —  — 

GIS (362KV,6300A,63KA), 27 units and 1 other type – Sinhanam S/S (new)

34,200 34,200 —  — 

Construction of Saeul Units (#3,4)

11,718,217 122,001 11,718,217 921,006

Construction of Shin-Hanul Units (#3,4)

12,343,245 9,630,709 12,343,245 10,205,627

Other 64 contracts

2,294,689 1,380,127 2,245,116 1,583,953

Purchase of equipment for the construction project of Boryeong indoor coal storage yard

332,681 77,363 371,978 134,735

Purchase of main machine for Boryeong New Complex Unit 1

283,779 25,796 282,623 29,970

Boryeong New Complex Unit 1 Construction Project

238,130 64,831 221,475 93,617

Haman Combined Power Block Conditional Purchase Agreement

579,475 473,963 586,983 514,447

Purchase of gas turbine and turbine equipment of Gimpo combined heat & power plant

123,989 9,820 123,989 9,820

Construction of Gimpo combined heat & power plant

—  —  223,697 7,184

Purchase of gas turbines, steam turbines, and accessories for Gumi natural gas power plant

198,883 710 198,029 18,973

Purchase of heat recovery boiler and accessories for Gumi natural gas power plant

65,961 195 65,918 9,336

Construction of Gumi natural gas power plant

329,321 9,654 301,684 24,569

Construction of Gongju natural gas power plant

236,015 77,362 224,392 120,972

Purchase of natural gas main machine and accessories at Gongju natural gas power plant

308,337 33,576 310,322 257,822

Purchase of main equipment and ancillary facilities for the Yeosu Natural Gas Power Plant.

288,250 232,221 288,250 232,221

Purchase of gas turbine and auxiliary facilities for Asan cogeneration power plant

123,000 99,625 123,000 123,000

Construction of Yeosu natural gas power plant

231,659 231,659 —  — 

Purchase of coal handling machine for construction of Samcheok Units (#1,2)

327,569 1,170 327,569 2,110

Purchase of main equipment for Shin-Sejong combined thermal power plant

234,392 531 234,392 2,862

Purchase for remaining works of indoor coal storage at Hadong Thermal Power Plant

62,335 30,425 61,859 49,504

Purchase of Samcheok hydrogen compound co-firing facility infrastructure

130,340 42,113 128,820 64,989

Construction of Andong Combined Unit 2 Power Plant

189,470 95,363 185,647 132,297

Purchase of main equipment for Andong Combined Unit 2

279,771 21,106 279,771 125,852

Service of designing Hadong Combined Unit 1

30,179 24,151 32,289 26,988

Purchase of gas turbine for Goyang Changneung

120,945 95,601 —  — 

Purchase of gas turbine for Hadong

241,890 191,149 —  — 

174


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

48.

Commitments for Expenditure, Continued

(2)

As of June 30, 2026, details of contracts for inventory purchase commitment are as follows:

Type

Periods Contracted quantity

Concentrate

2026 ~ 2036 24,578 Ton U3O8

Conversion

2026 ~ 2034 20,703 Ton U

Enrichment

2026 ~ 2040 29,880 Ton SWU

In addition, the contracted quantity of the molded uranium between Korea Hydro & Nuclear Power Co., Ltd. and KEPCO Nuclear Fuel Co., Ltd., which are subsidiaries of the Group, is 1,370 Ton U (contract periods: 2024 ~ 2033).

175


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

49.

Contingencies and Commitments

(1)

Ongoing litigations and arbitrations related with contingent liabilities and contingent assets as of June 30, 2026 and December 31, 2025 are as follows:

In millions of won As of June 30, 2026 As of December 31, 2025
Number of cases Amount Number of cases Amount

As the defendant

716 W 841,815 706 W 799,646

As the plaintiff

267 521,975 244 531,459

The above information has been prepared including the subsidiaries of each entity. As of June 30, 2026, there are 7 ongoing litigations and 1 arbitration case in which the Group is the plaintiff or the defendant.

1)

The Group is the defendant against a number of litigations. The following is ongoing litigation pertaining to the Group which can potentially be significant:

There are multiple ongoing litigations against the Group related to ordinary wages, requesting payment of unpaid wages, with an aggregate claim amount of W196,569 million as of June 30, 2026. While the ultimate outcomes of these lawsuits cannot be predicted, management believes that their outcome would not have a material impact on the Group’s operations or financial position.

2)

There are 8 arbitration cases pertaining to the Group as of June 30, 2026 and the significant arbitration cases are as follows:

i)

During the year ended December 31, 2025, Hyosung Heavy Industries Co., Ltd. filed an arbitration claim with the Korean Commercial Arbitration Board against the Group in connection with the technology development agreement for the 200MW voltage-sourced HVDC facilities and the related acquisition price. The Group cannot reasonably estimate the amount and timing of resource outflows resulting from the arbitration.

ii)

The Group is in the process of an adjudication by the Electricity Commission of the Ministry of Climate, Energy and Environment regarding the application for adjudication seeking confirmation of the obligation to pay the installation costs of STATCOM (static synchronous compensator) for Saeul Units 3 and 4 (formerly Shin-Kori Units 5 and 6) and Hanbit Units 1 and 2. As of June 30, 2026, the Group cannot reasonably estimate the possibility of an outflow of economic benefits resulting from the adjudication.

176


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

49.

Contingencies and Commitments, Continued

(2)

Guarantees of payments and commitments provided to other companies as of June 30, 2026 are as follows:

1)

The Group, together with the other shareholders, has provided collateral to the syndicate of lenders of PT Indo Raya Tenaga, the project company of PT Barito Wahana Tenaga, by establishing a revolving pledge on the shares of PT Barito Wahana Tenaga for the project financing of PT Barito Wahana Tenaga as of June 30, 2026.

2)

The Group has entered into a borrowing agreement with a limit of USD 264,800 thousand with a syndicate of lenders including International Finance Corporation. Regarding the borrowing contract, the Group has guaranteed capital contribution of USD 69,808 thousand and additional contribution up to USD 19,000 thousand for contingencies, if any. In relation to this financial agreement, the Group is providing its entire shares in Mira Power Limited and business-related PP&E as collateral to the lenders.

3)

The Group has provided USD 6,015 thousand for a debt guarantee to Export-Import Bank of Korea, BNP Paribas and ING Bank, to guarantee the payment of debt related to hydroelectric power business of Tanggamus, Indonesia.

4)

The Group has provided USD 4,253 thousand for a debt guarantee to PT. Bank KB Bukopin, to guarantee the payment of debt related to hydroelectric power business of Wampu, Indonesia.

5)

The Group has provided RBC Community Investments Impact Renewables HoldCo-1, LLC a performance guarantee up to USD 3,000 thousand regarding weatherization in relation with tax investors for the Concho Valley solar power project in the United States.

6)

The Group has provided Microsoft Ireland Operations Limited a performance guarantee of EUR 7,031 thousand to guarantee the implementation of the power plant construction during the construction period for the Guba Buget wind power project in Sweden.

7)

The Group has provided Axia Power Holdings B.V. and others a performance guarantee up to USD 54,000 thousand for the implementation of Cirebon thermal power generation project in Indonesia.

8)

The Group has provided Mizuho Bank, Ltd. a debt guarantee of USD 3,795 thousand to guarantee the Debt Service Reserve Account (DSRA) related to the Cirebon power generation business of PT. Cirebon Electric Power in Indonesia.

9)

The Group has provided PT Perusahaan Listrik Negara a performance guarantee up to IDR 35,599,935 thousand for the implementation of Tanjung Jati power plant operation project in Indonesia.

10)

The Group has provided USD 30,000 thousand for a performance guarantee to Morgan Stanley Capital Group Inc., to guarantee the electricity purchase contract in relation to photovoltaic power generation project in USA.

11)

The Group has provided Morgan Stanley Renewables Inc. a guarantee up to USD 70,000 thousand for the fulfillment of subscription obligation regarding photovoltaic power generation project in USA.

12)

The Group has provided Hana Bank a debt guarantee up to USD 40,000 thousand to guarantee Equity Bridge Loan for Concho Valley solar business in the United States.

13)

The Group has provided Van Phong Power Company, Ltd. a performance guarantee up to USD 5,000 thousand for the operation maintenance project in Van Phong, Vietnam.

14)

The Group has provided RBC Community Investments Impact Renewables HoldCo-1, LLC a guarantee for up to USD 62,800 thousand for the fulfillment of subscription obligation regarding Concho Valley solar power project in the United States.

15)

The Group has provided a performance guarantee of USD 4,413 thousand to Mondelez Global, LLC, as a guarantee for the U.S. Lucy solar power project undertaken by Concho County Solar 1, LLC.

16)

The Group has provided a performance guarantee of USD 10,625 thousand to Deutsche Bank Trust Company Americas for the U.S. Lucy solar power project performed by Concho County Solar 1, LLC.

17)

The Group has provided a performance guarantee of OMR 2,750 thousand to Oman Power and Water Procurement Company SAOC for the Ibri 3 solar project in Oman performed by the Consortium of MASDAR, KOMIPO, AL KHADRA and OQAE.

18)

The Group has provided an equity contribution guarantee of USD 17,515 thousand to Natixis for the Ibri 3 solar project in Oman performed by KOMIPO Middle East Energy L.L.C. FZ., a subsidiary of the Group.

19)

The Group has provided a performance guarantee of OMR 667 thousand to Oman Power and Water Procurement Company SAOC as a bid bond for the Al Kamil solar project in Oman performed by the Consortium of ABU DHABI FUTURE ENERGY COMPANY PJSC MASDAR, KOMIPO and AL KHADRA.

177


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

49.

Contingencies and Commitments, Continued

(3)

Credit lines provided by financial institutions and others as of June 30, 2026 are as follows:

In millions of won and thousands of foreign currencies

Commitments

Financial institutions

Currency

Credit limit

Commitments on Bank-overdraft

Kookmin Bank and others KRW 1,780,500

Limit amount available for CP

Hana Bank and others KRW 9,750,000

General Loan, etc.

Nonghyup Bank and others KRW 2,600,000

Limit amount available for card

Woori Card and others KRW 48,458

Loan limit

Hana Bank and others KRW 3,054,695
Kookmin Bank and others USD 1,640,000

Certification of payment on payables from foreign country

Nonghyup Bank USD 8,700

Certification of payment on L/C

Kookmin Bank and others USD 1,317,858
Hana Bank and others EUR 7,031
Shinhan Bank JPY 116,773

Certification of Performance guarantee on contract

Hana Bank and others KRW 188,841
Hana Bank and others USD 1,696,728
SMTB JPY 6,500,000
Hana Bank and others EUR 387,813
Hana Bank INR 27,117
Hana Bank OMR 11,286
First Abu Dhabi Bank AED 52,500
Saudi National Bank and others SAR 120,000

Certification of bidding

Seoul Guarantee Insurance KRW 11,880
Abu Dhabi Commercial Bank and others USD 16,200
Commercial Bank of Kuwait KWD 870

Advance payment bond, Warranty bond, Retention bond and others

Seoul Guarantee Insurance KRW 110,226
Deutsche Bank Saudi and others USD 753,153
Saudi National Bank SAR 22,505
Bank ABC BHD 1,375
Shinhan Bank and others MXN 22,546

Others (*)

Shinhan Bank and others KRW 621,913
Hana Bank and others USD 1,073,954
Shinhan Bank QAR 155,213
Standard Chartered AED 50
Hana Bank SAR 4,151
MayBank MYR 30,889

Secured loan of credit sales

Hana Bank and others KRW 320,050

Inclusive credit

Hana Bank and others KRW 28,000
Shinhan Bank and others USD 35,000

Equity Bridge Loan Guarantee

DBS Bank and others USD 1,114,398

Trade finance

Kookmin Bank and others USD 600,000
(*)

As of June 30, 2026, the Group has entered into a credit extension agreement for derivatives transactions with Nonghyup Bank, Hana Bank and Woori Bank as ancillary to currency swap transactions.

178


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

49.

Contingencies and Commitments, Continued

(4)

As of June 30, 2026, promissory notes and assets provided as collaterals or pledges to financial institutions by the Group are as follows:

In millions of won and thousands of foreign currencies

Obligor

Creditor

Assets provided as
security (*2)

Currency

Amount

Description

Mira Power Limited

International Finance Corporation and others

Property, plant and Equipment and others

USD 264,800

Collateral for borrowings

(*1)

Tamra Offshore Wind Power Co., Ltd.

Kyobo Life Insurance Co., Ltd. and others

Property, plant and equipment and others

KRW 132,000

Collateral for borrowings

(*1)

Gyeonggi Green Energy Co., Ltd.

Korea Development Bank and others

Cash and cash equivalents and others

KRW 251,600

Collateral for borrowings

(*1)

Jeongam Wind Power Co., Ltd.

KDB Capital Corporation and others

Cash and cash equivalents and others

KRW 230,716 Collateral for borrowings (*1)

Gyeongju Wind Power Co., Ltd.

Shinhan Bank and others

Property, plant and equipment and others

KRW 68,400 Collateral for borrowings (*1)

Korea Offshore Wind Power Co., Ltd.

Woori Bank and others

Property, plant and equipment and others

KRW 244,500

Collateral for borrowings

(*1)

Qatrana Electric Power Company

The Islamic Development Bank and others

Finance lease receivable and property, plant and equipment and others

USD 10,320

Collateral for borrowings

(*1)

KST Electric Power Company, S.A.P.I. de C.V.

Export–Import Bank of Korea and others

Finance lease receivable and property, plant and equipment and others

USD 300,253 Collateral for debt securities (*1)

Incheon Fuel Cell Co., Ltd.

Kookmin Bank and others

Cash and cash equivalents and others

KRW 230,800

Collateral for borrowings

(*1)

K-SOLAR SHINAN Co., Ltd.

Kyobo Life Insurance Co., Ltd. and others

Property, plant and equipment and others

KRW 274,780

Collateral for borrowings

(*1)

KOSPO Youngnam Power Co., Ltd.

Shinhan Bank and others

Cash and cash equivalents and others

KRW 744,120 Collateral for borrowings (*1)

Jeju Hanlim Offshore Wind Co., Ltd.

Kookmin Bank and others

Property, plant and equipment and others

KRW 98,663 Collateral for borrowings

Western Power Changgi Solar Co., Ltd.

Samsung Life Insurance and others

Property, plant and equipment and others

KRW 45,000

Collateral for borrowings

(*1)

Yeongdeok Sunrise Wind Power Co., Ltd.

Korea Development Bank and others

Property, plant and equipment and others

KRW 96,240 Collateral for borrowings (*1)

Chitose Solar Power Plant LLC

SMTB

Cash and cash equivalents

JPY 515,265 Collateral for borrowings

Mangilao Intermediate Holdings LLC

Mizuho Bank and others

Trade receivables and others

USD 81,858 Collateral for borrowings (*1)
(*1)

This is based on the amount of loan commitment limit.

(*2)

In connection with the above borrowings, an assignment of rights as collateral, a revolving pledge on insurance claims under insurance contracts, revolving mortgages on factory foundations and revolving pledges on deposits, etc. have been established.

The Group has W1,197 million of project loans from the Korea Energy Agency as of June 30, 2026. The Group has provided one blank check as security for the repayment of the borrowings.

179


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

49.

Contingencies and Commitments, Continued

(5)

The Group temporarily suspended operations of the Gangneung hydroelectric generating plant, with a carrying amount of W53,909 million as of June 30, 2026, to improve the quality of water used in generating electricity. The expenses related to the suspension of operations of W226 million and depreciation on the idle assets of W1,797 million are recorded in other expenses for the six-month period ended June 30, 2026. Regarding the improvement of water quality, the results of damages compensation for the local residents cannot be reasonably estimated, and the Group is in negotiations with Gangneung City and related stakeholders to restart the Gangneung hydroelectric generating plant as of June 30, 2026.

(6)

As the government of the Republic of Korea announced the suspension of operation in Gaeseong Industrial District, it is uncertain if the Group can exercise the property rights for the Group’s facility in Gaeseong Industrial District as of June 30, 2026. Accordingly, the book value of the facility, amounting to W11,778 million, was recognized as an impairment loss, and trade receivables related to companies residing in the Gaeseong Industrial District were fully written off. As of June 30, 2026, the Group cannot make reasonable estimation on whether assets will be recovered or utilized in regular way related thereto.

(7)

As of June 30, 2026, the Group owns land at 6171-1 Nuri-ri, Yeongi-myeon, Sejong Special Self-Governing City as PP&E with limited ownership, and its book value is W64,371 million.

(8)

The Korea Institute of Energy Technology (KENTECH) was established in April, 2020, in accordance with the “Basic plan for the establishment of KENTECH (July, 2019)”. By the special law to create KENTECH, the Group, government, and local government may contribute to the fund. The Group will decide whether to contribute to the fund on a board resolution after consulting with relevant organizations considering its financial situation by year.

(9)

The ongoing armed conflict in Ukraine started in February, 2022 and relevant sanctions against Russia imposed by the international community can impact not only sanctioned entities but also the entities doing business directly or indirectly with Ukraine or Russia and the entities exposed directly or indirectly to industries or economy of Russia or Ukraine. The Group cannot make reasonable estimation of the financial impact of the recent conflict in Ukraine on the future events.

(10)

The Group believes that a potential obligation for mutual growth cooperation funds exists in connection with the nuclear power plants for which continued operation is being pursued as their design lives are close to expiration, considering past practices in the operation of nuclear power plants. As of June 30, 2026, the amount and terms of the payment have not been agreed upon, and therefore the Group cannot reasonably estimate the possibility of an outflow of economic benefits resulting from the fulfillment of the obligation.

(11)

The armed conflict in the Middle East that began in February 2026 and the related changes in the international situation may affect companies doing business directly or indirectly with the countries involved in the conflict, as well as companies directly or indirectly exposed to the industries or economies of those countries. The Group cannot reasonably estimate the future financial impact of the conflict in the Middle East.

180


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

50.

Subsequent Events

(1)

Subsequent to June 30, 2026, KEPCO and its subsidiaries, Korea South-East Power Co., Ltd., Korea Midland Power Co., Ltd., Korea Western Power Co., Ltd., Korea Southern Power Co., Ltd. and Korea East-West Power Co., Ltd., issued bonds denominated in Korean won and foreign currencies for the purposes of operating funds and debt repayments. Details are as follows:

In millions of won and thousands of foreign currencies

Company

Type

Issue date Maturity Interest rate
(%)

Amount

Korea Electric Power Corporation

#1600 Corporate bond 2026.07.02 2028.10.10 4.04 W510,000
#1601 Corporate bond 2026.07.02 2029.04.03 4.09 300,000
#1602 Corporate bond 2026.07.02 2029.07.02 4.12 700,000
#1603 Corporate bond 2026.07.15 2029.07.13 4.24 300,000
#1604 Corporate bond 2026.07.09 2029.05.03 4.17 600,000
#1605 Corporate bond 2026.07.09 2029.07.09 4.26 50,000
#1606 Corporate bond 2026.08.06 2029.05.03 4.07 290,000
#1607 Corporate bond 2026.08.06 2029.08.06 4.11 780,000
#1608 Corporate bond 2026.08.12 2028.08.11 4.00 80,000
#1609 Corporate bond 2026.08.12 2029.08.10 4.22 70,000
#1610 Corporate bond 2026.08.12 2031.08.12 4.41 50,000
#19 Global bond 2026.07.21 2031.07.21 4.75 USD 300,000
#20 Global bond 2026.07.21 2029.07.21

Compounded
Daily SOFR
+ 0.62


%
USD 400,000

Korea South-East Power Co., Ltd.

#74-1 Corporate bond 2026.07.27 2029.07.27 4.45 220,000
#74-2 Corporate bond 2026.07.27 2036.07.25 4.96 40,000

Korea Midland Power Co., Ltd.

#79-1 Corporate bond 2026.07.09 2028.07.09 4.16 30,000
#79-2 Corporate bond 2026.07.09 2029.07.09 4.24 200,000
Debt securities in foreign currencies 2026.07.28 2029.07.28 4.75 USD 300,000

Korea Western Power Co., Ltd.

#80-1 Corporate bond 2026.07.27 2028.07.27 4.34 250,000
#80-2 Corporate bond 2026.07.27 2029.07.27 4.45 330,000

Korea Southern Power Co., Ltd.

#86 Corporate bond 2026.07.14 2029.07.13 4.27 200,000

Korea East-West Power Co., Ltd.

#26-1 Debt securities in foreign currencies 2026.07.13 2032.01.13 4.75 USD 500,000
(2)

On July 2, 2026, KEPCO invested W20,000 million in KEPCO Engineering Holdings Co., Ltd.

181


KOREA ELECTRIC POWER CORPORATION AND ITS SUBSIDIARIES

Notes to the condensed consolidated interim financial statements, Continued

June 30, 2026 and 2025 (unaudited)

51.

Adjusted Operating Profit (Loss)

The operating profit (loss) in the Group’s consolidated statements of comprehensive income or loss prepared in accordance with KIFRS included in this report differs from that in its consolidated statements of comprehensive income or loss prepared in accordance with IFRS Accounting Standards as issued by the IASB. The table below sets forth a reconciliation of the Group’s results from operating activities as presented in the Group’s consolidated interim statements of comprehensive income or loss prepared in accordance with KIFRS for each of the three and six-month periods ended June 30, 2026 and 2025 to the operating profit or loss as presented in the Group’s consolidated interim statements of comprehensive income or loss prepared in accordance with IFRS as issued by IASB for each of the corresponding periods.

In millions of Won June 30, 2026 June 30, 2025
Three-month
period ended
Six-month
period ended
Three-month
period ended
Six-month
period ended

Operating profit on the interim consolidated statements of comprehensive income (loss)

W 1,128,552 4,912,721 2,135,872 5,889,479

Add

Other income

Reversal of other provisions

3,675 5,906 970 4,083

Reversal of other bad debt allowance

(22,910 ) 2,659 (757 ) 5,743

Gains on government grants

58 120 55 102

Gains on assets contributed

71 2,894 1,332 1,513

Gains on liabilities exempted

929 981 427 707

Compensation and reparations revenue

20,561 46,204 25,688 45,895

Revenue from foundation fund

25 36 9 163

Rental income

50,223 103,078 52,340 105,189

Others

7,771 55,160 13,309 22,785

Other gains

Gains on disposal of property, plant and equipment

1,926 3,627 2,712 8,075

Gains on disposal of intangible assets

—  —  16 16

Reversal of impairment loss on property, plant and equipment

—  1 —  — 

Reversal of impairment loss on intangible assets

47 47 40 40

Gains on foreign currency translation

16,634 57,417 9,677 13,839

Gains on foreign currency transactions

27,726 47,812 31,125 75,738

Gains on insurance proceeds

1,281 2,081 1,015 1,015

Others

92,376 192,363 109,052 281,516

Deduct

Other expenses

Compensation and indemnification expense

—  —  (1,309 ) (1,310 )

Accretion expenses of other provisions

(625 ) (672 ) (315 ) (755 )

Depreciation expenses on investment properties

(217 ) (473 ) (313 ) (508 )

Depreciation expenses on idle assets

(896 ) (1,797 ) (903 ) (1,807 )

Other bad debt expense

(69,275 ) (69,275 ) —  (2 )

Donations

(11,692 ) (84,764 ) (64,634 ) (76,745 )

Others

(7,689 ) (11,453 ) (7,746 ) (13,971 )

Other losses

Losses on disposal of property, plant and equipment

(19,253 ) (39,202 ) (12,982 ) (50,140 )

Losses on disposal of intangible assets

(1 ) (1 ) —  (13 )

Loss on impairment of property, plant and equipment

—  (825 ) —  — 

Loss on impairment of intangible assets

—  (1,115 ) (30 ) (30 )

Losses on foreign currency translation

(4,176 ) (31,100 ) (36,974 ) (47,056 )

Losses on foreign currency transactions

(44,916 ) (85,578 ) (17,706 ) (37,394 )

Others

(14,913 ) (77,092 ) (65,334 ) (126,423 )

Adjusted operating profit

W 1,155,292 5,029,760 2,174,636 6,099,744

182